Sherwood Copper Corp.

Published : February 13th, 2008

Intersects High Grade Copper-Gold Mineralization in 4 Separate Targets at the

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Canada | Copper | Gold | Gold Mine | Growth | K Street | Lead | Silver | Volatility |

A NORTHAIR GROUP COMPANY

SUITE 860 - 625 HOWE STREET Ÿ VANCOUVER, BC  Ÿ V6C 2T6  CANADA Ÿ TEL: (604) 687-7545  FAX: (604) 689-5041

PRESS RELEASE

FOR IMMEDIATE RELEASE

 

February 13, 2008                                                                                                                #08-05

 

Sherwood Intersects High Grade Copper-Gold Mineralization in 4 Separate Targets at the Minto Mine

*4.7% Cu over 5.4m * 3.8% Cu over 7.3m * 2.7% Cu over 10.3m * 2.4% Cu over 6.0m * 2.1% Cu over 7.5m*

 

VANCOUVER, BRITISH COLUMBIA - Sherwood Copper Corporation (SWC: TSX-V) today announced results for the final nine holes from its 101-hole 2007 drill program at the high grade Minto copper-gold mine in the Yukon.  Highlights include the recognition of a significant opportunity to expand near surface resources at Area 2, further confirmation of high grade copper-gold mineralization at Area 118 and Ridgetop East, as well as a new discovery of near surface, high grade mineralization at Ridgetop West.  Highlights of these recent results are tabulated below, while complete results for these final nine holes of the 2007 program are attached.

 

Hole ID

Target

Interval

From

(m)

To

(m)

Interval (m)

Interval (ft)

Copper (%)

Gold (g/t)

Silver (g/t)

07SWC-234

Area 118

A118M

204.3

211.6

7.3

24.0

3.83

1.84

13.7

07SWC-240

Ridgetop W.

New(1)

103.9

114.2

10.3

33.8

2.72

1.37

9.9

including

 

 

106.9

112.2

5.2

17.1

3.47

1.57

12.2

07SWC-251

Ridgetop E.

 

72.0

96.3

24.3

79.7

1.00

0.35

2.6

including

 

 

72.0

79.5

7.5

24.6

2.08

0.81

5.0

07SWC-257

Area 118

 

297.8

319.3

21.5

70.5

1.59

0.90

5.5

including

 

 

310.5

315.9

5.4

17.7

4.66

2.97

15.4

07SWC-269

Area 2

L

37.2

51.1

13.8

45.3

1.29

0.34

4.5

including

 

L

45.1

51.1

6.0

19.7

2.45

0.69

9.4

 

 

M

88.0

93.3

5.3

17.4

2.17

0.65

9.1

(1) This is a new discovery with an inclined hole. There is insufficient data to calculate a true thickness, however using a similar geometry to mineralized horizons found elsewhere on the property it is assumed to be approximately 70% of the intersected interval.

 

?This is an excellent finish to a very successful 2007 exploration program, with four targets delivering high grade results over significant intervals,? said Stephen Quin, Sherwood?s President & CEO.  ?Especially encouraging is hole 07SWC-269, where shallow, high grade mineralization was found in close proximity to the Area 2 reserves included in the recent Pre-feasibility Study (PFS).  Hole 07SWC-269 stepped out more than 110m to the southeast of the nearest 2006 Sherwood hole used in the Area 2 PFS, opening up the potential for a near surface expansion of the Area 2 deposit.  The good grades and shallow depths of this mineralization in an area immediately adjacent to the positive PFS make this a high priority target for drill testing in 2008 and could lead to potential resource expansions,? said Mr. Quin.

 

?Further, the discovery of near surface, high grade mineralization at Ridgetop West illustrates the potential for new near-surface discoveries at Minto,? said Mr. Quin, ?while the continued high grade intercepts in Area 118 and Ridgetop East enhance the potential of those areas to add significant resources to the Minto Mine, beyond those previously announced.  In addition to near surface mineralization, we are steadily building up an inventory of deeper high grade intersections at the Minto Mine that opens up the vertical dimension to this highly prospective property, a dimension that has received little exploration attention in the past,? he added.

 

Geology models to support new NI 43-101 compliant mineral resource estimates incorporating the results of the 2007 drilling are currently under construction, while planning for a significant 2008 exploration program is well advanced, with drilling expected to recommence within a month.

