Canadian Arrow Mines Ltd

Published : January 21st, 2008

issues revised Preliminary Economic Assessment (PEA) Study for Kenbridge Nickel

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Canada | Copper | Denmark | Diamond | Nickel |

Attention Business Editors:

Canadian Arrow Mines issues revised Preliminary Economic Assessment (PEA) Study for Kenbridge Nickel Project

     SUDBURY, ON, Jan. 21 /CNW/ - Canadian Arrow Mines, Ltd. (CRO: TSX-V) (the
"Company") has received an updated, positive Preliminary Economic Assessment
Study (PEA) for the Kenbridge Nickel Project near Kenora, northwestern
Ontario. This release is revised from the January 14th PEA release and
reflects changes to project resources and economics due to the discovery of a
coding error in the resource estimating software. Also included in this
revised news release are further details and cautionary statements.
     Highlights of the updated PEA include:
     -   Open pit amenable resources of 6.7 million diluted tonnes grading
         0.38% Ni and 0.23% Cu with a waste to ore stripping ratio of 1.87:1
         to a depth of 160m below surface
     -   Resources amenable to underground mining totaling 3.0 million diluted
         tonnes grading 0.63% Ni and 0.32% Cu
     -   A combined open pit/underground mining operation supplying
         2,800 tonnes per day to an on-site concentrator
     -   Open pit mining costs of $9.60/ore tonne, underground mining costs of
         $41.44/tonne, processing costs of $10.39/tonne and G&A costs of
         $2.59/tonne of ore
     -   Average cash cost/lb of $4.89 nickel net of byproducts
     -   Total recoverable metal production of 71.2 million lbs of nickel and
         49.6 million lbs of copper over a 10.5 year mine life
     -   Pre-production capital cost of $108 million including a 15%
         contingency
     -   Pre-tax Net Present Value (NPV) of $134 million at a 7.5% discount
         rate, ranging from $236 million to $32 million with +/- 20% change in
         metal pricing
     -   33% Internal Rate of Return (IRR), ranging from 51% to 14% with
         +/- 20% change in metal pricing
     -   Economics based on an average $10.00 US/lb nickel, $2.50 US/lb copper
         and $1CDN:$0.9US
     The report is co-authored by WMT Associates of Oakville, Ontario, P&E
Mining Consultants of Brampton, Ontario and Micon International Limited of
Toronto, Ontario.
     The PEA is based on the updated technical report and deposit model of
mineral resources completed by SRK Consulting (Canada) Inc., released on
January 9th, 2008 and differs only by applying a more realistic cut-off
methodology. Resource estimates completed by SRK as shown in Table 2 used
arbitrary grade cut-off values not based on mine economics. The PEA estimate
by contrast has input current industry mine operating costs, anticipated metal
recoveries, mining dilution, metal values and other economic parameters to
derive a Net Smelter Return (NSR) model to determine the break between ore and
waste. The new estimate, using computer aided open pit optimization tools, has
also resulted in an increase in depth of the open pit by 10 metres to the
1350m elevation, (160m from surface). A copy of the full PEA report will be
available on the SEDAR website within 45 days of the January 9th press
release. The PEA was prepared by WMT Associates, P&E Mining Consultants Inc.,
and Micon International Limited, all independent consulting firms, under the
direction of Mr. Malcolm Buck, P. Eng. of WMT Associates, a qualified person
as defined by National Instrument 43-101 . Mr. Buck has reviewed and approved
of the technical content of this news release.
     Table 1.PEA Updated Diluted Mineral Resources, Kenbridge Nickel-Copper
Deposit, Ontario, WMT, January 18, 2008
     -------------------------------------------------------------------------
                                                                 Contained Ni
     Classification             Tonnes (Mt)    Ni%   Cu%  S.G.         (000't)
     -------------------------------------------------------------------------
     Open pit
     ((greater than) 1350m EL)
     -------------------------------------------------------------------------
     Indicated                6.6             0.38  0.23  2.95   25.3
     -------------------------------------------------------------------------
     Inferred                 0.1 (+/- 20%)   0.50  0.40  2.95    0.5 (+/-20%)
     -------------------------------------------------------------------------
     -------------------------------------------------------------------------
     Underground                                                 Contained Ni
     ((less than) 1350m EL)     Tonnes (Mt)    Ni%   Cu%  S.G.         (000't)
     -------------------------------------------------------------------------
     Indicated                0.8             0.71  0.34  2.95   5.7
     -------------------------------------------------------------------------
     Inferred                 2.2 (+/- 20%)   0.60  0.31  2.95  13.2 (+/- 20%)
     -------------------------------------------------------------------------
     Table 2. Mineral Resource Statement, Kenbridge Nickel-Copper Deposit,
Ontario, SRK Consulting, January 2, 2008
     -------------------------------------------------------------------------
                                                                 Contained Ni
     Classification             Tonnes (Mt)    Ni%   Cu%  S.G.         (000't)
     -------------------------------------------------------------------------
     (*)Open pit
     ((greater than) 1360m EL)
     -------------------------------------------------------------------------
     Indicated                         3.4    0.60  0.33  2.95   20.3
     -------------------------------------------------------------------------
     Inferred                 0.1 (+/- 20%)   0.74  0.53  2.95    1.0 (+/-20%)
     -------------------------------------------------------------------------
     (*)Underground
     ((less than)1360m EL)
     -------------------------------------------------------------------------
     Indicated                        0.3     1.09  0.47  2.95    3.1
