Osisko Mining Corp.

Published : January 29th, 2011

Osisko Reports Significant New Intersections at Barnat Extension

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

 

 

 

 

Osisko Reports Significant New Intersections at Barnat Extension, Including 3.19 g/t Au Over 142 Metres

MONTREAL, QUEBEC--(Marketwire - Jan. 25, 2011) - Osisko Mining Corporation ("Osisko") (TSX:OSK)(FRANKFURT:EWX) is pleased to announce additional results from the 2010 definition drill program on the Barnat Extension, located on Osisko's 100%-owned Canadian Malartic gold property, within and immediately to the east end of the current engineered pit of the Canadian Malartic and Barnat deposits. The 115 hole, 25,100 metre definition drilling program was executed along 25 metre-spaced sections and was completed in the fall of 2010.

Results for thirty-six new holes, mainly from the Barnat Extension program (east of section 5800E) are presented below. Highlights include 142.6 metres averaging 3.19 g/t Au (BA10-3913 uncut), 121.2 metres averaging 2.78 g/t Au (BA10-3911 uncut), and 142.7 metres averaging 1.40 g/t Au (BA10-3914).

Assay data from these holes are not included in the current resource block model, and in the majority of cases represent new mineralization and new ounces hosted within Pontiac metasediments. Mineralized intersections between sections 5675E and 6150E are partially outside (below) the existing engineering pit and therefore not included in current reserves. All holes to the east of section 6150E are completely outside the current engineered pit. Out-of-pit intersections are indicated below by asterisks:

 
--------------------------------------------------------------------------
Hole No.     Section  Az./dip From (m)   To (m)   Length   Au g/t   Au g/t
                                                     (m)  (uncut)    (cut)
                                                                          
BA10-3893B     6075E   180/60     24.0     52.5     28.5     3.63      ---
including                         40.5     42.0      1.5    19.35      ---
                                                                          
BA10-3896      6075E     0/44     43.5    154.0    110.5     1.42      ---
including                                                                 
                                                                          
BA10-3898      6075E     0/60    102.5    120.5     18.0     0.82      ---
And(ii)                          155.0    224.0     69.0     2.04      ---
                                                                          
BA10-3902      6050E     0/45     60.0     82.3     22.3     1.25      ---
And                              163.5    198.4     34.9     1.05      ---
                                                                          
BA10-3903      6050E     3/60     30.0     59.0     29.0     1.49      ---
                                                                          
BA10-3904      6050E   180/45     15.0     18.0      3.0     7.25      ---
And                               79.1     88.5      9.4     2.06      ---
                                                                          
BA10-3905      6075E   180/45     75.1    100.5     25.4     1.43      ---
And(ii)                          126.0    139.5     13.5     1.70      ---
                                                                          
BA10-3906      6100E   180/45     71.6    136.6     65.0     1.25      ---
                                                                          
BA10-3907      6025E     0/45     24.0     39.0     15.0     2.11      ---
And                              162.0    219.7     57.7     1.02      ---
And(ii)                          247.8    269.4     21.6     0.87      ---
                                                                          
BA10-3908      6025E     0/54     18.0     49.5     31.5     1.88      ---
And                              143.5    169.0     25.5     0.97      ---
And(ii)                          186.5    256.5     70.0     1.52      ---
                                                                          
BA10-          6125E   180/50     63.0    115.5     52.5     1.84      ---
3909(ii)                                                                  
And(ii)                          136.1    180.0     43.9     0.91      ---
                                                                          
BA10-          6150E   180/48     24.5    117.5     93.0     1.69      ---
3910(ii)                                                                  
And(ii)                          144.0    179.5     35.5     1.01      ---
                                                                          
BA10-          6150E   180/64     41.6    162.8    121.2     2.78     2.27
3911(ii)                                                                  
including                         52.5     54.0      1.5    71.30    30.00
                                                                          
BA10-3912      6000E     0/45    134.0    259.0    125.0     1.29      ---
including                        255.5    256.6      1.1    15.45      ---
                                                                          
