Linear Metals Corporation

Published : September 24th, 2008

Deep Holes at Linear Metals KM61 Project Show Molybdenum Mineralization Continues to Depth

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Canada | Copper | Molybdenum | Silver |
September 24th, 2008 � Toronto, Ontario � Linear Metals Corporation (TSX: LRM) is pleased to announce drill core assays from three deep holes drilled below the centre of the Main Zone, and assays from one short hole on the high-grade (=0.1% molybdenum) �73 Zone� at its 100% owned KM61 Project located in Ontario, Canada. The deep holes, K-08-98 to K-08-100, confirm the vertical continuity of the zone to at least 400 metres and significantly open up the depth extent of the zone, from 300 to 400 metres vertical, which is expected to positively impact the eventual tonnage of the deposit. The shallow hole, K-08-103, confirms the lateral continuity of the high-grade �73 Zone�, which has been traced over a strike length of at least 200 metres, and now over true widths of up to 50 metres.
 
Highlights from the most recent drill results in the Main Zone include:
         K-08-98:         59.4 metres*1 of 0.061% molybdenum, 0.22% copper and 5.0 grams per tonne silver starting at 332.1 metres;
         K-08-99:         329.13 metres*1 of 0.067% molybdenum, 0.08% copper and 2.4 grams per tonne silver starting at 182.0 metres;
         K-08-100:       90..2 metres*1 of 0.072% molybdenum, 0.06% copper and 1.7 grams per tonne silver starting at 273.2 metres; and,
         K-08-103:       60.48 metres of 0.108% molybdenum, 0.09% copper and 2.7 grams per tonne silver starting at surface.
Notes: *1: reported as Cumulative Thickness or �CT�, see Note 3 in table below for explanation.
Based on the encouraging results from the deep drilling, the original Phase II, 25,000 metre delineation drill program, was increased to 31,000 metres. The additional drilling included approximately 2,500 metres to fill in several drill gaps in preparation for the resource calculation later this fall and the drill program was completed on September 20th
 
Composite assay results for the intervals of greater than 0.04% molybdenum in holes K-08-98 to K-08-100 and K-08-103 are detailed in the table below. Please refer to Linear Metals� website at www.linearmetals.com for prior drill results and a drill hole location map.
 
Table 1. Drill Hole Composite Results
 

DDH#
From
To
Metres1
Molybdenum %
Copper
%
Silver grams/tonne
Comments
K-08-98
56.00
74.50
18.50
0.057
0.11
1.5
uncut Mo = 0.098%
 
216.50
234.50
18.00
0.060
0.19
4.4
 
 
332.08
367.28
35.20
0.059
0.27
6.0
 
 
374.08
398.25
24.17
0.065
0.14
3.5
 
incl
385.00
391.00
6.00
0.187
0.14
4.8
 
 
434.10
482.09
47.99
0.044
0.09
3.2
 
 
483.39
487.00
3.61
0.044
0.06
1.3
 
 
491.86
526.36
34.50
0.040
0.16
4.7
 
CT
332.10
398.25
59.40
0.061
0.22
5.0
 
 
 
 
 
 
 
 
 
K-08-99
182.00
225.50
43.50
0.083
0.10
2.9
uncut Mo = 0.165%
incl
213.50
225.50
12.00
0.122
0.09
2.5
 
 
236.00
265.00
29.00
0.090
0.06
2.0
 
incl
246.50
258.55
12.05
0.162
0.06
2.1
 
 
272.00
322.50
50.50
0.103
0.09
2.6
uncut Mo = 0.115%
incl
273.94
295.00
21.06
0.140
0.10
2.8
uncut Mo = 0.171%
 
355.00
379.00
24.00
0.084
0.15
4.3
 
 
386.60
411.00
24.40
0.055
0.04
1.2
 
 
438.00
595.73
157.73
0.049
0.08
2.1
uncut Mo = 0.05%
incl
494.00
508.50
14.50
0.103
0.12
3.7
uncut Mo = 0.106%
CT
182.00
595.73
329.13
0.067
0.08
2.4
 
incl CT
182.00
379.00
171.40
0.083
0.09
2.6
 
 
 
 
 
 
 
 
 
