| | Published : April 27th, 2010 | Expands Resource Potential at Timmins Mine |
|
Article
|
Comments
|
Comment this article
|
Rating
|
♥
Follow Company
|
|
|
April 27, 2010 |
Lake Shore Gold Expands Resource Potential at Timmins Mine
- New high-grade mineralization identified within previously untested gap below current resource in Ultramafic Zone between 740 and 785 levels, including 7.55 gpt over 13.00 m and 8.84 gpt over 22.50 m.
- New mineralization identified in Footwall Zone near 650 Level outside current resource model (5.91 gpt over 10.25 m in 650-079, 5.08 gpt over 18.50 m in 650-049 and 6.08 gpt over 10.30 m in 650-095).
- Potential to expand high-grade core of Ultramafic Zone near 650 Level highlighted by holes 650-016 (9.77 gpt over 18.50 m), 650-051 (10.31 gpt over 19.70 m), 650-078 (12.13 gpt over 26.00 m) and 650-079 (7.52 gpt over 20.30 m).
- High-grade intercepts, including 23.26 gpt over 8.50 m, 12.13 gpt over 13.30 m and 6.55 gpt over 13.30 m, compare favourably to results of previous wider-spaced surface drilling. |
TORONTO, ONTARIO--(Marketwire - April 27, 2010) - Lake Shore Gold Corp. (TSX:LSG) ("Lake Shore Gold" or the "Company") today announced results from an additional 44 holes (7,627 metres "m") from drilling on the 650 and 525 levels of the Timmins Mine. The drilling represents the final 13 holes (3,673 m) of the 88 hole (14,424 m) 2009 program and 31 holes (3,954 m) from the ongoing 2010 campaign. Among significant intersections from the drilling are 23.26 gpt over 8.50 m in 650-066, 12.13 gpt over 13.30 m in 650-028, and 6.55 gpt over 13.30 m in 650-064 which compare favourably to intercepts from previous wider-spaced surface drilling used for resource calculations between the 650 and the 725 levels. In addition, 650-065 intersected 7.55 gpt over 13.00 m and 650-068 intersected 8.84 gpt over 22.50 m within a previously untested gap within the current resource model of the Ultramafic Zone between the 740 and the 785 levels.
Gold mineralization intersected in these holes is located in the down plunge extension of the Ultramafic Zone from the 650 Level and is closely associated with swarms of quartz veins occurring within a series of lenses located along a broad structural corridor dipping moderately northward. The new higher-grade intersections are related to swarms of veining located in the central portion of the system which has been traced from just below the 650 Level to at least the 780 Level. The swarms of quartz veining are found to have variable sizes, shapes and grades and are often closely related to increased carbonate alteration and increased sulphide content. The above factors, as well as the increase in the gold price from the US $500 per ounce used in the most recent National Instrument ("NI") 43-101 report (October 2009), indicate that opportunities exist to re-interpret portions of the existing resource into a combination of high grade and large bulk mining stoping blocks, potentially leading to increased total ounces and optimization of the current mine plan.
Within the uppermost trend of the corridor the following holes: 650-078 (12.13 gpt over 26.00 m), 650-051 (10.31 gpt over 19.70 m), 650-016 (9.77 gpt over 18.50 m) and 650-079 (7.52 gpt over 20.30 m), continued to confirm and expand the size of the high-grade core of the mineralization in the Ultramafic Zone near the 650 Level.
Holes 650-079 (5.91 gpt over 10.25 m), 650-095 (6.08 gpt over 10.30 m) and 650-049 (5.08 gpt over 18.50 m) also tested the Footwall Zone near the 650 Level. These are the first closer spaced holes to test the Footwall Zone in this area and now allow interpretation of a consistent zone of higher-grade mineralization located immediately north and trending parallel to the Ultramafic Zone. The intercepts reported from 650-079, 650-095 and 650-049 occur outside the current resource model, which indicates the potential to expand resources in this area of the Footwall Zone.
