Sundance Resources Ltd.

Published : April 16th, 2008

Exploration Update- Mbalam Iron Ore Project

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

 

 

Sundance Resources Limited (ASX: SDL)

ASX/MEDIA RELEASE                                                                                                                                           16 APRIL 2008

EXPLORATION UPDATE – MBALAM IRON ORE PROJECT

SUNDANCE CONFIRMS POTENTIAL OF MBARGA DEPOSIT TO HOST +1 BILLION TONNES OF DSO/ITABIRITE IRON ORE

 

 

International iron ore company Sundance Resources Limited (ASX: SDL – “Sundance”) is pleased to report that drilling has confirmed the potential of its 90%-owned Mbalam Iron Ore Project in Cameroon, West Africa to host an iron ore resource in excess of 1 billion tonnes.

 

Drilling at the Mbarga Deposit has defined two styles of hematite mineralisation – supergene Direct Shipping Ore (“DSO”) from surface underlain by massive itabirite hematite mineralisation to significant depth.

 

Latest geological modelling (non JORC-Code compliant) of the Mbarga Deposit has outlined the potential for 1.0 – 1.2 billion tonnes itabirite-style mineralisation at an average grade of approximately 39% Fe. This is based on all assay data received from the areas drilled to date including laboratory assays and data obtained using site hand-held XRF instrumentation. This site XRF data is progressively being verified by laboratory assay work.

 

The itabirite material comprises banded hematite-quartz with very low phosphorous (~0.03%) and alumina (~1.5%) contents. As previously reported, very preliminary testwork on a small number of selected samples of the Mbarga itabirite material has indicated that the itabirite may be beneficiated to produce a +65% Fe concentrate utilising conventional beneficiation plant similar to that used for upgrading of itabirite iron ores in Brazil. A bulk sample of drill core is currently being air freighted to Perth for more comprehensive beneficiation testing.

 

The geological modelling has also updated the potential Direct Shipping Ore (DSO) tonnage from the Mbarga Deposit. Latest estimates range from 100 to 140 million tonnes hematite at an average grade of approximately 60% Fe, 0.09% P and 3.4% Al2O3.

 

Drilling of both the DSO and itabirite ore horizons is continuing on the Mbarga Deposit utilising five of the six drill rigs operating on site. Surface and structural mapping gives reasonable confidence that definition of the itabirite tonnage will increase significantly with additional drilling. The Company will progressively step-out drilling over coming months to test the potential of other prospects on Exploration Permit 92 with these latest results resulting in the Company’s objectives for the Mbalam Iron Ore Project being reviewed with definition of an overall Exploration Target of 2.0-2.5 billion tonnes of itabirite-style mineralisation.

 

The latest geological modelling represents a significant step forward for the Company, confirming the potential for the Mbarga Deposit to support an integrated 35 Mtpa DSO/itabirite operation. This target is subject to completion of infill drilling to confirm a JORC-Code compliant resource and positive results from ongoing beneficiation testwork. At this stage, this remains a production target with any potential or assumed ore quantity and grade being conceptual in nature with insufficient results received from exploration completed to date to estimate a Mineral Resource compliant with the JORC Code (2004) guidelines. Furthermore, it is uncertain if exploration will result in the determination of a Mineral Resource sufficient to meet this assumed production target.

 

Sundance’s CEO Don Lewis said: “Our exploration efforts at Mbalam are starting to show significant results. We have outlined potential for a +1 billion tonne DSO/itabirite iron ore resource on the Mbarga Deposit within six months of the Company reporting its first drilling results.”

 

“The project could be similar in scale to some of the large iron ore projects in the Minas Gerais area of Brazil, which includes the Minas-Rio project being developed by MMX Mineraceo e Metallicos. That project has a target production capacity of 26.5 million tonnes hematite concentrate per annum, commencing in 2010, based on upgrading itabirite ore (~40% Fe) through conventional grinding and reverse flotation beneficiation plant.”