BA10-3913      6000E     0/53     12.5     15.0      2.5     4.92      ---
And                              169.5    210.0     40.5     1.25      ---
And(ii)                          210.0    312.1    102.1     3.96     2.59
including                        243.0    243.4      0.4    40.30    30.00
including                        249.0    251.3      2.3    79.46    20.94
including                        255.0    256.4      1.4    27.00         
overall                          169.5    312.1    142.6     3.19     2.21
                                                                          
BA10-          6175E   180/45     70.3    213.0    142.7     1.40      ---
3914(ii)                                                                  
including                        158.0    159.5      1.5    11.05      ---
                                                                          
BA10-3915      6175E   180/60     45.0     49.5      4.5     4.50      ---
And(ii)                           87.4    205.5    118.1     1.07      ---
                                                                          
BA10-3916      5975E     0/45    147.0    227.3     80.3     1.07      ---
And(ii)                          246.5    286.5     40.0     0.97      ---
                                                                          
BA10-          5975E     0/52    217.1    238.0     20.9     2.27      ---
3917(ii)                                                                  
                                                                          
BA10-          6225E   180/57     95.5    139.5     44.0     1.63      ---
3918(ii)                                                                  
                                                                          
BA10-          6175E   180/45     43.0     95.5     52.5     1.60      ---
3919(ii)                                                                  
And(ii)                          144.5    203.0     58.5     0.83      ---
                                                                          
BA10-3920      5950E     0/46    195.0    276.2     81.2     1.87      ---
including                        272.2    273.4      1.2    23.90         
                                                                          
BA10-3921      5950E     0/54     63.0     73.5     10.5     3.28      ---
                                                                          
BA10-3922      5850E   180/56    159.5    170.5     11.0     1.00      ---
And                              221.2    233.1     11.9     1.01      ---
                                                                          
BA10-3923      5825E   180/46    191.5    257.5     66.0     1.20      ---
                                                                          
BA10-          5825E   180/53    276.0    277.7     1.70    39.50    30.00
3924B(ii)                                                                 
And(ii)                          300.0    318.0     18.0     3.60      ---
                                                                          
BA10-3925      5925E     0/47    202.6    262.0     59.4     0.96      ---
                                                                          
BA10-          5925E     0/56    231.0    244.0     13.0     1.25      ---
3926(ii)                                                                  
And                              275.0    279.4      4.4     2.67      ---
                                                                          
BA10-          5675E   215/52    202.5    233.5     31.0     0.53      ---
3928(ii)                                                                  
                                                                          
BA10-3933      5700E   219/45    110.6    123.0     12.4     0.80      ---
And                              204.6    371.5    166.9     0.94      ---
                                                                          
--------------------------------------------------------------------------

 

Drill holes BA10-3927, BA10-3929 to BA10-3932 and BA10-3934 did not intersect notable mineralization. The drill data suggest the Barnat Extension comprises two mineralized zones that parallel the southern limit of the Cadillac fault. The northerly extension (Sheehan Zone) is located within the Cadillac Fault and is hosted mostly by mineralized porphyry within sheared and altered ultramafic rocks. This zone is subvertical and is approximately 12 metres true thickness on average (range of 2 to 28 metres) and has been traced for at least 125 metres. The southerly extension (Mammoth Zone) is located in the Pontiac metasediments, approximately 35 metres south of the Sheehan Zone. This zone is comprised of silicified porphyry and metasediments similar to those of the Canadian Malartic deposit.

The Mammoth Zone dips subvertically to the north near surface and reverses to a 75 degree dip to the south at depth. Its average true thickness is approximately 40 metres (range of 25 to 60 metres). The thicker portions were intersected by drill holes BA10-3911 to BA10-3915. The Mammoth zone has now been traced along a strike length of 300 metres in the immediate area of the old East Malartic mine workings, and both zones are open to the east and at depth.

All NQ core assays reported above were obtained by standard 50 g fire assaying-AA finish or gravimetric finish at ALS Chemex laboratories in Val d'Or, Quebec. Reported drill core weighted averages were calculated using a minimum of 0.34g/t Au over successive intervals of 20 metres. The reported lengths of isolated mineralized intervals were minimized, and an upper cut-off of 30 g/t Au was applied to individual assays where indicated. Intersected drifts or lost core within mineralized intersections were incorporated as blank intervals.