Tony Makuch, President and CEO of Lake Shore Gold, commented: "The results being announced today support the original resource estimates and also highlight the significant potential that exists to extend resource blocks, and discover new resources at the Timmins Mine. We are continuing to drill underground for both mine planning and resource expansion, and plan to extend a development ramp above the 650 Level and establish a series of sub-levels in anticipation of initial test stoping during the summer and commercial production later in the year. We have completed sinking the Timmins shaft to the 710 metre level and will complete the shaft changeover and commence skipping in early May. Underground development to Thunder Creek from Timmins Mine is also progressing on schedule and we remain on track to intersect Thunder Creek mineralization from the 200 Level in June and from the 650 Level by the end of September."
Going forward, the Company plans to develop hanging wall drifts on the 525, 650 and 715 levels at Timmins Mine in order to allow additional close-spaced drilling above and below the 650 Level for definition and expansion of current resources to support the first 3 years of the mine plan and to explore for new zones.
Quality Control
The Company's Qualified Person ("QP") for the underground drill program at the Timmins Mine property is Stephen Conquer, P.Geo. and for resource estimation at Timmins Mine is Bob Kusins, P.Geo. As QPs, they have prepared or supervised the preparation of the scientific or technical information for the property and have verified the data disclosed in this press release. Both QPs are employees of Lake Shore Gold.
Lake Shore Gold has implemented a quality-control program to ensure best practice in the sampling and analysis of the drill core. Samples are obtained from BQTK-sized Diamond drill core, with roughly 25% of sampled core being sawn in half and the remaining 75% being whole core sampled. All remaining core materials, including the remaining half of sawn core is retained on site in a secure location. Drill core samples are stored for sample preparation and gold analysis performed by ALS Chemex. ALS Chemex is an ISO 9001-200 registered laboratory, preparing for ISO 17025 certification. Drill core samples are transported in security-sealed bags to ALS Chemex's Timmins Sample Preparation Facility. Sample preparation is completed in Timmins, and the prepared sample pulps are then transported to ALS Chemex's analytical laboratory in Vancouver, BC. Gold grades are obtained on all samples via Fire Assay with Atomic Absorption finish, using 50g aliquots. For samples that return a gold content greater than 3 gpt, the sample is re-analyzed via Fire Assay with Gravimetric finish, again using a 50g aliquot.
Additional information regarding exploration and resources at Timmins Mine is set out in the technical report entitled, "Updated NI 43-101 Technical Report on the Timmins Mine Property, Ontario, Canada," dated October 1, 2009, filed on SEDAR on October 6, 2009 (www.sedar.com).
About Lake Shore Gold Corp.
Lake Shore Gold is a rapidly growing mining company with large land positions on the west and east sides of the Timmins Gold Camp. The Company is currently carrying out pre-production and development work at its 100%-owned Timmins Mine project, where it has both a shaft and a ramp, and is also performing advanced exploration work at the adjacent Thunder Creek property. The Bell Creek Mill, located on the east side of Timmins, has been refurbished to a capacity of 1,500 tonnes per day. The Company is also making progress with an underground advanced exploration program at its Bell Creek Complex, which is moving forward to become the Company's second mining operation in the Timmins Camp. The Company continues to invest aggressively in exploration primarily in Timmins and in select other areas of Northern Ontario and Quebec, and owns a large land position in Mexico. The Company's common shares trade on the TSX under the symbol LSG.
Forward-looking Statements
Certain statements in this press release relating to the Company's exploration activities, potential for increasing resources, project expenditures and business plans are "forward-looking statements" within the meaning of securities legislation. The Company does not intend, and does not assume any obligation, to update these forward-looking statements. These forward- looking statements represent management's best judgment based on current facts and assumptions that management considers reasonable, including that operating and capital plans will not be disrupted by issues such as mechanical failure, unavailability of parts, labour disturbances, interruption in transportation or utilities, or adverse weather conditions, that there are no material unanticipated variations in budgeted costs, that contractors will complete projects according to schedule, and that actual mineralization on properties will not be less than identified mineral reserves. The Company makes no representation that reasonable business people in possession of the same information would reach the same conclusions. Forward- looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. In particular, fluctuations in the price of gold or in currency markets could prevent the Company from achieving its targets. Readers should not place undue reliance on forward-looking statements. More information about risks and uncertainties affecting the Company and its business is available in Lake Shore Gold's most recent Annual Information Form and other regulatory filings which are posted on sedar at www.sedar.com.