 

“We believe that the itabirite projects in Brazil represent a useful benchmark for development of the emerging potential of the Mbalam Project. Significant DSO mineralisation in addition to a potentially world scale itabirite resource provides significant development flexibility and would allow low cost production in the early years of operation. The nature of the Mbarga Deposit, with mineralisation from surface, should allow very efficient mining, with low stripping ratios for both DSO and itabirite ore,” Mr Lewis added.

 

Grant of New Exploration Permit in Cameroon

 

 

The Company is also pleased to announce that it has secured a significant new Exploration Permit located immediately adjacent to Exploration Permit No. 92 (“EP92”) in support of the Mbalam Iron Ore Project. This more than doubles the existing landholding held by Camiron SA, the Company’s 90% owned subsidiary, in Cameroon.

 

The new permit covers an area of approximately 1,000km2 in south-east Cameroon. The permit area lies immediately east of the defined mineralization on EP92 and contains a number of topographic features similar to those identified in the existing exploration permit. The Company’s geological team believes that the new permit area may be prospective for hematite mineralization similar to that defined in EP92.

 

The new permit represents a significant addition to Sundance’s exploration portfolio in Cameroon, consolidating its strategic position in this emerging iron ore province.

 

The Company will incorporate the new permit area into an expanded regional exploration program designed to deliver future drilling targets alongside its current focus of activity at Mbalam. The Company believes that this represents an opportunity to add significant value to the Company

 

 

ENDS

                       

Released by:

On behalf of:

Nicholas Read

Telephone: (+61-8) 9388-1474 / +61-419 929 046

Don Lewis, Managing Director /

Michael Weir, Investor Relations Manager

 (+61-8) 9220-2300 /+61-417 996 005

Read Corporate

Web: www.sundanceresources.com.au

 

 

Competent Persons Statement

 

The information in this release that relates to Exploration Results is based on information compiled by Mr Robin Longley who is a Member of the Australian Institute of Geoscientists.  Mr Longley is a full time consultant of the Company and has sufficient experience which is relevant to the style of mineralisation and type of deposit and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”.  Mr Longley consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

 

The potential quantity and grade of near-surface supergene mineralization and underlying itabirite-style mineralization has been restricted to the area currently covered by drilling on a 400m x 100m pattern at Mbarga. This is represented by an area approximately 3km (east-west) x 2.5km (north-south). Grade interpolation has been extrapolated using inverse distance squared method on composited sample results and a nominal 50% Fe cutoff value for DSO and 30% cutoff value for itabirite ore. A digital terrain surface (based on highly accurate topographic data), has been used to limit extrapolation of the mineralization to the topographic hill at Mbarga. An internal waste zone (schist) cross-cutting the itabirite and supergene zones and surficial cover has been modeled and removed from the quantity estimated as potential DSO and itabirite mineralization. Nominal densities of 4.0t/m3 and 3.35t/m3 have been applied for preliminary evaluation of the DSO and itabirite mineralization respectively.

 

 It must be noted that at this stage, the potential quantities and grades mentioned in this release are conceptual in nature and there has been insufficient results received from drilling completed to date to estimate a Mineral Resource compliant with the JORC Code (2004) guidelines. Furthermore, it is uncertain if further exploration will result in the determination of a Mineral Resource.

 

READ CORPORATE
Public Relations Corporate Communications
T: (+61-8) 9388-1474 | F: (+61-8) 9388-1472 | E: info@readcorporate.com.au | Web: www.readcorporate.com.au 

 

Sundance Resources Ltd.