 

2007 Drill Program

At 23,292 metres of drilling, the 101-hole campaign was more than 40% larger than originally budgeted, a direct result of the significant discoveries made during 2007.  The objective of the 2007 exploration program was firstly to more fully define the limits of the Area 2 deposit and provide technical information for the PFS, but mostly to broadly test a wide swath of the Minto property to the south, west and between the Minto and Area 2 deposits.  These are areas where various combinations of prior drilling, geophysics and Sherwood?s geological interpretation suggested potential for the discovery of further high grade copper-gold mineralization.   

 

In the 2007 program, ten holes were drilled for geotechnical and metallurgical purposes; five in the Minto pit and five at the Area 2 deposit, while 91 holes were drilled for exploration purposes. Significant new discoveries were made in the 2007 at the Area 118, Copper Keel, Airstrip and Ridgetop prospects and in the Gap between the Minto Mine and Area 2.  These prospects are discussed in more detail in the March 5, 2007 news release and are identified on the accompanying maps:

www.sherwoodcopper.com/i/pdf/2008-02-13PriorityExplorationCorridor.pdf and http://www.sherwoodcopper.com/i/pdf/Gradient-Array-IP-Sept07.pdf).

 

This release includes holes from the following areas: Area 118 (5); Area 2 (1); Central Airstrip (1); East Ridgetop (1); and West Ridgetop (1). For current drill hole locations, please view the accompanying map: (www.sherwoodcopper.com/i/pdf/2008-02-13Phase2DHLocationMap.pdf).

 

Minto Mine

The Minto project encompasses a number of high-grade copper-gold deposits located in the Yukon Territory of Canada.  Sherwood acquired the original Minto deposit in June 2005 and, in just two years from its acquisition, completed a bankable feasibility study, arranged project financing, and built a $100 million open pit copper-gold mine.  Commercial production commenced on October 1, 2007.  In parallel with these development activities, Sherwood has been running an exceptionally successful exploration program that has resulted in multiple discoveries of high grade copper-gold mineralization across its Minto Mine property.  A recent pre-feasibility study indicates how production at the Minto Mine could be increased as a result of exploration successes related to just the Area 2 discovery in 2006.  Subsequent discoveries in 2007 are now being evaluated. 

 

Sherwood

Sherwood?s successful consolidation of the ownership of the Minto project provides a unique investment opportunity ? participation in a high-grade, open pit copper-gold mine located in Canada with tremendous exploration upside.  Aggressive exploration, in parallel with successful mine development and operations, provides Sherwood the opportunity to grow from within through resource and reserve additions in pursuit of further production expansions.  Sherwood plans to continue this "growth from within" strategy, along with further operational optimizations and the pursuit of merger & acquisition opportunities, in its relentless pursuit of value.

 

Quality Assurance

The technical information in this news release has been prepared in accordance with Canadian regulatory requirements set out in National Instrument 43-101 and reviewed by Stephen P. Quin, P. Geo., President & CEO for Sherwood Copper Corporation.  The exploration activities at the Minto project site are carried out under the supervision of Brad Mercer, P. Geol., Exploration Manager with Sherwood.

 

The analytical method for the copper, gold and silver analyses is multistage acid digestion of the samples followed by atomic absorption spectroscopy for copper and fire assay with atomic absorption spectroscopy finish for gold and silver carried out by ALS Chemex in North Vancouver.  When visible gold is noted in drill core samples or regular fire assay values appear abnormally high, the pulp and screen metallic assay method is used to determine the total gold content and gold contents of different size fractions. This is considered industry best practice when dealing with coarse gold mineralization where a nugget effect is suspected. This determination is accepted as the most representative value and is used in the assay database for resource calculations. Blank and standard samples are used for quality assurance and quality control, and any check samples that assay outside the expected ranges results in the entire batch being re-assayed.  After the completion of planned drill programs at Minto, random check assays will be carried out by Acme Analytical of Vancouver.

 

Assay intervals reported herein are drill core lengths unless otherwise stated.  Because the deposit is essentially flat lying and most drill holes reported to date are vertical, true widths are generally expected to be the same as reported core lengths unless otherwise stated. 

 

Additional Information

Additional information on Sherwood and its Minto Project can be obtained on Sherwood?s website at http://www.sherwoodcopper.com..

