Skyharbour Resources Ltd.

Published : July 14th, 2016

Moore Lake

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

Moore Lake

Skyharbour Secures Option to Acquire 100% of Moore Lake Uranium Project from Denison and Announces David Cates to Join Board of Directors

Vancouver, BC - Skyharbour Resources Ltd. (TSX-V: SYH)(OTC Grey: SYHBF) (Frankfurt: SC1N) (the 'Company') is pleased to announce the signing of an agreement with Denison Mines Corp. (TSX: DML) (NYSE MKT: DNN) ('Denison') that grants the Company an option to acquire a 100% interest in the Moore Lake Uranium Project ('Option Agreement'). The 35,705 hectare Moore Lake Project is an advanced uranium exploration property strategically located in the eastern portion of the Athabasca Basin region, which is known for its large scale and high grade uranium deposits and producing uranium mines. Previous exploration efforts on the property discovered high grade uranium mineralization highlighted by drill hole ML-61, which intersected 4.03% eU O over 10 metres at the Maverick Zone. The depth to the unconformity on the property is relatively shallow and significant additional discovery potential remains over several conductive trends.

Skyharbour's Uranium Project Map in the Athabasca Basin:
http://skyharbourltd.com/_resources/SYH_Landpackage_2014.jpg

Highlights:

  • Option to acquire 100% interest in the Moore Lake Uranium Project, a mature uranium exploration property in the eastern Athabasca Basin near existing infrastructure with known high grade uranium mineralization and significant discovery potential
  • As part of the Option Agreement, Skyharbour will issue 18,000,000, on a pre-consolidated basis, common shares and make staged cash payments over five years totaling $500,000 to Denison as well as incur $3,500,000 in exploration expenditures over five years to complete its acquisition of a 100% interest in the property (detailed terms provided below)
  • Denison to become large, strategic shareholder of Skyharbour, holding approximately 18.7% of the shares outstanding (including Denison's existing share position in the Company) and David Cates, Denison President and CEO, to join Skyharbour's Board of Directors
  • Moore Lake hosts a high grade uranium pod called the Maverick Zone, which was discovered by JNR Resources in 2002; drill results include 4.03% eU O over 10 metres, including 20% eU O over 1.4 metres starting at a depth of 264.68 metres in hole ML-61, plus 5.14% U O over 6.2 metres in hole ML-55, and 4.01% U O over 4.7 metres in hole ML-48
  • The property has been the subject of extensive exploration with approx. $30 million in expenditures and over 132,000 metres of Diamond drilling in 370 drill holes
  • In addition to the Maverick Zone, Diamond drilling in several other target areas has intersected multiple conductors associated with significant structural disruption, strong alteration and anomalous uranium and pathfinder element concentrations
  • Skyharbour adds a high grade uranium asset to its project portfolio with significant exploration upside to complement its other projects in the Basin

Skyharbour's President and CEO, Jordan Trimble commented, 'We are very pleased to have reached an agreement with Denison to acquire up to a 100% interest in Moore Lake, as this is a transformational deal for Skyharbour. Uranium properties with the pedigree and potential of Moore Lake are few and far between. The project has extensive historical exploration, high grade mineralized results including 4.03% eU O over 10 metres, and several shallow exploration targets that remain with the potential to generate further discoveries. With a recovery in the uranium market on the horizon, Skyharbour views this transaction as a unique opportunity to acquire a prime exploration property before the next uranium bull cycle begins. Having Denison onboard as a strategic shareholder and David Cates joining our Board of Directors serves to bolster Skyharbour's profile and access to capital markets moving forward. We believe this is a highly accretive deal for the Company's shareholders as we add a high grade uranium property with strong exploration upside potential to our portfolio to complement our other uranium projects in the Basin.'