CODE : SDL.AX
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Sundance Resources Limited is a exploration company based in Australia.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Nominations of Sundance Resources Ltd.
5/4/2010Appoints New Non-Executive Director
10/21/2009Appoints Deutsche Bank as Financial Advisor to Arrange Fundi...
7/3/2009Appointment of Geoff Wedlock as Chairman
7/15/2008Appointment of Company Secretary
4/21/2008 New Appointment to Sundance Board
Project news of Sundance Resources Ltd.
11/24/2009(Mbalam)Drilling Re-Commences At Mbalam Project
11/3/2009(Mbalam) Expands Mbalam Project Exploration Program
12/21/2008(Mbalam)Framework Agreement Signed with the Cameroon Government
12/9/2008(Mbalam)Completion of First Stage Exploration Program at Mbalam
9/3/2008(Mbalam)Increases DSO Inferred Resource at Mbalam to 223MT
5/19/2008(Mbalam) First Mineral Resource Statement for Mbalam Project
4/16/2008(Mbalam) Exploration Update- Mbalam Iron Ore Project
Corporate news of Sundance Resources Ltd.
7/25/2016Quarterly Activities Report
6/6/2016Update on Activities
5/23/2016Nabeba Convention passed into Law
1/31/2016Trading Halt
1/17/2016Update
1/4/2016Appendix 3B - Lapse of Performance Rights
12/30/2015Cleansing Notice
12/28/2015Suspension
12/24/2015Litigation update
12/23/2015Trading Halt
12/15/2015Extension and part Conversion of Convertible Note
12/1/2015Replacement convertible notes and options issued
11/30/2015AGM Voting
11/30/2015CEO presentation AGM
11/30/2015Chairman's Address to Shareholders
11/5/2015Waiver Granted
10/30/2015Notice of Annual General Meeting/Proxy Form
10/28/2015Quarterly Cashflow Report
10/28/2015Quarterly Activities Report
9/30/2015Full Year Statutory Accounts
9/30/2015Funding and Convertible Notes update
9/29/2015Trading Halt
9/4/2015ADU Presentation
8/28/2015Appeal Court decision
7/27/2015Quarterly Activities Report
7/7/2015Satisfaction of Conditions Precedent
4/7/2015UK High Court Litigation update
3/15/201531 December 2014 Half Year financial statements
3/5/2015S&P DJ Indices Announces March Quarterly Review
2/25/2015Quarterly Activities Report
2/25/2015Quarterly Cashflow Report
12/23/2014SDL 2014 Review and 2015 BRR Webcast
12/16/2014Cost Reduction Program and Board Changes
12/12/2014Hanlong Convertible Note Extension
12/9/2014Appendix 3B - Issue of Performance Rights
11/28/20142014 Annual General Meeting BRR Webcast
11/27/2014Incoming Chairman's Address to Shareholders
11/27/2014Chairman's Address to Shareholders
11/13/2014Minor Corrections to Notice of Annual General Meeting
11/10/2014ASX Grants Listing Rule Waiver
10/23/2014Quarterly Activities Report
10/23/2014Quarterly Cashflow Report
3/12/2014Half Yearly Report and Accounts
2/26/2014Appendix 3B
8/30/2013Sundance sees troubled Africa iron ore project online by 201...
6/13/2013Small to Mid Caps Webcast of CEO Presentation
4/29/2013Quarterly Cashflow Report
3/26/2013Sundance says Hanlong can't meet key deal deadline
2/4/2010Drilling Commences At Key Nabeba Deposit
11/9/2009Completes Placement Agreement To Raise A$85M From Internatio...
1/13/2009 Cam Iron Selected By Cameroon Government to Develop West Af...
7/28/2008June 2008 Quarterly Activities Report
5/28/2008Open Briefing - Maiden JORC Iron Ore Resource
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
AUSTRALIA (SDL.AX)
0.0000.00%
AUSTRALIA
Prev close Open
Low High
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  - -100.00%
Volume 1 month var.
-100.00%
Produces
Develops
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 9/24/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
20200.00%0.010.01
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 6.83-1.30%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 10.18+5.60%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.63-0.63%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
 2.20+2.80%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
 14.50+4.39%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
 0.33+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
 0.19+5.56%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
 2.05+6.22%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 37.87-4.85%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :
Sun Res.(Oil)SUR.AX
Released ASX Announcement: Quarterly Activities Report
AU$ 0.00+0.00%Trend Power :
Take advantage of rising gold stocks
  • Subscribe to our weekly mining market briefing.
  • Receive our research reports on junior mining companies
    with the strongest potential
  • Free service, your email is safe
  • Limited offer, register now !
Go to website.