There is no guarantee that drill results reported in this news release will lead to the identification of a deposit that can be mined economically, and further work is required to identify resources and reserves.
Table 1 - Timmins Mine - Significant new assay results from underground drilling.
----------------------------------------------------------------------------
Hole From To Assay Length Comments
----------------------------------------------------------------------------
Number (m) (m) (gpt) (m)
----------------------------------------------------------------------------
----------------------------------------------------------------------------
525-001 165.40 166.40 3.00 1.00
----------------------------------------------------------------------------
525-018 36.00 37.00 2.85 1.00 UM1
----------------------------------------------------------------------------
525-024 129.10 129.50 29.40 0.40
----------------------------------------------------------------------------
525-026 70.50 71.10 102.00 0.60
----------------------------------------------------------------------------
525-030 406.00 406.30 3.58 0.30
----------------------------------------------------------------------------
650-015 50.00 68.00 6.62 18.00 UM1
----------------------------------------------------------------------------
includes 50.00 56.90 10.20 6.90
----------------------------------------------------------------------------
includes 55.00 56.90 28.56 1.90
----------------------------------------------------------------------------
and 62.60 68.00 8.99 5.40
----------------------------------------------------------------------------
includes 65.00 66.00 16.55 1.00
----------------------------------------------------------------------------
88.00 94.00 3.32 6.00 Upper FW
----------------------------------------------------------------------------
650-016 47.10 65.60 9.77 18.50 UM1
----------------------------------------------------------------------------
includes 59.30 61.60 48.14 2.30
----------------------------------------------------------------------------
71.20 72.20 7.94 1.00
----------------------------------------------------------------------------
93.00 94.00 4.27 1.00
----------------------------------------------------------------------------
650-028 100.50 102.10 12.43 1.60
----------------------------------------------------------------------------
110.00 123.30 12.13 13.30 UM1
----------------------------------------------------------------------------
includes 111.00 113.00 51.90 2.00
----------------------------------------------------------------------------
131.30 133.70 4.95 2.40
----------------------------------------------------------------------------
143.70 144.70 13.55 1.00
----------------------------------------------------------------------------
650-032 44.00 60.70 8.72 16.70 UM1
----------------------------------------------------------------------------
includes 57.00 59.50 34.63 2.50
----------------------------------------------------------------------------
63.5 66.00 5.92 2.50
----------------------------------------------------------------------------
72.00 73.00 6.93 1.00
----------------------------------------------------------------------------
78.00 79.00 8.79 1.00
----------------------------------------------------------------------------
106.00 107.00 5.73 1.00
----------------------------------------------------------------------------
130.00 131.50 8.33 1.50 FW
----------------------------------------------------------------------------
650-049 70.10 74.00 4.24 3.90 UM1
----------------------------------------------------------------------------
103.40 121.90 5.08 18.50 Upper FW
----------------------------------------------------------------------------
includes 117.60 118.80 16.35 1.20
----------------------------------------------------------------------------
650-051 50.40 70.10 10.31 19.70 UM1
----------------------------------------------------------------------------
includes 65.80 68.60 34.70 2.80
----------------------------------------------------------------------------
93.70 96.00 4.48 2.30
----------------------------------------------------------------------------
102.00 107.30 4.94 5.30
----------------------------------------------------------------------------
650-055 53.30 71.20 4.26 17.90 UM1
----------------------------------------------------------------------------
includes 53.30 63.40 6.41 10.10
----------------------------------------------------------------------------
83.00 99.80 5.26 16.80 UM2 - Upper FW
----------------------------------------------------------------------------
includes 97.00 99.80 15.46 2.80
----------------------------------------------------------------------------
650-056A 50.60 62.70 4.76 12.10 UM1
----------------------------------------------------------------------------
68.30 69.10 5.32 0.80
----------------------------------------------------------------------------
80.80 81.90 5.16 1.10
----------------------------------------------------------------------------