Moore Lake Uranium Project:

The Moore Lake Uranium Project consists of 12 contiguous claims totaling 35,705 hectares located 42 kilometres northeast of the Key Lake mill, approx. 20 kilometres east of Denison's Wheeler River project, and 39 kilometres south of Cameco's McArthur River mine. Unconformity-hosted uranium mineralization was discovered on the property at the Maverick Zone in 2002 and several high grade intercepts have been drilled since. Drill hole ML-61 contained the best result drilled on the property to date, which returned 4.03% eU O over 10 metres, including 20% eU O over 1.4 metres, starting at a depth of 264.68 metres. Drill holes ML-55 and ML-48 also encountered high-grade mineralization, returning 5.14% U O over 6.2 metres, and 4.01% U O over 4.7 metres, respectively. The depth to the unconformity on the property is relatively shallow, with the thickness of the sandstone cover varying from less than 125 metres on the property's eastern side to over 325 metres on the property's northwestern side. Basement rocks are predominantly paragneisses belonging to the Wollaston Domain. A large mafic sill known as the 'Moore Lake complex' partially overlies a portion of the eastern side of the property. The property has been the subject of extensive historic exploration with approx. $30 million in expenditures, and over 132,000 metres of Diamond drilling completed in 370 drill holes. The project is accessible via ice roads from the McArthur River mine haul road and float or ski equipped aircraft.

Moore Lake Uranium Project Claims Map:
http://skyharbourltd.com/_resources/maps/MooreLakeRegionalTenure.jpg

Since 1969, the property has undergone episodic exploration by several companies including Noranda, AGIP, BRINEX, Cogema, Kennecott/JNR Resources and IUC/Denison. In April of 2002 the Maverick Zone was discovered and in the fall of 2003, International Uranium Corporation, who then merged with Denison, optioned 75% of the property from JNR and took over operatorship. Subsequently Denison acquired the remaining 25% interest from JNR for an undivided 100% in February of 2013, when it acquired all of the outstanding shares of JNR. Skyharbour's head geologist and director Rick Kusmirski was the President and CEO of JNR Resources during that time. Exploration programs carried out on the project lands include an assortment of airborne and ground electromagnetic and magnetic surveys, ground gravity, seismic, IP/resisitivity and geochemical surveys, mapping, prospecting, lake sediment sampling programs and the drilling of some 370 Diamond drill holes. From mid-2000 onwards, the primary focus of exploration has been the 3.5 kilometre long Maverick structural corridor where pods of high grade unconformity-type uranium mineralization have been intersected. The best intercepts to date were obtained from drill holes testing the southwestern portion of this corridor. The potential of intersecting additional mineralization along this corridor is very good and as such it will continue to be a high priority target area. Also of note is that both basement and unconformity-type uranium mineralization have been intersected in a number of underexplored target areas on the property.

Moore Lake Uranium Project Geophysics Map:
http://skyharbourltd.com/_resources/maps/MooreLake-Basic-geo-revamp.jpg

In addition to the Maverick Zone, Diamond drilling in several other geophysical target areas, has intersected multiple conductors associated with significant structural disruption, strong alteration and anomalous uranium and pathfinder element concentrations. This bodes well for the possibility of discovering additional high grade uranium zones in these areas.

Under the Option Agreement, Skyharbour will become the operator of the Moore Lake project and is planning to complete additional infill and exploratory drilling on the Maverick Zone as well as on other high priority target areas on the property. The initial drill program is being planned with input from both the Skyharbour and Denison technical teams.

Skyharbour's Head Technical Advisor and a Director, Rick Kusmirski commented: 'I've always considered the Moore Lake Project to be one of the most geologically prospective exploration projects in the Basin, with the potential to host a sizeable high grade uranium deposit. JNR made the initial high grade discovery at the Maverick Zone and after a number of years we sold the project and company to Denison. I am very excited to get back to work on this project with the Skyharbour team. In addition to the Maverick structural corridor, which still has a number of targets that are untested and require follow-up, there are at least nine other target areas throughout the property that contain well defined and extensive conductive systems. The nominal amount of drilling that was carried out in these areas intersected well defined structures associated with multiple graphitic lithologies. Analysis of the drill core returned highly anomalous geochemistry, including uranium mineralization in seven of the target areas.'