     -------------------------------------------------------------------------
     Inferred                 0.7 (+/-20%)    0.89  0.44  2.95    6.0 (+/-20%)
     -------------------------------------------------------------------------
     -------------------------------------------------------------------------
     Total Pit & U/G
     -------------------------------------------------------------------------
     Indicated                3.7             0.64  0.34  2.95   23.4
     -------------------------------------------------------------------------
     Inferred        0.8 (+/- 20%)            0.86  0.46  2.95    7.0 (+/-20%)
     -------------------------------------------------------------------------
     (*) Open pit mineral resources are reported at a cut-off of 0.3% nickel
         while the Underground mineral resources are reported at a cut-off of
         0.7% nickel. These cut-offs have not been verified by metallurgical
         testing or by any mining engineering studies. All figures have been
         rounded to reflect the relative accuracy of the estimates.
     Kim Tyler, President of Canadian Arrow Mines, comments: "This study
indicates the economic viability of Kenbridge Nickel Deposit. The
25,000�metres of Diamond drilling completed in 2007 has resulted in a 75%
increase in contained nickel within the open pit component of the
mineralization at comparative grade cut-offs. Based on expected mining costs
and economics, approximately 71.2 million pounds of nickel and 49.6 million
pounds of copper could profitably be recovered. In addition, the resources
defined within the open pit area, including a portion of the underground
mineralization, have been upgraded from Inferred to Indicated classification.
Definition drilling will continue throughout the first quarter of 2008 to
upgrade the underground portion of the deposit to Measured and Indicated
classification towards completing a bankable feasibility study".
     Canadian Arrow Mines has concentrated on completing the necessary steps
to advance Kenbridge to a production decision within the next few months. A
program of securing key capital items has been initiated, including a
production sized mine hoist, head frame and SAG mill. In 2007 a comprehensive
environmental baseline study was undertaken which is expected to be completed
in the first quarter 2008. Inter-agency meetings have begun with Federal and
Provincial regulators and discussions with neighbouring aboriginal communities
and leadership from Treaty No. 3 First Nations are underway.
     Kim Tyler continues "Arrow is focused on developing the Kenbridge Nickel
Project and is pleased with the significant progress made since last April
when we arrived on the site. The PEA indicates Kenbridge has the potential to
become a very profitable operation for Arrow. This study estimates that our
average cost to produce a pound of nickel, net of byproduct credits for
copper, will be $4.89 per lb. This is well below the current price of nickel
of approximately $12 per lb. We are excited about the potential for enhancing
project economics through further metallurgical studies, upgrading the
underground resource with definition drilling and exploration on our numerous
regional properties.
     2008 will be even busier and more exciting than 2007. Surface Diamond
drilling will continue to define the orebody to the approximate shaft bottom.
The advanced exploration program will commence as soon as the access trail is
upgraded to an all season road this winter. A headframe is expected to be
installed followed by dewatering of the shaft by mid of 2008. Underground
Diamond drilling is expected to commence in late summer to explore the
orebody's open extensions below the shaft and along the south strike. Baseline
environmental as well as all other technical works will be ongoing culminating
in a Bankable Feasibility Study to be completed later this year. Meanwhile,
surface exploration will be shifting away from Kenbridge and onto the regional
exploration targets at Denmark Lake, Glatz and Emmons-Prigg over the winter."
     The PEA is being carried out under the direction of The Company's Vice
President of Operations, Garett Macdonald, P.Eng, MBA, a qualified person as
defined by National Instrument 43-101. The information in this release was
prepared under the direction of R. Kim Tyler, P. Geo., President of the
Company, a qualified person as defined by National Instrument 43-101.
     Cautionary Statements
     Mineral resources are not mineral reserves and do not have demonstrated
economic viability. WMT is not aware of any known environmental, permitting,
legal, title, taxation, socio-economic, marketing or other relevant issues
that could potentially affect this estimate of mineral resources. The
preliminary assessment includes inferred mineral resources that are considered
too speculative geologically to have the economic considerations applied to
them that would enable them to be categorized as mineral reserves, and there
is no certainty that the preliminary assessment will be realized.
     About Canadian Arrow Mines, Ltd.
     Canadian Arrow Mines, Ltd. is an established Canadian exploration and
development Company committed to developing and advancing base metal deposits
close to existing infrastructure through exploration, development and
acquisition. Shares of Canadian Arrow Mines trade on the TSX Venture Exchange
under the symbol "CRO".
     If you would like to receive press releases via email please contact:
sarah@chfir.com.
     THIS PRESS RELEASE WAS PREPARED BY MANAGEMENT WHO TAKES FULL
     RESPONSIBILITY FOR ITS CONTENTS.
     THE TSX VENTURE EXCHANGE NEITHER APPROVES NOR DISAPPROVES OF THIS PRESS
     RELEASE.
     %SEDAR: 00008534E
For further information: visit the website at www.canadianarrowmines.ca, or
call toll free, 1-877-262-6354, or contact: Canadian Arrow Mines, Ltd., R. Kim
Tyler, P. Geo, President, Tel: (705) 673-8259, E-mail:
kim@canadianarrowmines.ca; CHF Investor Relations, Barry Leung, Tel: (416)
868-1079 ext. 247, E-mail: barry@chfir.com; or Cathy Hume, CEO, Tel: (416)
868-1079 ext. 231, E-mail: cathy@chfir.com