650-057 30.50 38.90 4.74 8.40 Upper FW
----------------------------------------------------------------------------
59.20 61.30 4.06 2.10 FW2
----------------------------------------------------------------------------
67.60 68.10 11.90 0.50
----------------------------------------------------------------------------
71.10 71.70 16.50 0.60
----------------------------------------------------------------------------
74.30 75.40 4.62 1.10
----------------------------------------------------------------------------
650-058 31.30 31.80 3.06 0.50
----------------------------------------------------------------------------
51.00 51.70 3.93 0.70 Upper FW
----------------------------------------------------------------------------
650-059 2.80 4.20 13.90 1.40 UM1
----------------------------------------------------------------------------
20.60 21.60 10.27 1.00 Upper FW
----------------------------------------------------------------------------
650-060 3.40 5.70 7.43 2.30 UM1
----------------------------------------------------------------------------
650-061 9.00 10.00 13.60 1.00
----------------------------------------------------------------------------
17.90 20.80 10.38 2.90 Upper FW
----------------------------------------------------------------------------
27.00 31.50 5.91 4.50 Upper FW
----------------------------------------------------------------------------
41.30 48.20 4.22 6.90
----------------------------------------------------------------------------
57.50 59.50 4.02 2.00
----------------------------------------------------------------------------
650-062 17.10 20.60 3.63 3.50 UM 1
----------------------------------------------------------------------------
650-063 28.00 29.00 9.42 1.00 Upper FW
----------------------------------------------------------------------------
53.00 54.00 25.20 1.00 UM1
----------------------------------------------------------------------------
650-064 6.70 7.30 10.90 0.60 Upper FW
----------------------------------------------------------------------------
19.50 20.00 4.58 0.50
----------------------------------------------------------------------------
67.00 69.15 17.00 2.15 UM1
----------------------------------------------------------------------------
includes 67.00 68.00 34.40 1.00
----------------------------------------------------------------------------
90.30 103.60 6.55 13.30 UM
----------------------------------------------------------------------------
includes 90.30 92.30 8.47 2.00
----------------------------------------------------------------------------
and 97.00 97.70 75.70 0.70
----------------------------------------------------------------------------
650-065 13.60 18.00 5.74 4.40 FW
----------------------------------------------------------------------------
49.50 50.10 8.54 0.60
----------------------------------------------------------------------------
78.00 79.50 6.19 1.50
----------------------------------------------------------------------------
118.50 131.50 7.55 13.00 UM
----------------------------------------------------------------------------
includes 127.50 131.50 22.65 4.00
----------------------------------------------------------------------------
includes 128.50 130.00 44.73 1.50
----------------------------------------------------------------------------
650-066 8.50 9.00 26.90 0.50 FW
----------------------------------------------------------------------------
63.00 64.50 5.31 1.50 UM1
----------------------------------------------------------------------------
97.50 106.00 23.26 8.50 UM
----------------------------------------------------------------------------
incl 99.80 105.00 36.56 5.20
----------------------------------------------------------------------------
650-067 11.50 19.50 3.89 8.00 FW
----------------------------------------------------------------------------
82.50 83.20 9.75 0.70
----------------------------------------------------------------------------
101.00 102.00 4.20 1.00
----------------------------------------------------------------------------
105.00 107.80 4.62 2.80
----------------------------------------------------------------------------
115.60 117.00 4.75 1.40
----------------------------------------------------------------------------
118.50 119.00 7.43 0.50
----------------------------------------------------------------------------
650-068 12.50 16.50 3.69 4.00 FW
----------------------------------------------------------------------------
61.50 63.50 4.91 2.00
----------------------------------------------------------------------------
105.00 127.50 8.84 22.50 UM
----------------------------------------------------------------------------
includes 105.00 108.30 34.81 3.30
----------------------------------------------------------------------------
and 120.70 123.50 16.56 2.80
----------------------------------------------------------------------------
and 126.60 127.50 13.40 0.90
----------------------------------------------------------------------------
650-069 16.00 16.50 8.47 0.50 FW