David Cates, President and CEO of Denison, Joins Board of Directors:

The Company is pleased to announce that David Cates, President and CEO of Denison and Uranium Participation Corp. (TSX: U), will be joining Skyharbour's Board of Directors. Mr. Cates is a Chartered Professional Accountant (CPA, CA) and holds Master of Accounting (MAcc) and Honours Bachelor of Arts (BA) degrees from the University of Waterloo. Prior to his appointment as President and CEO of Denison, Mr. Cates served as Denison's Vice President Finance, Tax and CFO. As CFO, Mr. Cates played a key role in the Company's mergers and acquisitions activities - leading the acquisition of Rockgate Capital Corp. and International Enexco Ltd. Mr. Cates joined Denison in 2008 and held the position of Director, Taxation prior to his appointment as Chief Financial Officer. Prior to joining Denison, Mr. Cates held positions at Kinross Gold Corp. and PwC LLP with a focus on the resource industry. As part of the Option Agreement, Denison is entitled to nominate a member to Skyharbour's Board of Directors, so long as Denison maintains a minimum ownership position of 5% in the Company.

Denison's President and CEO, David Cates commented: 'Denison is continuing to focus its efforts and budgets on the Company's flagship Wheeler River project - which is in the process of advancing from a successful Preliminary Economic Assessment to a Prefeasibility Study together with extensive exploration focused on delineating new and existing resources. Partnering with Skyharbour is the perfect way to ensure Moore Lake continues to be explored for potentially significant mineralization. While Denison wasn't actively looking to sell its position in the Moore Lake property, we couldn't pass on an opportunity to join forces with the dynamic leadership team at Skyharbour and their strong will to take Moore Lake through the next phase of exploration.'

Terms of the Agreement:

Under the terms of the Option Agreement, which is subject to TSX Venture Exchange approval, Skyharbour may acquire a 100% interest in the Moore Lake project in consideration for the issuance of 18,000,000 pre-consolidated shares and staged cash payments totaling $500,000 over the next five years (all dollar figures are Canadian dollars). Skyharbour has also agreed to fund $3,500,000 in exploration expenditures on the Moore Lake Project over the same five year period and will act as project operator. Skyharbour must make the aggregate cash payment of $500,000 to Denison and incur expenditures of $3,500,000 on the property on or before July 31st, 2021 in accordance with the following schedule:

  • $50,000 in cash and $500,000 in exploration expenditures on or before July 31st, 2017
  • $50,000 in cash and $500,000 in exploration expenditures on or before July 31st, 2018
  • $100,000 in cash and $500,000 in exploration expenditures on or before July 31st, 2019
  • $100,000 in cash and $1,000,000 in exploration expenditures on or before July 31st, 2020
  • $200,000 in cash and $1,000,000 in exploration expenditures on or before July 31st, 2021

Once Skyharbour acquires its 100% interest in the property, Denison may exercise a buyback option ('Buyback Option') to repurchase a 51% interest in the property by making a cash payment of $200,000 and spending $6,750,000 in exploration expenditures on the property over the following three year period. The parties would then form a joint venture. If Denison fails to complete the Buyback Option, Skyharbour would retain 100% ownership in the property.

Provided this first Buyback Option is not exercised by Denison, Skyharbour would own 100% of the property and would have an additional five year period to incur an additional $3,000,000 in exploration expenditures on the project ('Additional Expenditures'). At this point, Denison may elect to exercise a second buyback option to repurchase a 51% interest in the property by making a cash payment of $500,000 and spending $16,500,000 in exploration expenditures on the property over the following four year period. The parties would then form a joint venture. If Denison fails to complete this second buyback option, Skyharbour would retain 100% ownership in the property.

Provided the first Buyback Option was not exercised by Denison and Skyharbour does not complete the Additional Expenditures within the allotted five year period, Denison may elect to exercise a buyback option at any time to repurchase a 51% interest in the property by making a cash payment of $500,000 and spending at least 2.5 times the expenditures incurred by Skyharbour since the beginning of the Option Agreement. The parties would then form a joint venture.

Private Placement and Share Consolidation:

Skyharbour has received board approval for the consolidation of the Company's issued and outstanding share capital. The intended consolidation will be on a basis of one post-consolidation common share for every four pre-consolidation common shares. This consolidation will reduce the issued and outstanding shares of the Company from 89,043,594 (pre-Moore Lake Option Agreement) to approximately 22,260,890 shares, assuming no other change in the issued capital. Skyharbour's outstanding options and warrants will also be adjusted on the same basis (4 for 1) as the common shares, with proportionate adjustments being made to exercise prices. The Company does not intend to change its name or its current trading symbol in connection with the proposed share consolidation. The consolidation is subject to approval by the TSX Venture Exchange.