 

On behalf of the board of directors

SHERWOOD COPPER CORPORATION

?Stephen P. Quin?

Stephen P. Quin

President & CEO

 

 

 

 

 

For further information please contact Stephen Quin, President of Sherwood Copper Corp.

or Brad Kopp or Kristy Reynolds at (604) 687-7545 or (888) 338-2200

** INTERNET ADDRESS: www.sherwoodcopper.com **

 

The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this press release. This news release may contain forward looking statements which are not historical facts, such as ore reserve estimates, anticipated production or results, sales, revenues, costs, or discussions of goals and exploration results, and involves a number of risks and uncertainties that could cause actual results to differ materially from those projected. These risks and uncertainties include, but are not limited to, metal price volatility, volatility of metals production, project development, ore reserve estimates, future anticipated reserves and cost engineering estimate risks, geological factors and exploration results.   See the Company?s filings for a more detailed discussion of factors that may impact expected results.


 

 

2007 Drill Statistics ? Minto Property

 

 

Phase I

Phase II

Total

Status

Drill Area and Type of Hole

Feb - April

May - Oct

2007

Assay Data Released

Assay Data Pending

Exploration Holes

 

 

 

 

 

Airstrip SW

 0

 11

11

11

0

Airstrip C.

 0

 2

2

2

0

Area 2

 0

9

9

9

0

Area 118

 0

27

27

27

0

Copper Keel S.

 0

4

4

4

0

Gap

6

 0

6

6

0

IROD

 0

4

4

0

Ridgetop E

 0

25

25

25

0

Ridgetop W

 0

 3

3

3

0

 

6

85

91

91

0

Geotech / Met Holes

 

 

 

 

 

Area 2

 

5

5

5

0

Minto

5

 

5

5

0

 

5

5

10

10

0

Summary All Holes

 

 

 

 

 

# of Holes

11

90

101

101

0

# of Metres

2,701

20,591

23,292

 

 


 

Details of Drill Results

To accompany Sherwood Copper News Release Dated February 13, 2008

 

Hole ID

& Target

Interval ID

From

(m)

To

(m)

Interval (m)

Interval (ft)

Copper (%)

Gold (g/t)

Silver (g/t)

07SWC-234

 

204.3

211.6

7.3

24.0

3.83

1.84

13.7

?Area 118?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

07SWC-236

 

62.6

85.3

22.7

74.5

0.63

0.14

2.1

?Area 118?

including

74.4

84.0

9.6

31.5

1.03

0.19

3.0

 

including

80.8

82.8

1.9

6.2

3.33

0.47

10.2

 

 

184.1

192.4

8.3

27.2

0.99

0.25

3.2

 

 

 

 

 

 

 

 

 

07SWC-239

 

99.6

100.7

1.1

3.6

1.08

0.04

0.6

?Airstrip C?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

07SWC-240

 

8.1

14.0

5.9

19.4

0.70

0.12

1.4

?Ridgetop W?

 

41.8

49.3

7.4

24.3

0.74

0.01

0.1

 

 

103.9

114.2

10.3

33.8

2.72

1.37

9.9

 

including

106.9

112.2

5.2

17.1

3.47

1.57

12.2

 

 

 

 

 

 

 

 

 

07SWC-251

 

38.8

45.8

7.0

23.0

0.63

0.06

0.3

?Ridgetop E?

 

72.1

96.3

24.3

79.7

1.00

0.35

2.6

 

including

72.0

79.5

7.5

24.6

2.08

0.81

5.0

 

 

113.1

118.5

5.5

18.0

0.98

0.21

2.7

 

 

 

 

 

 

 

 

 

07SWC-257

 

74.9

103.9

29.0

95.1

0.46

0.10

1.2

?Area 118?

including

90.0

103.9

13.9

45.6

0.64

0.15

1.8

 

 

297.8

319.3

21.5

70.5

1.59

0.90

5.5

 

including

310.5

315.9

5.4

17.7

4.66

2.97

15.4

 

 

 

 

 

 

 

 

 

07SWC-259

 

51.2

60.2

9.0

29.5

0.44

0.05

1.0

?Area 118?

 

69.6

73.3

3.7

12.1

0.55

0.12

2.3

 

 

125.0

138.0

13.0

42.7

0.83

0.12

2.0

 

including

125.0

129.5

4.5

14.8

1.49

0.23

3.5

 

 

 

 

 

 

 

 

 

07SWC-267

 

21.3

29.1

7.8

25.6

0.76

0.10

0.9

?Area 118?

