IN-FILL DRILLING RESULTS JUMP-UP DAM PROJECT
Heron Resources Ltd is pleased to announce positive reverse circulation (RC) drilling results from current in-fill drilling at its wholly owned Jump-up Dam nickel laterite project.
The current results for the latest drilling in the north-west corner of the project demonstrates the good continuity of the higher grade mineralisation between and along the drill sections. JDRC2224 has returned the highest grade drilling result
returned to date from the project of 6.12% Ni over a 2m interval from 24m depth. This is significant because the hole is located some 150m south of main high-grade zone on the western side and may be part of further previously unrecognised high grade domain.
Heron Resource's Managing Director, Mr Mathew Longworth, said "we are seeing the drilling demonstrate the continuity of the higher grade zones, which is great news for the continuing feasibility work on Jump-up Dam. As a bonus to this in-fill
drilling work, we are particularly encouraged to see some new zones identified, including recording the highest nickel grade interception to date at Jump-up Dam, with 6.12% nickel over two metres."
"These results give us great encouragement that we will be able to upgrade substantial portions of the current indicated mineral resource estimate at Jump-up Dam to the Measured category, over the course of the feasibility studies."
To view the full report please click on the following link:
http://www.heronresources.com.au/downloads/asx/2007/hrr20070905.pdf
Any enquiries at all, give our Public Relations Officer
Briony Robertson a call on (08) 9215 4444 or
email. To unsubscribe from this newsletter, please
click here.
|