Skyharbour also announces that it has arranged a non-brokered private placement of up to 13,000,000 units (the 'Unit') at a price of $0.15 per unit on a post-consolidation basis to raise proceeds of up to $1,950,000. Each Unit consists of one common share and one non-transferable share purchase warrant (the 'Warrant'). Each Warrant will entitle the holder to purchase one common share for a period of five years at a price of $0.27 per share, on a post-consolidation basis. The Company intends to utilize the proceeds from this private placement for exploration and general working capital purposes. A finder's fee of up to 7% cash and 7% non-transferable warrants (the 'Finder's Warrants') may be paid in connection with part of this private placement. Each Finder's Warrant will entitle the finder to purchase a common share at a price of $0.27 per share, on a post-consolidation basis, for a period of two years from the closing date of the private placement. The private placement is subject to TSX Venture Exchange acceptance.

Qualified Person:

Richard Kusmirski, P.Geo., M.Sc., Skyharbour's Head Technical Advisor and a Director, as well as a qualified person, has reviewed and approved the technical aspects of this news release and is the Qualified Person as defined by National Instrument 43-101. All historical results regarding the Moore Lake Uranium project have come from publicly disclosed information and Rick Kusmirski, a Director of Skyharbour, was the President of JNR Resources during the relevant period.

About Skyharbour Resources Ltd.:

Skyharbour holds an extensive portfolio of uranium and thorium exploration projects in Canada's Athabasca Basin and is well positioned to benefit from improving uranium market fundamentals with five drill-ready projects. In addition to the Moore Lake Uranium Project Option, the Company owns a 100% interest in the Falcon Point (formerly Way Lake) Uranium Project on the eastern perimeter of the Basin which hosts an NI 43-101 inferred resource totaling 7.0 million pounds of U O at 0.03% and 5.3 million pounds of ThO at 0.023%. The project also hosts a high grade surface showing with up to 68% U O in grab samples from a massive pitchblende vein, the source of which has yet to be discovered. Skyharbour has a 50% interest in the large, geologically prospective Preston Uranium Project proximal to Fission Uranium's Triple R deposit as well as NexGen Energy's Arrow deposit. The Company's 100% owned Mann Lake Uranium project on the east side of the Basin is strategically located adjacent to the Mann Lake Joint Venture operated by Cameco with partners Denison Mines and AREVA, where high-grade uranium mineralization was recently discovered. Skyharbour's goal is to maximize shareholder value through new mineral discoveries, committed long-term partnerships, and the advancement of exploration projects in geopolitically favourable jurisdictions.

To find out more about Skyharbour Resources Ltd. (TSX-V: SYH) visit the Company's website at www.skyharbourltd.com.

SKYHARBOUR RESOURCES LTD.

'Jordan Trimble'

Jordan Trimble
President and CEO

For further information contact myself or:
Nick Findler
Corporate Communications
Skyharbour Resources Ltd.
Telephone: 604-687-3376
Toll Free: 800-567-8181

Facsimile: 604-687-3119
Email: [email protected]

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THE CONTENT OF THIS NEWS RELEASE.

This release includes certain statements that may be deemed to be 'forward-looking statements'. All statements in this release, other than statements of historical facts, that address events or developments that management of the Company expects, are forward-looking statements. Although management believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance, and actual results or developments may differ materially from those in the forward-looking statements. The Company undertakes no obligation to update these forward-looking statements if management's beliefs, estimates or opinions, or other factors, should change. Factors that could cause actual results to differ materially from those in forward-looking statements, include market prices, exploration and development successes, continued availability of capital and financing, and general economic, market or business conditions. Please see the public filings of the Company at www.sedar.com for further information.

Read the rest of the article at www.publicnow.com
Data and Statistics for these countries : Jordan | All
Gold and Silver Prices for these countries : Jordan | All

Skyharbour Resources Ltd.

EXPLORATION STAGE
CODE : SYH.V
ISIN : CA8308162038
CUSIP : 830816 10 4
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Skyharbour Res. is a uranium exploration company based in Canada.

Skyharbour Res. holds various exploration projects in Canada.