----------------------------------------------------------------------------
18.50 19.50 5.03 1.00
----------------------------------------------------------------------------
59.40 65.50 1.74 6.10
----------------------------------------------------------------------------
62.80 64.00 5.58 1.20
----------------------------------------------------------------------------
84.30 87.50 6.03 3.20 UM
----------------------------------------------------------------------------
100.50 100.80 28.60 0.30
----------------------------------------------------------------------------
650-070 7.90 18.10 5.13 10.20 FW
----------------------------------------------------------------------------
57.70 69.50 4.86 11.80 UM1
----------------------------------------------------------------------------
includes 63.20 65.80 11.28 2.60
----------------------------------------------------------------------------
650-072 4.00 8.20 5.32 4.20 UM2
----------------------------------------------------------------------------
650-073 14.00 18.50 18.09 4.50 Upper FW
----------------------------------------------------------------------------
44.50 46.30 3.50 1.80
----------------------------------------------------------------------------
55.20 56.20 20.80 1.00 UM1
----------------------------------------------------------------------------
650-074 13.00 15.90 39.77 2.90 Upper FW
----------------------------------------------------------------------------
52.50 52.90 10.20 0.40 UM1
----------------------------------------------------------------------------
650-075 11.85 13.35 4.23 1.50 Upper FW
----------------------------------------------------------------------------
15.65 15.90 9.99 0.25
----------------------------------------------------------------------------
59.10 61.20 4.45 2.10 UM1
----------------------------------------------------------------------------
includes 60.90 61.20 16.25 0.30
----------------------------------------------------------------------------
650-078 45.00 71.00 12.13 26.00 UM1
----------------------------------------------------------------------------
includes 48.50 51.00 50.20 2.50
----------------------------------------------------------------------------
and 61.50 63.50 34.19 2.00
----------------------------------------------------------------------------
76.00 77.00 3.13 1.00
----------------------------------------------------------------------------
86.50 89.00 11.24 2.50
----------------------------------------------------------------------------
117.00 119.00 9.80 2.00
----------------------------------------------------------------------------
650-079 52.90 53.90 4.39 1.00
----------------------------------------------------------------------------
61.40 81.70 7.52 20.30 UM1
----------------------------------------------------------------------------
includes 61.40 67.20 8.14 5.80
----------------------------------------------------------------------------
and 75.50 81.70 15.72 6.20
----------------------------------------------------------------------------
94.85 105.10 5.91 10.25 Upper FW
----------------------------------------------------------------------------
119.10 123.40 17.27 4.30 FW
----------------------------------------------------------------------------
127.45 128.00 17.35 0.55
----------------------------------------------------------------------------
650-080 57.60 58.20 32.90 0.60 Upper FW
----------------------------------------------------------------------------
102.8 103.1 3.68 0.30 FW
----------------------------------------------------------------------------
650-081 152.50 152.80 18.90 0.30 FW2
----------------------------------------------------------------------------
650-083 45.80 65.40 4.11 19.60 UM1
----------------------------------------------------------------------------
includes 45.80 50.00 9.18 4.20
----------------------------------------------------------------------------
and 62.50 65.40 11.96 2.90
----------------------------------------------------------------------------
93.20 95.20 12.76 2.00 Upper FW
----------------------------------------------------------------------------
154.50 154.80 27.60 0.30 FW2
----------------------------------------------------------------------------
650-095 83.90 94.20 6.08 10.30 Upper FW
----------------------------------------------------------------------------
includes 85.00 86.80 19.68 1.80
----------------------------------------------------------------------------
111.60 114.20 10.63 2.60 FW
----------------------------------------------------------------------------
124.80 130.80 3.89 6.00 Lower FW
----------------------------------------------------------------------------
Notes:
1. Holes 525-014, 525-029, 525-031, 525-032, 525-033, 650-009, 650-056 and
650-082 returned weak or no significant values.
2. Results from 525-024 above 106.9 metres were previously reported.
3. Composites for holes 650-015 (50.00-68.00m), 650-032 (44.00-60.70m) and
650-055 (53.30-71.20m) include unsampled intervals. These unsampled
intervals were assigned a value of 0.00 gpt Au to calculate composites.