Osisko follows strict QA-QC protocol measures in keeping with industry standards and regulatory reporting requirements. Mr. Robert Wares, P. Geo. and Executive Vice-President of Osisko, and Mr. Francois Bouchard, P. Geo., are the Qualified Persons who has reviewed this news release and are responsible for the technical information reported herein, including verification of the data disclosed including the sampling, analytical and test data underlying the technical information.

Forward-Looking Statements

Certain statements contained in this press release may be deemed "forward-looking statements". All statements in this release, other than statements of historical fact, that address events or developments that Osisko expects to occur, are forward looking statements. Forward looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential", "scheduled" and similar expressions, or that events or conditions "will", "would", "may", "could" or "should" occur including, without limitation, the commencement of commercial production. Although Osisko believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, including, without limitation, that all technical, economical and financial conditions will be met in order to warrant further development of the project, such statements are not guarantees of future performance and actual results may differ materially from those in forward looking statements. Factors that could cause the actual results to differ materially from those in forward-looking statements include gold prices, access to skilled consultants, mining development personnel, results of exploration and development activities, Osisko's limited experience with production and development stage mining operations, uninsured risks, regulatory changes, defects in title, availability of personnel, materials and equipment, timeliness of government approvals, actual performance of facilities, equipment and processes relative to specifications and expectations, unanticipated environmental impacts on operations market prices, continued availability of capital and financing and general economic, market or business conditions. These factors are discussed in greater detail in Osisko's most recent Annual Information Form and in the most recent Management Discussion and Analysis filed on SEDAR, which also provide additional general assumptions in connection with these statements. Osisko cautions that the foregoing list of important factors is not exhaustive. Investors and others who base themselves on forward-looking statements should carefully consider the above factors as well as the uncertainties they represent and the risk they entail. Osisko believes that the expectations reflected in those forward-looking statements are reasonable, but no assurance can be given that these expectations will prove to be correct and such forward-looking statements included in this press release should not be unduly relied upon. These statements speak only as of the date of this press release.

 

CONTACT INFORMATION:

Osisko Mining Corporation
John Burzynski
Vice-President Corporate Development
416-363-8653
www.osisko.com

or

Sylvie Prud'homme
Investor Relations
514-735-7131
Toll Free: 1-888-674-7563

 

Osisko Mining Corp.

PRODUCER
CODE : OSK.TO
ISIN : CA6882781009
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Osisko Mining is a gold exploration company based in Canada.

Osisko Mining holds various exploration projects in Argentina, in Brazil and in Canada.