 

95.0

108.5

13.5

44.3

0.45

0.04

0.8

 

 

320.0

342.6

22.6

74.1

0.40

0.14

1.8

 

 

 

 

 

 

 

 

 

07SWC-269

 

11.1

12.2

1.1

3.6

3.62

0.44

2.1

?Area 2?

 

37.2

51.0

13.8

45.3

1.29

0.34

4.5

 

including

45.1

51.1

6.0

19.7

2.45

0.69

9.4

 

 

88.0

93.3

5.3

17.4

2.17

0.65

9.1

 

 

108.8

111.1

2.3

7.5

0.83

0.15

2.2

Data and Statistics for these countries : Canada | All
Gold and Silver Prices for these countries : Canada | All

Sherwood Copper Corp.

CODE : SWC.V
CUSIP : 82442N 103
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Sherwood Copper is a copper development stage company based in Canada.

Sherwood Copper is listed in Canada and in United States of America. Its market capitalisation is CA$ 56.5 millions as of today (US$ 46.4 millions, € 36.8 millions).

Its stock quote reached its highest recent level on December 31, 2007 at CA$ 8.26, and its lowest recent point on November 21, 2008 at CA$ 1.01.

Sherwood Copper has 53 853 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Sherwood Copper Corp.
2007 Annual report
Financings of Sherwood Copper Corp.
2/29/2008 Signs Committed Term Sheet for Corporate Credit Facility wi...
2/15/2008 Announces $7.2 million Flow-through Financing
Nominations of Sherwood Copper Corp.
4/1/2008Makes Key Appointments to its Board & Management
1/16/2008 Appoints Kevin Weston as Chief Operating Officer
Financials of Sherwood Copper Corp.
8/27/2008Reports Continued Strong Financial Results for the Three Mon...
7/22/2008Reports Increased Copper Production & Reduced Costs in Secon...
5/30/2008Reports Strong Results from Operations in First Quarter 2008
Project news of Sherwood Copper Corp.
1/26/2009(Minto Mine)Capstone Mining Corp. Commences US$ 3 Million Resource Expan...
12/10/2008(Minto Mine)Capstone Mining Corp. Reports Final Drill Intercepts of Nea...
11/13/2008(Kutcho Creek)Increases Continuity of High Grade Copper Trend at its Kutch...
11/7/2008(Minto Mine)Raises US$37.5 million from Minto Precious Metal ProductionT...
11/4/2008(Minto Mine)Reports New Copper-Gold Discovery at Minto Mine and possible...
9/22/2008(Kutcho Creek)Reports Further High Grade Intercepts from its Kutcho Copper...
9/18/2008(Minto Mine)Reports Thick Intervals of Near Surface Copper-Gold Minerali...
9/2/2008(Kutcho Creek)Reports Multiple High Grade Intercepts from its Kutcho Coppe...
8/28/2008(Minto Mine)Reports High Rainfall temporarily restricts access to its Mi...
8/21/2008(Minto Mine)Reports Further High Grade Copper-Gold Results From Areas 2 ...
7/17/2008(Minto Mine)Releases Further High Grade Copper-Gold from Area 2 & Area 1...
7/14/2008(Kutcho Creek)Reports High Grade Intercepts from the Kutcho Drill Program
6/17/2008(Minto Mine)Announces Significant Increase in Copper-Gold Resources at M...
4/17/2008(Minto Mine)Reports Minto Copper-Gold Mine Achieves & Exceeds Design Cap...
3/10/2008(Kutcho Creek) Completes Funding Arrangements for Kutcho Project & Begins ...
2/25/2008(Minto Mine)Reports 2007 Production Results & 2008 Production Estimate f...
2/13/2008(Minto Mine)Intersects High Grade Copper-Gold Mineralization in 4 Separa...
1/14/2008(Minto Mine)Intersects High Grade Copper-Gold Mineralization at Area 118...
12/18/2007(Minto Mine) Reports Phase 2 Mill Expansion at Minto Copper-Gold Mine Co...
12/12/2007(Minto Mine) Reports Results of Pre-feasibility Study for Expansion of M...
12/7/2007(Minto Mine)Reports Groundwork has Commenced on Carmacks to Stewart Tran...
12/3/2007(Minto Mine)Intersects High Grade Copper-Gold Mineralization at Ridgetop...
10/29/2007(Minto Mine) Intersects High Grade Copper-Gold Mineralization at Area 11...
10/25/2007(Minto Mine) Ships first Minto Mine Concentrates from Skagway
9/25/2007(Minto Mine)Receives Encouraging Results From 2007 Gradient IP Geophysic...
9/19/2007Discovers High Grade at Airstrip & Expands High Grade at Are...