4. Assays are reported uncut.
5. True widths are not reported at this time.
To view Figure 1 (Plan View), please visit the following link: http://media3.marketwire.com/docs/lsg427fig1.pdf
To view Figure 2 (Long Section), please visit the following link: http://media3.marketwire.com/docs/lsg427fig2.pdf | |
CONTACT INFORMATION:
Lake Shore Gold Tony Makuch President & CEO (416) 703-6298
or
Lake Shore Gold Mark Utting Vice-President, Investor Relations (416) 703-6298 info@lsgold.com
|
INDUSTRY: Manufacturing and Production - Mining and Metals | |
|
| | If you no longer want to receive announcements from us, please do not reply to this e-mail. Instead simply click .
|
VanEck Vectors Global Alternative Energy ETF
|
|
PRODUCER |
CODE : LSG.TO |
ISIN : CA5107281084 |
|
| |
ProfileMarket IndicatorsVALUE : Projects & res.Press releasesAnnual reportRISK : Asset profileContact Cpy |
Lake Shore Gold is a gold producing company based in Canada. Lake Shore Gold holds various exploration projects in Canada. Its main asset in production is TIMMINS MINE in Canada and its main exploration properties are BELL CREEK, BLAKELOOK, THORNE, THUNDER CREEK, WEST TIMMINS and BAND ORE in Canada and LA BUFA, UNIVERSO, MONTAÑA DE ORO and LLUVIA DE ORO in Mexico. Lake Shore Gold is listed in Canada, in Germany and in United States of America. Its market capitalisation is 98.0 millions as of today (US$ 75.2 millions, € 66.2 millions). Its stock quote reached its lowest recent point on February 01, 2002 at 0.02, and its highest recent level on March 11, 2011 at 4.42. Lake Shore Gold has 47 442 200 shares outstanding. |
Financings of VanEck Vectors Global Alternative Energy ETF |
Nominations of VanEck Vectors Global Alternative Energy ETF |
Financials of VanEck Vectors Global Alternative Energy ETF |
Project news of VanEck Vectors Global Alternative Energy ETF |
|
Corporate news of VanEck Vectors Global Alternative Energy ETF |
7/28/2016 | Lake Shore Bancorp posts 2Q profit |
4/27/2016 | Lake Shore Bancorp posts 1Q profit |
4/1/2016 | Tahoe Resources Inc. and Lake Shore Gold Corp. Complete Busi... |
3/31/2016 | Lake Shore Gold Announces Shareholder Approval of Plan of Ar... |
3/31/2016 | Lake Shore Gold Announces Filing of Annual Information Form ... |
2/24/2016 | Lake Shore Gold reports 4Q loss |
1/19/2016 | Lake Shore Gold Reports Strong 2015 Operating Cost Performan... |
1/8/2016 | Lake Shore Gold Reports Full Year and Fourth Quarter 2015 Pr... |
1/7/2016 | Lake Shore Gold (LSG) Jumps: Stock surges 10.1% |
12/14/2015 | Is Oriental Financial Group Inc. (OFG) A Good Stock To Buy? |
11/27/2015 | Lake Shore Gold Corp Ordinary Shares (Canada) (LSG): Are Hed... |
10/29/2015 | Lake Shore Gold posts 3Q loss |
10/16/2015 | Lake Shore Gold Announces Details of Nine Month and Third Qu... |
10/14/2015 | Lake Shore Gold Produces 136,200 Ounces in First Nine Months... |
9/18/2015 | Lake Shore Gold Completes Acquisition of Temex Resources Cor... |
9/16/2015 | Lake Shore Gold Reports High-Grade Intersections From Initia... |
9/14/2015 | Temex Shareholders Overwhelmingly Approve Arrangement Agreem... |
8/14/2015 | Lake Shore Gold Acquires Additional Equity Interest in IDM M... |
8/4/2015 | Lake Shore Gold Acquires Significant Equity Interest in IDM ... |
7/31/2015 | Lake Shore Gold Enters Into Arrangement Agreement With Temex... |
7/30/2015 | Lake Shore Gold posts 2Q profit |
7/30/2015 | Lake Shore Gold Reports First Half and Second Quarter 2015 F... |
7/28/2015 | Lake Shore Bancorp posts 2Q profit |
7/17/2015 | Lake Shore Gold Announces Details of First Half and Second Q... |