K-08-100
273.16
323.00
49.84
0.084
0.07
2.1
 
incl
276.50
299.00
22.50
0.130
0.05
1.4
 
 
339.08
379.42
40.34
0.056
0.05
1.2
 
 
435.20
445.10
9.90
0.052
0.16
3.3
 
 
487.00
494.00
7.00
0.044
0.06
0.9
 
CT
273.16
379.42
90.20
0.072
0.06
1.7
 
 
 
 
 
 
 
 
 
K-08-103
4.00
64.48
60.48
0.108
0.09
2.7
uncut Mo = 0.110%
incl
4.00
23.50
19.50
0.146
0.07
2.3
 
incl
40.50
57.50
17.00
0.155
0.10
2.9
uncut Mo = 0.164%

 
Note 1:  Intersections in the table above are based on core length, but with holes drilled at -45 degrees across the dip of the mineralized zone, the intersection widths are thought to be approximately 80% of true widths. Average sample length is 1.5 metres. All molybdenum values >0.5% reported in composites are cut to 0.5% molybdenum. Uncut values are noted for reference purposes only.
Note 2:  Where two or more composites are shown for a hole, gaps in the composite values are occupied by lower grade mineralization of 0.01 to 0.04%, or more often by post-mineral dykes.  Post-mineral dykes or low grade zones of less than 5.0 metres width are included in the composite calculations. Post-mineral dykes or low grade zones of greater than 5.0 metres width are deemed the end of a mineralized interval.
Note 3: �CT� = cumulative total, the weighted average of all composites with the width of post-mineralization, waste-rock dykes or low grade zones greater than five metres in width removed.
 
Main Zone � Deep Holes
 
All three of the deep holes intersected excellent mineralization at depth below the Main Zone. The new deep holes will add significant tonnage to the calculated resource, and have implications for the eventual depth of a planned open pit.
 
K-08-98 intersected 0.061% molybdenum, 0.22% copper, and 5 grams per tonne silver, over a CT thickness of 59.4 metres, from 332.1 metres, as well as lower grade zones of 0.044% and 0.040% molybdenum from 434 to 526 metres. In the upper part of the hole, a high grade molybdenum vein (1.01% molybdenum over 1.5 metres) was intersected within a wider 18.5 metre section of 0.057% molybdenum, starting at 56 metres, which may herald the start of an additional higher grade zone, within the overall lower grade envelope, along the north flank of the Main Zone, as based on visual observation, a similar high grade vein (assays pending) was intersected in the upper part of K-08-104, 75 metres to the east.
 
K-08-99 had an overall intersection (diluted) from 182 to 592 metres, of 410 metres at 0.052% molybdenum (0.081% uncut), 0.063% copper, and 1.8 grams per tonne silver. Within this 410 metre interval are several higher grade zones, summarized by a CT thickness of 329.13 metresat 0.067% molybdenum, 0.08% copper and 2.4 grams per tonne silver, beginning at 182.0 metres, including a CT thickness of 171.4 metres at 0.083% molybdenum, 0.09% copper and 2.6 grams per tonne silver also beginning at 182.0 metres. 
 
K-08-100 returned an excellent CT thickness of 90.2 metres at 0.072% molybdenum, 0.06% copper, and 1.8 grams per tonne silver, starting at 273 metres. The +0.04% molybdenum zone seen in the bottoms of K-08-98 and -99 is present in the bottom of K-08-100, but not as well developed, only exceeding the nominal 0.04% molybdenum cutoff over short sections.
 
�73 Zone�
 
Hole K-08-103 was drilled as a 50 metre spaced in-fill between holes K-08-73 and K-08-76, to confirm continuity of the �73 Zone�. K-08-73 had previously intersected 13.5 metres of 0.110% molybdenum, while K-08-76 had previously intersected 10.5 metres of 0.124% molybdenum, followed by 9.0 metres of 0.135% molybdenum. K-08-103 intersected a significantly wider interval of high grade mineralization with 60.5 metres of 0.108% molybdenum, 0.09% copper and 2.7 grams per tonne silver. The zone has now been traced over a minimum strike length of 200 metres, intersected to the east by previously released hole K-08-101, which intersected 5.8 metres of 0.113% molybdenum.
 