Its main exploration properties are SOUTH BAY, MCKENZIE ISLAND, SIDACE LAKE, HEYSON, BROULAN REEF and BAIRD in Canada.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of Skyharbour Resources Ltd.
1/13/2015Announces Approval to Warrant Extension Application
8/30/2013Closes Additional Financing and Early Warning Report Filed o...
8/15/2013Closes Private Placement
3/25/2010Arranges Flow-Through Private Placement
Nominations of Skyharbour Resources Ltd.
7/28/2016Paul Matysek Joins Skyharbour’s Advisory Board
6/5/2013Appoints New President, CEO & Director
4/24/2013Adopts an Advance Notice Policy for Election of Directors
3/21/2013Skyharbour Appoints Richard Kusmirski to Head Advisory Board
3/21/2013Appoints Richard Kusmirski to Head Advisory Board
Project news of Skyharbour Resources Ltd.
10/7/2016Files NI 43-101 Technical Report on Moore Lake Property, Sas...
2/27/2014Western Athabasca Syndicate Receives Drill Permits for the P...
2/20/2014The Western Athabasca Syndicate Identifies 23 Gravity Low An...
1/7/2014The Western Athabasca Syndicate Updates the Ongoing Winter E...
12/11/2013Mid=2DDay Breaking News from Skyharbour Resources and Klondi...
12/11/2013The Western Athabasca Syndicate Commences Winter Exploration...
11/27/2013Western Athabasca Syndicate Discovers Additional Radon Anoma...
11/5/2013The Western Athabasca Syndicate Identifies Eight High Potent...
10/10/2013Western Athabasca Syndicate Identifies Uranium Anomalies at ...
9/26/2013Western Athabasca Syndicate Discovers Strong Radon Anomalies...
9/19/2013Western Athabasca Syndicate Commences Phase Three of Explora...
9/5/2013Western Athabasca Syndicate Provides Update on Fieldwork at ...
8/16/2013Alpha and Fission's New Uranium Discovery Zone
7/23/2013Western Athabasca Syndicate Extends VTEM Plus Geophysical Co...
7/10/2013Athabasca Nuclear, Noka and Lucky Strike Agreement to form W...
5/27/2013Commences Exploration Program at its Patterson Lake Uranium ...
5/14/2013Grants Lucky Strike a 25% Earn-In Option on 400,000 Acre Lan...
12/15/2008(South Bay)Identifies 3 High-Priority Targets on South Bay Project, NW ...
7/10/2008(South Bay)Additional Assay Results Announced from South Bay Mine Proje...
5/9/2008(South Bay)Updates Drilling at South Bay Mine Project, NW Ontario
4/23/2008(South Bay)Results on Initial Drilling at South Bay Mine Project, NW On...
4/18/2008(South Bay)Discovered in 100 Metre Step-Out Hole at former South Bay Mi...
4/8/2008(South Bay)Drilling Starts on Step-Out Hole at South Bay Project, Red L...
4/3/2008(South Bay)Drilling Identifies Massive Sulphide Zone on South Bay Proje...
2/25/2008(South Bay)' Drilling Program Begins on South Bay Cu-Zn-Ag Project, Red...
2/21/2008(Burns Block (rainy River))Exploration Program Underway on Rainy River Claim Block, NW ...
2/11/2008(South Bay)Drill Program to Begin on South Bay Cu-Zn Project, Red Lake,...
1/28/2008(Broulan Reef) NEW Progress Map of Deep Drill Hole on Broulan Reef Gold Pr...
1/8/2008(Red Lake)Deep Drilling Resumes on Red Lake Gold Project, NW Ontario
10/31/2007(Burns Block (rainy River))Drilling Starts on Rainy River Claim Block "D2", NW Ontario
9/28/2007(Burns Block (rainy River))Drilling Commences on Rainy River Gold Claim Block, NW Ontar...
Corporate news of Skyharbour Resources Ltd.
7/28/2016Paul Matysek Joins Skyharbour's Advisory Board
7/14/2016Skyharbour Increases Financing to $2.25 Million
7/14/2016Skyharbour Secures Option to Acquire 100% of Moore Lake Uran...
7/14/2016Moore Lake
7/4/2016News Release
6/7/2016Video-Corporate Presentation for Skyharbour Resources Ltd.
1/21/2016Skyharbour Resources to Participate in Upcoming Conference i...
12/16/2015Aben Resources Sells Interest in Mann Lake Property to Skyha...
12/16/2015Skyharbour Resources Purchases Remaining Interest in Mann La...