7/16/2015 | Lake Shore Gold Proposes to Acquire Temex Resources Corporat... |
7/14/2015 | Lake Shore Gold Announces First Half and Second Quarter 2015... |
7/8/2015 | Lake Shore Gold Produces 95,600 Ounces in First Half of 2015... |
6/25/2015 | IIROC Trade Resumption - LSG |
4/27/2015 | Lake Shore Gold Continues to Intersect Significant Gold Mine... |
4/8/2015 | Lake Shore Gold Announces Details of Annual General Meeting ... |
3/26/2015 | Lake Shore Gold posts 4Q loss |
3/16/2015 | Lake Shore Gold Announces Details of Year-End and Fourth Qua... |
3/14/2015 | Lake Shore Gold Announces 29% Increase in Ore Reserves |
3/13/2015 | Lake Shore Gold Announces Details of Year-End and Fourth Qua... |
3/3/2015 | Lake Shore Gold Identifies Thick, High-Grade Core of Gold Mi... |
1/24/2014 | Lake Shore Gold's Preliminary 2013 Operating Cost Per Ounce ... |
1/7/2014 | Lake Shore Gold Achieves Record Production of 134,600 Ounces... |
12/16/2013 | Lake Shore Gold Extends Maturity of Standby Line of Credit a... |
10/24/2013 | Announces Details of Third Quarter 2013 Conference Call and ... |
10/9/2013 | Lake Shore Gold Reports Solid Third Quarter 2013 Operating R... |
8/13/2013 | Lake Shore Gold Reports Record Production and Lower Operatin... |
7/29/2013 | Announces Details of Second Quarter 2013 Conference Call and... |
7/5/2013 | Lake Shore Gold Reports Record Production in Second Quarter ... |
5/16/2013 | Lake Shore Gold Announces Results of Shareholders' Meeting |
5/10/2013 | Lake Shore Gold Announces Amendments to Shareholder Meeting ... |
5/9/2013 | Lake Shore Gold Completes Sale of Mexican Portfolio to Revol... |
5/7/2013 | Announces Details of First Quarter 2013 Conference Call and ... |
4/22/2013 | Lake Shore Gold to Hold Annual Meeting in Toronto on May 15,... |
4/8/2013 | Lake Shore Gold Reports First Quarter 2013 Production of 23,... |
3/28/2013 | (Bell Creek)Lake Shore Gold Files Bell Creek Mine Reserve Technical Repo... |
3/12/2013 | Announces Details of Full Year and Fourth Quarter 2012 Confe... |
2/25/2013 | Lake Shore Gold to Reduce Carrying Value of Assets |
2/6/2013 | Lake Shore Gold Announces Management Change |
2/1/2013 | Lake Shore Gold to Draw $35 Million Standby Line of Credit |
1/28/2013 | Lake Shore Gold Announces Launch of Investor Webinar Series |
1/11/2013 | Lake Shore Gold Announces Adoption of Corporate Governance M... |
1/10/2013 | Achieves 2012 Production Target, Company Poised for Sharply ... |
12/11/2012 | on Track for Strong Finish to 2012, Processing Capacity Incr... |
11/8/2012 | Lake Shore Gold Reports Third Quarter 2012 Results, Company ... |
10/25/2012 | Announces Details of Third Quarter 2012 Conference Call and ... |
10/10/2012 | Lake Shore Gold Reports Third Quarter 2012 Production of 20,... |
9/18/2012 | Announces Exercise of Underwriters' Over-Allotment Option fo... |
9/11/2012 | Lake Shore Gold Announces Management Change |
9/7/2012 | Completes C$90 Million Convertible Senior Unsecured Debentur... |
8/16/2012 | Announces C$75 Million Convertible Senior Unsecured Debentur... |
8/10/2012 | GoldPennyStars.com Profiles Alerted Penny Gold and Metals St... |
7/13/2012 | Announces Details of Second Quarter 2012 Conference Call and... |
7/4/2012 | Reports Strong Second Quarter Production of 24,426 Ounces of... |
6/13/2012 | Lake Shore Gold Forecasts 2012 Cost Savings While Remaining ... |
5/25/2012 | Lake Shore Gold Reports Smoke from Forest Fire Results in Pr... |
5/18/2012 | Files Timmins West Mine Reserve Technical Report |
5/10/2012 | Exceeds Targets and Achieves Continued Operating Improvement... |