9/5/2007(Minto Mine)Reports "On budget & Ahead of Schedule" Phase 1 Construction...
7/25/2007(Minto Mine)Delivers First Concentrates from Minto Mine to Port of Skagw...
6/15/2007(Minto Mine)Phase 2 Exploration Program Underway at Minto Copper-Gold Mi...
6/12/2007(Minto Mine)Reports Excellent Metallurgical Test Results from Area 2 at ...
5/24/2007(Minto Mine)Discovers High Grade Copper-Gold Mineralization in Minto 'Ga...
4/24/2007(Minto Mine)Awarded Funding from the Yukon Government to Advance Area 2 ...
4/12/2007(Minto Mine)Expands Scope of Pre-feasibility Study on Minto Copper-Gold ...
4/11/2007Accelerates Phase 2 Mill Expansion at Minto Copper-Gold Mine...
Corporate news of Sherwood Copper Corp.
1/23/2009Capstone Mining Corp. Reports Debt Repayments, Funding of De...
12/24/2008Capstone Mining Corp. Mails Offer to Purchase to its Debentu...
11/24/2008Reports Cash Flow from Mining Operations of $29.9 million in...
11/21/2008Announces Closing of Precious Metal Transaction
9/19/2008sets Shareholder Meeting Date for Capstone Combination
8/5/2008Reports Higher Copper Production Forecast for 2009 & Updated...
7/25/2008Reports Phase 3 Mill Throughput Increase to 3,200tpd Approve...
6/30/2008Finalizes Exploration Agreement with Northern Tiger Resource...
6/12/2008Reports Results of Preliminary Economic Assessment for Kutch...
6/5/2008Holds Successful Annual Meeting & Reports on Strategic Objec...
5/28/2008and Western Keltic Announce Closing of Business Combination
4/7/2008and Western Keltic Mines Inc. Announce Planned Business Comb...
3/6/2008 Increases Holdings to Approximately 93% of Western Keltic S...
3/3/2008Signs Exploration Memorandum of Understanding with Firestone...
2/22/2008Acquires 91.7% of Western Keltic Shares & Extends Offer for ...
2/12/2008Takes up 85.6% of Western Keltic Shares & Extends Offer for ...
1/30/2008Extends Offer for Western Keltic Mines to February 11, 2008
12/24/2007 Mails Offer for Western Keltic Mines
11/26/2007 Announces Agreement for Acquisition of Western Keltic Mines
10/29/2007 Appear on BNN TV
10/12/2007 Holds the Official Opening Ceremony for the Minto Mine, Yuk...
10/4/2007 Reports that Minto Mine Declares Commercial Production
7/17/2007Identifies Two Extensive Copper-Gold Systems at Minto Projec...
7/16/2007Reports Geotech Program Results in Improved Pit Slopes at Mi...
5/29/2007reports Yukon Utilities Board Approves Revised Power Purchas...
5/15/2007reports Yukon Government Support for Revamped Power Purchase...
5/10/2007Nominates Industry Leader for election to its Board of Direc...
5/2/2007Announces Yukon Utilities Board Turns Down Provisions of the...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (SWC.V)
1.05-7.89%
Last quotes and information before delisting
Prev close Open
1.14 1.04
Low High
1.02 1.12
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  1.05 -%
Volume 1 month var.
0 -%
Produces
Develops
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 9/7/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 6.82-1.52%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 8.40-0.94%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.57-3.70%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.05+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.01-1.95%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 11.49-0.35%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.31+1.64%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.18+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.63+5.84%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 40.23-2.83%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :
Take advantage of rising gold stocks
  • Subscribe to our weekly mining market briefing.
  • Receive our research reports on junior mining companies
    with the strongest potential
  • Free service, your email is safe
  • Limited offer, register now !
Go to website.