10/27/2015Skyharbour Samples up to 68% U3O8 at Falcon Point Uranium Pr...
10/27/2015Skyharbour Samples Up to 68% U3O8 at Falcon Point Uranium Pr...
10/23/2015Skyharbour Reports Results from 2015 Diamond Drilling Progra...
10/23/2015Skyharbour Reports Results From 2015 Diamond Drilling Progra...
10/2/2015Corporate Document-Factsheet for Skyharbour Resources Ltd.
10/2/2015Corporate Document-Factsheet for Skyharbour Resources Ltd.
10/1/2015Directors Re-Elected at AGM
10/1/2015Skyharbour Resources Ltd. Report Directors Re-Elected at AGM
10/1/2015Skyharbour Resources Ltd. Report Directors Re-Elected at AGM
8/18/2015Skyharbour Commences Summer Drill Program at Preston Uranium...
8/18/2015Skyharbour Commences Summer Drill Program at Preston Uranium...
8/6/2015Video-Corporate Presentation for Skyharbour Resources Ltd.
8/6/2015Video-Corporate Presentation for Skyharbour Resources Ltd.
7/31/2015Skyharbour Announces AGM and Warrant Extension Application
7/31/2015Skyharbour Announces AGM and Warrant Extension Application
7/27/2015Skyharbour Update on Summer Drill and Field Programs, Assess...
7/27/2015Skyharbour Update on Summer Drill and Field Programs, Assess...
7/21/2015Skyharbour Intersects 0.172% U3O8 over 2.5 Metres from 2015 ...
7/21/2015Skyharbour Intersects 0.172% U3O8 Over 2.5 Metres From 2015 ...
7/16/2015Skyharbour Announces Options
7/16/2015Skyharbour Announces Options
7/15/2015Skyharbour Announces Options
7/15/2015Skyharbour Announces Options
7/9/2015Video-Corporate Presentation for Skyharbour Resources Ltd.
7/9/2015Video-Corporate Presentation for Skyharbour Resources Ltd.
4/15/2015Skyharbour Resources Ltd. : Discovers Significant Radon and ...
4/15/2015Skyharbour Resources Ltd. : Discovers Significant Radon and ...
4/15/2015Western Athabasca Syndicate Discovers Significant Radon and ...
4/15/2015Western Athabasca Syndicate Discovers Significant Radon and ...
4/8/2015Corporate Profile for Skyharbour Resources Ltd.
4/8/2015Corporate Profile for Skyharbour Resources Ltd.
4/7/2015Video-Corporate Presentation for Skyharbour Resources Ltd.
4/7/2015Video-Corporate Presentation for Skyharbour Resources Ltd.
3/23/2015Skyharbour Commences Winter Drill Program at its Falcon Poin...
3/23/2015Skyharbour Commences Winter Drill Program at its Falcon Poin...
3/23/2015Skyharbour Confirms Filing of NI 43-101 Technical Report and...
3/23/2015Skyharbour Confirms Filing of NI 43-101 Technical Report and...
3/20/2015Skyharbour Confirms Filing of NI 43-101 Technical Report and...
3/20/2015Skyharbour Confirms Filing of NI 43-101 Technical Report and...
3/16/2015Skyharbour Announces Tamás Bakacs Joins Advisory Board
3/16/2015Skyharbour Announces Tamás Bakacs Joins Advisory Board
3/16/2015Skyharbour Resources Ltd.: Skyharbour Announces Tamas Bakacs...
3/16/2015Skyharbour Resources Ltd. : Skyharbour Announces Tamás Bakac...
3/16/2015Skyharbour Resources Ltd. : Skyharbour Announces Tamás Bakac...
3/16/2015Skyharbour Announces Tamas Bakacs Joins Advisory Board
3/16/2015Skyharbour Announces Tamas Bakacs Joins Advisory Board
3/11/2015Skyharbour Receives Drill Permits for its Falcon Point Urani...
3/11/2015Skyharbour Receives Drill Permits for its Falcon Point Urani...
3/3/2015Skyharbour Resources Ltd. : The Western Athabasca Syndicate ...
3/3/2015The Western Athabasca Syndicate Commences its Winter Field P...
3/3/2015The Western Athabasca Syndicate Commences Its Winter Field P...
2/26/2015Skyharbour Closes Non-Brokered Private Placement of $1.25 Mi...
2/7/2015Document for Skyharbour Resources Ltd.
11/3/2014Skyharbour Identifies Basement Conductor Targets at Mann Lak...
9/9/2014Skyharbour AGM Held-Six Directors Re-Elected
4/28/2014Skyharbour Announces Richard Kusmirski, M.Sc., P.Geo., Joins...