5/1/2012 | Lake Shore Gold Reports Significant New Drill Intercepts at ... |
5/1/2012 | Reports Significant New Drill Intercepts at Fenn-Gib Open-Pi... |
4/5/2012 | Lake Shore Gold announces filing of Gold River Trend Technic... |
4/5/2012 | Lake Shore Gold Announces First Quarter 2012 Operating Resul... |
4/2/2012 | Lake Shore Gold Announces Reserve Estimate for Timmins West ... |
3/30/2012 | (Bell Creek)Lake Shore Gold Announces Large Increase in Measured and Ind... |
3/26/2012 | Lake Shore Gold Announces Fourth Quarter and Full-Year 2011 ... |
3/23/2012 | Announces Details of Fourth Quarter and Full-Year 2011 Confe... |
3/8/2012 | Lake Shore Gold and Franco-Nevada Complete $50 Million Royal... |
2/28/2012 | Lake Shore Gold Announces Results of Preliminary Economic As... |
2/28/2012 | Announces Results of Preliminary Economic Assessment for Tim... |
2/15/2012 | Lake Shore Gold Confirms Large-Scale Resource for Timmins We... |
2/8/2012 | and Franco-Nevada Enter Agreement for $50 Million Royalty an... |
1/17/2012 | (Thorne)Lake Shore Gold Announces New Extension at Thorne Property, ... |
1/4/2012 | Lake Shore Gold Announces Filing of Fenn-Gib Technical Repor... |
12/29/2011 | (Thunder Creek)Announces Filing of Thunder Creek Technical Report |
12/14/2011 | Signs Formal Agreement for Option on Company's Mexican Explo... |
11/28/2011 | Completes Sale of Land to Golden Share Mining for Significan... |
9/15/2011 | Enters Into Letter Agreement for Option on Company's Mexican... |
8/30/2011 | Reports Extensions of Gold Mineralization Along Strike and t... |
8/5/2011 | Announces Details of Second Quarter 2011 Conference Call and... |
7/29/2011 | U=2ES=2E Listing on NYSE A =?ISO-8859-1?Q?mex=20Approved,=20... |
7/26/2011 | Continues to Define and Ex =?ISO-8859-1?Q?tend=20Mineralizat... |
7/19/2011 | Releases Production Resultsfor Second Quarter and First Six-... |
6/16/2011 | Reports Wide, High-Grade Intercepts from Near-Surface Drilli... |
6/8/2011 | Announces Management Appointme =?ISO-8859-1?Q?nts,=20Creates... |
3/14/2011 | Lake Shore Gold Achieves Major Milestones in 2010, on Track ... |
2/1/2011 | Increases Interest in Northern Superior Resources Inc. |
7/22/2010 | Confirms & Expands Mineral |
5/27/2010 | Completes Sale of 50% Interest in Ti-pa-haa-kaa-ning JV |
5/12/2010 | Changes to Board of Directors |
5/5/2010 | Announces Continued Progress |
4/27/2010 | Expands Resource Potential at Timmins Mine |
3/11/2010 | 2009 Year End Results |
12/17/2009 | Completes Acquisition of "Bell Creek West" Properties |
12/15/2009 | Announces Management Changes |
12/15/2009 | Added to S&P/TSX Composite Index |
11/24/2009 | Announces Changes to Board of Directors |
11/6/2009 | and West Timmins Mining Complete Business Combination |
8/27/2009 | and West Timmins Agree to Business Combination |
8/6/2009 | Advances Projects on Schedule and Budget and Achieves Explor... |
6/24/2009 | Reports 12.75 Grams Per Tonne Over 83.40 Metres at Thunder C... |
5/16/2008 | Announces Approval of Special Resolutions at Annual and Spec... |
5/5/2008 | Comments on May 15, 2008 Shareholder Vote |
4/16/2008 | Announces Revised Agreement With Hochschild Mining; Second P... |
4/16/2008 | Announces Management Changes |
3/28/2008 | Announces 2007 Year End Results and Provides 2008 Outlook |
3/24/2008 | Announces Management Changes |
3/18/2008 | Announces Annual Meeting and Revised Date for Special Meetin... |
2/25/2008 | Completes Financing and Enters Into Strategic Alliance With... |
7/17/2007 | Commences Drilling at Blakelock and Expands its Property Pos... |
4/23/2007 | Completes Due Diligence on Bell Creek Acquisition |
|
|