�With the completion of the Phase II drilling, Linear is now focused on completing a 43-101 compliant resource estimate before year end and following up on additional priority targets to the northeast of KM61�s Main Zone.�, reports Robert Page, Linear�s V.P. of Exploration. �This resource estimate should be enhanced by the presence of better than average grade mineralization in the near surface such as that seen in holes K-08-103, as well as additional tonnage provided by the significant intersections at depth.�
 
Expanded Soil Survey Encounters New Molybdenum Anomalies
 
Linear is also pleased to report that soil sampling has produced several new and potentially significant molybdenum anomalies to the northeast of the Main Zone. These samples were collected on a GPS-based 100 x 100 metre �grid� over the eastern end of a long arcuate airborne radiometric trend that hosts the Main Zone.  This eastern end of the trend, has now produced three large, strong molybdenum-copper-silver anomalies (T1 to T3). These anomalies are located roughly on strike with the Main Zone and are 500 to 1500 metres east from the easternmost drill hole.  The strength of the molybdenum anomalies is equal to, or up to 50% greater than, those which outline the Main Zone mineralization.   Anomaly T1 measures approximately 200 x 300 metres, and is located approximately 600 metres from the nearest drill hole, while anomaly T2 is located approximately 1000 metres from the nearest drill hole and measures approximately 400 x 500 metres.  Anomaly T3 is located approximately 1500 metres from the nearest drill hole, is approximately 300 x 300 metres, and is strengthening and open to the northeast.  All three areas are to be followed up with trenching and additional sampling this fall.
 
The technical information in this press release was prepared under the supervision of Matt Rees, P.Geo., Chief Geologist, a qualified person as defined by National Instrument 43-101.  Assaying of samples during the 2007-2008 Phase I and Phase II programs is being performed by ALS Chemex in Vancouver, British Columbia. Linear has a detailed QA/QC program in place involving the regular submittal of blanks, duplicates and external reference standards with the core samples.
 
Completion of a 43-101 compliant resource estimate on Linears� KM61 project will complement the initial 43-101 compliant resource estimate on its Cobre Grande project completed in April 2008 and outlining 49.8 million tonnes at an average grade of 0.92% copper-equivalent. For further details on Linear Metals Corporation and its projects please visit the Company's website at www.linearmetals.com or contact investor relations at (902) 482-1240, or within North America at 1-866-376-7683. 
 
Signed �Brian MacEachen�
Brian MacEachen, President & CEO
 
The TSX has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.
 
Forward-Looking Information:
This release includes certain statements that may be deemed "forward-looking statements". All statements in this release, other than statements of historical facts, that address future production, reserve potential, continuity of mineralization, exploration drilling, exploitation activities and events or developments that the Company expects are forward-looking statements. Although the Company believes that the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. The likelihood of future mining at KM61 is subject to a large number of risks and will require achievement of a number of technical, economic and legal objectives, including obtaining necessary mining and construction permits, completion of pre-feasibility and final feasibility studies, preparation of all necessary engineering for pits and processing facilities as well as receipt of significant additional financing to fund these objectives as well as funding mine construction. Such funding may not be available to the Company on acceptable terms or on any terms at all. There is no known ore at KM61 and there is no assurance that the mineralization at KM61 will ever be classified as ore. For more information on the Company and the risk factors inherent in its business, investors should review the Company's Annual Information Form at www.sedar.com.
.
Data and Statistics for these countries : Canada | All
Gold and Silver Prices for these countries : Canada | All

Linear Metals Corporation

EXPLORATION STAGE
CODE : LRM.TO
ISIN : CA8613081048
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Linear Metals is a silver and gold exploration company based in Canada.

Linear Metals holds various exploration projects in Canada and in Mexico.

Its main exploration properties are LA MORENA and COBRE GRANDE in Mexico and SEYMOUR LAKE and KM61 in Canada.

Linear Metals is listed in Canada and in United States of America. Its market capitalisation is CA$ 3.2 millions as of today (US$ 3.1 millions, € 2.4 millions).

Its stock quote reached its highest recent level on January 18, 2008 at CA$ 1.14, and its lowest recent point on May 22, 2013 at CA$ 0.04.