4/15/2014Western Athabasca Syndicate Provides Drill Program Update at...
3/31/2014Skyharbour Resources Closes Private Placement and Raises Add...
2/5/2014President / CEO Jordan Trimble Interviewed on BNN
2/4/2014Important Shareholder Update
1/23/2014Skyharbour Resources=3A Right Timing=2C Right Time
9/13/2013Rated Hot Performer at the Sept. 2013 Toronto Conference
9/11/2013and Syndicate Partners to Open Toronto Stock Exchange
9/5/2013Mid=2DDay Breaking News From Skyharbour=2C Cub Energy=2C and...
8/8/2013Western Athabasca Syndicate Completes VTEM and Radiometric S...
6/28/2013Skyharbour Resources=3A Memorandum of Understanding for Uran...
6/24/2013Memorandum of Understanding for Uranium Properties Totaling ...
5/16/2013Skyharbour Grants Noka Resources a 25% Earn-In Option on 400...
5/16/2013Grants Noka Resources a 25% Earn-In Option on 400,000 Acre U...
5/8/2013(Broulan Reef)Cypress Development and Skyharbour Resources Complete Sale o...
4/11/2013Completes Patterson Lake Properties Acquisition, Saskatchewa...
3/27/2013Skyharbour Increases Land Package Near Patterson Lake South ...
3/27/2013Skyharbour Increases Land Package Near Patterson Lake South ...
3/27/2013Increases Land Package Near Patterson Lake South High Grade ...
3/20/2013Acquires Significant U3O8 Land-Package in Patterson Lake Are...
2/20/2013Director Resigns
3/1/2011Incentive Stock Options Cancelled and Skyharbour's Interest ...
2/22/2011Share Consolidation to Take Place February 23, 2011
9/15/2009Consolidated Abaddon to Earn 100% in Lithium and Rare Earth ...
8/1/2008and Cypress Provide Update on their Red Lake / Bruce Channel
10/17/2007Drilling Commences on Broulan Reef Gold Project in Red Lake,...
9/18/2007Drilling to Commence on Rainy River Gold Claim, NW Ontario
9/14/2007Deep Drill Program on Skyharbour's / Cypress' Broulan Reef G...
9/12/2007Drill Program Planned for South Bay Project, Red Lake, Ontar...
7/10/2007Deep Drill Rig Contracted for Gold Project in Red Lake, Onta...
5/29/2007Interest in Broulan Reef Gold Project Earned, Red Lake, Onta...
3/29/2007Major Geophysical Program Completed on South Bay Cu-Zn Proje...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (SYH.V)Other OTC (SYHBF)
0.390-3.70%0.285+1.42%
TSX-V
CA$ 0.390
11/14 15:53 -0.020
-3.7%
Prev close Open
0.405 0.395
Low High
0.390 0.398
Year l/h YTD var.
0.315 -  0.600 -11.36%
52 week l/h 52 week var.
0.315 -  0.640 -31.58%
Volume 1 month var.
287,480 -12.36%
24hGold TrendPower© : 19
Produces
Develops
Explores for Copper - Gold - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 1/6/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2024-17.02%0.600.32
202328.77%0.640.33
2022-21.51%0.840.29
202182.35%0.870.23
202059.38%0.280.08
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 6.69-0.15%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 8.39+3.84%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.61+3.40%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06-8.33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
 2.11+1.44%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
 13.51+4.00%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
 0.30+7.14%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
 0.20+2.56%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
 2.22+2.30%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 39.28+0.45%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.10-4.55%Trend Power :
Sun Res.(Oil)SUR.AX
Released ASX Announcement: Quarterly Activities Report
AU$ 0.00+0.00%Trend Power :
Take advantage of rising gold stocks
  • Subscribe to our weekly mining market briefing.
  • Receive our research reports on junior mining companies
    with the strongest potential
  • Free service, your email is safe
  • Limited offer, register now !
Go to website.