Data and Statistics for these countries : Canada | Denmark | All
Gold and Silver Prices for these countries : Canada | Denmark | All

Canadian Arrow Mines Ltd

PRODUCER
CODE : CRO.V
ISIN : CA1353431010
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Canadian Arrow is a nickel and gold producing company based in .

Canadian Arrow produces nickel, gold, cobalt and copper in Canada, develops cobalt, copper and nickel in Canada, and holds various exploration projects in Canada.

Its main assets in production are ALEXO and CHIEF PETER LAKE in Canada, its main asset in development is KENBRIDGE in Canada and its main exploration properties are ATIKOKAN PROPERTIES, HALLIDAY DOME and HART in Canada.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of Canadian Arrow Mines Ltd
5/19/2009Completes Final Tranche of Private Placement
7/14/2008Announces Flow-Through Private Placement
2/1/2008completes private placement
Nominations of Canadian Arrow Mines Ltd
7/28/2009announces appointment of George E. Pirie to Board; Withdraws...
Project news of Canadian Arrow Mines Ltd
12/21/2013renegotiates exploration
12/2/2013Renegotiates Exploration Option with San Gold
9/17/2012Commences Nickel Production,
3/20/2012De-Watering Kelex Nickel Mine
1/3/2012(Hart)receives CDN $1 million payment for 50% of Hart Nickel Proje...
9/14/2011Kelex nickel production update
3/14/2011MINE DEVELOPMENT/PRODUCTION
2/15/2011INTERSECTS 5.01% NICKEL OVER
2/9/2011INTERSECTS 5.89% NICKEL AT
7/21/2010(Alexo)on Timmins nickel projects evaluation and retains investor
6/1/2010intersects 4.53% nickel at new Night Danger discovery
5/12/2010(Alexo)Evaluating nickel production
1/7/2010(Kenbridge)Reports drill results including new nickel copper discovery
12/4/2008(Kenbridge)receives road permit for Kenbridge Nickel Project
11/12/2008(Atikokan Properties)releases Atikokan drill results
9/4/2008(Kenbridge)s Kenbridge Preliminary Economic Assessment - 89% Increase i...
8/19/2008(Kenbridge)Upgrades Kenbridge Nickel Resource Estimate - 87% Increase i...
6/26/2008(Kenbridge)Metallurgical Program at Kenbridge Nickel Project returns 90...
3/10/2008(Kenbridge)Kenbridge returns 6.23% Ni over 5.8 metres - continues to yi...
2/28/2008(Kenbridge)Kenbridge deep drilling returns 7.21% Ni over 5.5 metres
2/13/2008(Kenbridge)Key processing equipment secured for Kenbridge Nickel Projec...
2/11/2008(Kenbridge)returns drill results of 4.27% Ni and, 0.54% Cu over 5.0 met...
1/9/2008(Kenbridge)Kenbridge Nickel-Copper Deposit Resource Estimate Update - I...
12/10/2007(Kenbridge)Kenbridge deeper drilling returns high grade nickel and copp...
11/27/2007Options Two More Nickel Copper Properties and Connects Land ...
11/22/2007(Kenbridge) Acquires Key Land Positions around Kenbridge and Denmark La...
11/5/2007(Kenbridge)Discuss Kenbridge Nickel Project
10/31/2007(Kenbridge)Positive preliminary metallurgical results for Kenbridge nic...
10/25/2007(Kenbridge) 23 metres grading 0.99% nickel intersected at Kenbridge, de...
5/7/2007(Kenbridge)files NI 43-101 resource estimate for Kenbridge Nickel-Coppe...
4/11/2007(Kenbridge)Initiates Phase One Drilling on the Kenbridge Deposit
Corporate news of Canadian Arrow Mines Ltd
12/4/2014Devon CEO Richels stepping down in July, Hager to replace
12/3/2014Devon CEO Richels stepping down in July, Hagar to replace
10/18/2012proposes to extend term of warrants
6/30/2012Grants Share Purchase Options
6/27/2012$0.5m financing and property option agreement with San Gold ...
6/4/2012commences mining at Kelex
3/23/2012Receives CDN $1.475 Million
2/6/2012acquires former Inco claims
9/13/2011receives positive metallurgical nickel results
