INTERNATIONAL ENEXCO ANNOUNCES AN INCREASE OF 49% TO 1.06 BILLION POUNDS OF COPPER IN MEASURED AND INDICATED RESOURCES AT ITS CONTACT COPPER PROJECT, NEVADA
Vancouver, Canada -- October 10, 2012 - International Enexco Ltd. (TSX-V: IEC; OTCQX: IEXCF; Frankfurt: IE6) (the "Company" or "Enexco") is pleased to announce an updated mineral resource estimate has been completed for its 100%-owned Contact Copper Project in northeast Nevada. Measured plus Indicated resources contain an estimated 1.06 billion pounds of copper, an increase of 49% over the previous estimate.
Mineral Resource Estimate reported at 0.10% Copper cut-off.
Category
Tons
Copper (%)
Pounds Copper
Measured
58,977,000
0.26
306,680,000
Indicated
156,733,000
0.24
752,318,000
Measured + Indicated
215,710,000
0.25
1,058,998,000
Inferred
70,921,000
340,421,000
- An increase of 49% in the Measured & Indicated copper resources to 1.06 billion pounds; and- An increase of 17% in the Inferred copper resource, to 329 million pounds; also at a 0.10% copper cut-off.
The updated mineral resource estimate incorporates results from 42,418 feet (12,932 meters) of drilling following a significant land acquisition from Allied Nevada Gold Corp. in 2011. The study updates a previous mineral resource estimate in the 2010 NI 43-101 Technical Report Pre-feasibility Study Update for the Contact Copper Project, Elko County, Nevada, USA. The details of updated mineral resource estimate are provided in the accompanying tables.
"The substantial increase in copper resources at our Contact Copper Project validates the work we have done in property acquisition and drilling." commented Arnold Armstrong, President & CEO of Enexco. "We are very pleased with the updated resource figures and the progress we have made in advancing the project to a feasibility study. Our drill programs have produced steady and significant increases in the resources at Contact since 2007, and we still have exploration targets on the property to test by drilling."
Mineral Resource Estimate at selected cut-offs
Resource
Cut-off
Tonnage
Copper
Copper %
%
Pounds
0.10
0.125
45,376,000
0.31
281,331,000
0.15
36,281,000
0.35
253,967,000
0.20
25,162,000
0.43
216,393,000
0.30
13,977,000
0.58
162,133,000
118,604,000
0.29
687,903,000
92,409,000
0.33
609,899,000
58,768,000
0.42
493,651,000
28,195,000
0.61
343,979,000
Total Measured & Indicated
1,058,999,000
163,980,000
969,234,000
128,690,000
0.34
863,866,000
83,930,000
710,044,000
42,172,000
0.60
506,112,000
53,680,000
0.28
300,608,000
45,842,000
284,220,000
30,506,000
0.37
225,744,000
13,296,000
0.55
146,256,000
Notes: Mineral Resources have been classified according to "CIM Standards on Mineral Resources and Reserves: Definitions and Guidelines" (December 2005). Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. There is no certainty that all or any part of Mineral Resources will be converted into Mineral Reserves. Mineral Resources cited are global totals. It cannot be assumed that all or any part of an Inferred Resource will be upgraded to an Indicated Resource, or that an Indicated Mineral Resource will be upgraded to a Measured Resource, as a result of continued exploration. Cut-offs used are not based on specific economic conditions and are for comparison only. Mineral resource tonnages and contained metal quantities have been rounded to reflect accuracy of the estimate and the numbers may not sum due to rounding.
The copper mineralization at the Contact Copper Project is comprised of multiple high grade veins within an envelope of lower grade mineralization within granodiorite. A single stage indicator approach was selected to model high grade zones. Copper grades were estimated from the drill hole data base, with assays capped at 10% Cu, using an inverse distance squared (ID-2) algorithm and dynamic anisotropy derived from geostatistical analysis. The resource was categorized into measured, indicated and inferred categories based on cumulative frequency distribution of estimation variance of the resulting block estimates. The mineral resources are global estimates and are unconstrained within the block model for the resources estimate.
The updated estimate uses results from 42,418 feet (12,932 meters) of drilling in 82 holes which commenced following the acquisition of 8,400 acres of adjoining mining claims in the district from Allied Nevada Gold Corp in 2011. The updated resource estimate is based on a database that now consists of 254,998 feet (77,743 meters) of drilling in 329 core and reverse circulation drill holes.
A NI 43-101-compliant Technical Report detailing the Updated Resource Estimate will be filed within 45 days of the date of this release. The report will be available at www.sedar.com. This report will supersede the PFS2010 and will not be updating the sections related to an advanced mineral exploration project. Enexco is currently working towards a feasibility study for the Contact Copper Project.
William Willoughby, PhD., P.E. is the Qualified Person with Enexco responsible for the content of this news release. The Qualified Persons for the updated mineral resource estimate for the Contact Copper Project are Terre Lane, Principal Mining Engineer and QP, MMSA-QP and Zachary J. Black, E.I.T., Resource Geologist and QP SME-RM No. 4156858RM of 3L Resources, Ltd., Denver, Colorado.
About the Contact Copper Project The Contact Copper Project is a copper oxide project located in Elko County, Nevada, that is planned to use low cost SX-EW recovery to produce copper cathode on site. Additional information is available on Enexco's website at http://www.enexco.ca/s/contact_copper.asp and in the October, 2010 NI 43-101 Technical Report Pre-feasibility Study Update for the Contact Copper Project, Elko County, Nevada as posted on Sedar.
Qualified PersonWilliam Willoughby, Ph.D., P.E. is the Company's Qualified Person for the purposes of NI 43-101 and approved this news release. Eugenio Iasillo, P.E., Principal of Process Engineering, LLC, is a Qualified Person for the purposes of NI 43-101, and supervised and reviewed the information contained in this news release.About International Enexco Ltd.International Enexco Ltd is a North American exploration and development company focused on the feasibility stage Contact Copper Project in northern Nevada. The Company also pursues gold and silver exploration in Idaho and Nevada, and is advancing the Mann Lake Uranium Project located in Saskatchewan's prolific Athabasca basin. This project is a joint venture with Cameco as operator and Areva---two of the world's largest uranium companies.
On behalf of the Board of Directors, I look forward to keeping you updated with our corporate developments.
"G. Arnold Armstrong"President & CEO
LATEST NEWS
RECENT ARTICLESS
Resource World
The Northern Miner
Vantage Wire
Minesite
International Enexco is a copper and uranium development stage company based in Canada.
International Enexco holds various exploration projects in Canada.
Its main exploration properties are LOOMIS, HOT POT PROJECT, MANN LAKE, CONTACT COPPER and MANN LAKE (JV) in Canada.