Linear Metals has 80 331 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of Linear Metals Corporation
2/11/2011Announces $1,000,000 Private Placement
8/4/2009Announces Completion of Private Placement
7/22/2009Announces $900,000 Private Placement
Option Grants of Linear Metals Corporation
8/9/2011Retains Alliance Advisors as US Investor Relations Consultan...
Nominations of Linear Metals Corporation
3/26/2008Appoints Dr. James W. Gill as Director
12/11/2007Announces New Appointments
Project news of Linear Metals Corporation
5/10/2011Provides An Update On Its Nyanza Project Exploration Program...
3/31/2011(Seymour Lake)Agrees to Option Agreement on Seymour Lake Project
2/9/2011Signs Option Agreement To Acquire Large Gold And Base Metal ...
1/7/2010Additional High Grade Drill Results
10/7/2009(Seymour Lake)Provides An Update on the Seymouth Lake Lithium Project
9/10/2009(Seymour Lake)Reports Additional Beryllium And Tantalum Results Compiled F...
7/24/2009(Cobre Grande)Provides Update onCobre Grande Purchase Option
12/9/2008(Km61)Reports 43-101 Mineral Resources at KM61 Project
11/24/2008(Km61)Reports Positive Metallurgical Results and Significant Deep ...
9/24/2008(Km61)Deep Holes at Linear Metals KM61 Project Show Molybdenum Min...
9/3/2008(Km61)Encounters Strong Molybdenum Mineralization in Offsets to Hi...
8/20/2008(Cobre Grande)Extends Copper-Molybdenum Mineralization in El Oso Zone at C...
7/23/2008(Km61)Intersects Longest Molybdenum-Copper-Silver Intervals to Dat...
7/2/2008(Km61)Continues to Intersect Long Intervals of Molybdenum-Copper-S...
6/18/2008(Cobre Grande)Intersects High Grade Copper-Silver in Northwest Skarn at Co...
5/15/2008(Km61)Intersects High-Grade Molybdenum in the Main Zone at KM61 Pr...
5/13/2008(Cobre Grande)Announces New Discovery at Cobre Grande Copper-Molybdenum Si...
5/9/2008(Km61)Connects Mineralization Across the Main Zone and Makes a New...
3/5/2008(Km61)Reports Additional Molybdenum-Copper-Silver Mineralization a...
2/12/2008(Km61)Continues to Intersect Wide Intervals of Molybdenum-Copper-S...
2/1/2008(Cobre Grande)Extends Mineralization by 200 Metres and Intersects New Zinc...
10/4/2007Drilling Intersects Significant Mo-Cu-Ag Mineralization
Corporate news of Linear Metals Corporation
4/24/2012Announcement
1/9/2012Reports Gold Mineralization in Kamwango Core Samples-Assays ...
11/28/2011Kenyan Partners of Linear Metals and African Queen Mines Set...
8/22/2011Increases Nyanza Gold and Base Metal Property Portfolio by 6...
7/6/2011Commences Drilling on Its Nyanza Project in Kenya
9/3/2009Additional Results Announced From Linear
8/25/2009Reactivates Seymour Lake Lithium/Tantalum/Beryllium Project
2/9/2008To Begin Trading on the Toronto Stock Exchange And Commences...
1/11/2008Plans Aggressive 2008 Work Programs
12/18/2007ACQUISITION OF SHARES OF LINEAR METALS CORPORATION
11/9/2007Mineralization Extended Over One Kilometre at LinearMetals?C...
8/16/2007Sampling of Historic Core at Linear Metals' KM61 Project Inc...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (LRM.TO)OTHER OTC (LMTCF)
0.040+0.00%0.573+14.37%
TORONTO
CA$ 0.040
05/22 15:28 -
0%
Prev close Open
0.040 0.040
Low High
0.040 0.040
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.040 -%
Volume 1 month var.
130,000 -%
Produces
Develops
Explores for Beryllium - Copper - Gold - Lithium - Silver - Tantalum - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 6.83-1.30%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 10.18+5.60%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.63-0.63%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
 2.20+2.80%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
 14.50+4.39%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
 0.33+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
 0.19+5.56%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
 2.05+6.22%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 37.87-4.85%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :
Sun Res.(Oil)SUR.AX
Released ASX Announcement: Quarterly Activities Report
AU$ 0.00+0.00%Trend Power :
Take advantage of rising gold stocks
  • Subscribe to our weekly mining market briefing.
  • Receive our research reports on junior mining companies
    with the strongest potential
  • Free service, your email is safe
  • Limited offer, register now !
Go to website.