6/15/2011RECIEVES ONTARIO GOVERNMENT
5/2/2011(Alexo)INCREASES ALEXO KELEX
3/16/2011PROPOSES TO EXTEND TERM OF
3/9/2011COMPLETES DENMARK LAKE
2/16/2011(Kenbridge)COMPLETES KENBRIDGE NICKEL
5/27/2010reports Turtlepond Phase II drill results and provides updat...
1/19/2010reports more significant platinum group mineralization on fo...
3/24/2010Treaty No. 3 First Nations & Canadian Arrow Mines Conclude E...
2/25/2010Commences Phase II Nickel, PGM Exploration Drill Program
1/12/2010Reports significant platinum-palladium-gold drill results on...
11/19/2009drills sulphide mineralization at Glatz nickel project
6/23/2009announces proposed debt settlement
5/25/2009and URSA Major Minerals announce letter of intent for a busi...
3/5/2009announces extension of loan
11/24/2008announces changes to Board
11/5/2008at the Rodman and Renshaw Conference : New York
9/9/2008Receives Award from Treaty No. 3 First Nation
6/3/20082008 Summer Field Programs Underway
5/26/2008arranges debt facility
4/30/2008New Nickel Discovery - 4.51% Ni over 0.75m
4/29/2008Assay update, underground resource estimate update initiated
4/23/2008Retains AGORACOM to Provide Investor Relations, Social Netwo...
4/18/2008Identifies More Exploration Targets; Airborne Geophysical Su...
4/16/2008Receives Exceptional Nickel Recoveries from Recent Testwork
4/11/2008Presented with Developer of the Year Award
3/25/2008Begins Consultations with Treaty No. 3 First Nations for Ken...
3/11/2008Announces Change in Board
2/26/2008files positive Preliminary Economic Assessment Report for Ke...
1/24/2008 Announces C$3,000,000 Financing
1/22/2008Enters Into Two Property Option Agreements
1/21/2008issues revised Preliminary Economic Assessment (PEA) Study f...
1/14/2008receives positive assessment study for Kenbridge Nickel Proj...
12/19/2007KENBRIDGE DRILLING 42.5 metres of 1.41% Ni, 0.54% Cu
11/20/2007Reports 4.79 gm/t PGM from Kawene Lake Grab Samples
11/15/2007 Purchases Head Frame and Hoisting Equipment
11/12/2007 Reports 1.28% Nickel from Glatz Surface Grab Samples
9/12/2007 Kenbridge Nickel-Copper project open pit potential defined ...
8/28/2007acquires new nickel - copper project
8/23/2007Engineering and Metallurgical Contracts for Kenbridge Nickel...
7/5/2007reports assay results at Kenbridge Nickel-Copper Deposit
5/24/2007grants share purchase options
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (CRO.V)FRANKFURT (C6X.F)
0.015+50.00%1.02+0.79%
TSX-V
CA$ 0.015
02/01 16:48 0.010
50%
Prev close Open
0.010 0.015
Low High
0.005 0.015
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.015 -%
Volume 1 month var.
2,780,863 -%
24hGold TrendPower© : 3
Produces Cobalt - Copper - Gold - Nickel
Develops Cobalt - Copper - Nickel
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 6.92+0.58%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 8.40-0.94%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.59+1.37%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.05+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.01-1.95%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 11.49-0.35%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.31+1.64%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.18+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.63+5.84%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 40.23-2.83%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :
Take advantage of rising gold stocks
  • Subscribe to our weekly mining market briefing.
  • Receive our research reports on junior mining companies
    with the strongest potential
  • Free service, your email is safe
  • Limited offer, register now !
Go to website.