Its main asset in production is MALARTIC in Canada and its main exploration properties are GOLDBORO, SLEITAT, JC - SMART SKARNS, HAMMOND REEF, MALARTIC CHL GOLD PROPERTY, DUPARQUET and CLEMENT LAKE in Canada, EL POTOSI and SANTA CLARA / CERRO BONITO in El Salvador, CERRO CONDORINI and COAL CREEK in Peru, CASTELO DOS SONHOS in Brazil and FAMATINA in Argentina.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Osisko Mining Corp.
12/20/2018Osisko Mining reports 39% higher grade than resource model a...
Annual reports of Osisko Mining Corp.
2008 Annual report
Financings of Osisko Mining Corp.
8/31/2011Osisko Announces an Increase in Caterpillar Lease Financing ...
8/31/2011Announces an Increase in Caterpillar Lease Financing Facilit...
11/18/2009Strengthens Balance Sheet With $241 M Proceeds From Exercise...
6/30/2009Closes $10.64 Million Flow-Through Financing
4/17/2006Announces C10$ million "bought deal" financing
Nominations of Osisko Mining Corp.
5/10/2013Anounces Election of Directors
4/17/2012Nominates Michele Darling to Board of Directors
3/14/2012Appoints Gary Sugar to Board of Directors
2/2/2012Board Member Resigns
9/16/2011Osisko Appoints Richard Ross to Board of Directors
9/15/2011Appoints Richard Ross to Board of Directors
8/22/2011Director Resigns
Financials of Osisko Mining Corp.
2/14/2014Provides Notice of Fourth Quarter and Year End 2013 Results ...
8/1/2013Reports Second Quarter 2013 Results
7/15/2013Provides Notice of Second Quarter 2013 Operating and Financi...
5/9/2013Reports First Quarter 2013 Results
4/29/2013Provides Notice of First Quarter 2013 Financial Results Rele...
2/21/2013Reports Fourth Quarter and Year-End 2012 Results
11/13/2012Reports Third Quarter 2012 Results
7/5/2012Produces 92,003 Ounces Au in Second Quarter
5/9/2012Provides Notice of First Quarter 2012 Financial Results Rele...
2/27/2012Q4 2011 Net Profit of $37.8 Million
1/16/2012Provides Notice of Fourth Quarter and Year-End 2011 Financia...
8/11/2011Releases Second Quarter 2011 Results
5/16/2011Osisko Releases First Quarter 2011 Results
5/14/2011Osisko Releases First Quarter 2011 Results
2/28/2011Releases Year-End Financial Results and Review of 2010
11/6/2009Releases Third Quarter 2009 Results
8/11/2009Releases Second Quarter 2009 Results
Project news of Osisko Mining Corp.
7/26/2017OSK Osisko Mining drills 2.7 m of 57 g/t Au at Windfall
2/21/2014Intersects 2.26 g/t Gold Over 128 Metres at Kirkland Lake
2/7/2014(Malartic)Commences 2014 Canadian Malartic Exploration Program
2/6/2014(Malartic)Reports Record January Production at Canadian Malartic
12/4/2013Intersects 61.6 Metres Averaging 1.44 g/t Au at Bidgood
11/21/2013(Malartic)Canadian Malartic Mine Produces Millionth Ounce
10/23/2013GLOBAL'S NEVADA PROJECTS ATTRACT STRONG THIRD PARTY INTEREST...
7/10/2013(Malartic)Deposits Study Reporting Local and Regional Economic Impact ...
1/30/2013Intersects 5.5 g/t Au Over 54.0 Metres at Upper Beaver
12/10/2012(Malartic)Reports November Production From Canadian Malartic
11/12/2012Announces Friendly Acquisition of Queenston
10/11/2012(Malartic)Canadian Malartic Mine Produces Half Millionth Ounce
10/10/2012(Malartic)Reports Record Quarterly Production from Canadian Malartic
9/6/2012(Malartic)Reports Record Monthly Production from Canadian Malartic
7/26/2012Acquires Common Shares of Bowmore Exploration Ltd=2E
5/17/2012(Malartic)Canadian Malartic Mill Returns to Operation
5/10/2012(Malartic)Reports Fire Damage at Canadian Malartic Mill Limited to Cyc...
1/30/2012(Famatina)s Status of Famatina Exploration Project
12/22/2011and DIOS Discover New Gold Showings on the AU33 WEST Project
11/28/2011TSX.V Company Adjacent to Osisko Property - 3 Minute Video
9/29/2011(Goldboro)Orex to Pursue Exploration Work on Goldboro Gold Project
9/8/2011(Malartic)Intersects 1.23 g/t Au Over 172 Metres at Barnat Extension
8/31/2011Osisko and EMSE Sign Agreement for Development of Famatina P...
8/31/2011(Famatina)and EMSE Sign Agreement for Development of Famatina Project ...
8/11/2011(Goldboro)Goldboro Gold Project Drill Assay Results Identify Extension...
8/5/2011Osisko Buys Back a 1% Royalty Interest on Canadian Malartic ...
8/5/2011(Malartic)Buys Back a 1% Royalty Interest on Canadian Malartic Propert...
6/21/2011Osisko Declares Commercial Production at Canadian Malartic
6/21/2011(Malartic)Declares Commercial Production at Canadian Malartic
6/17/2011Osisko Submits Notice of Termination in Duparquet Project
6/17/2011(Duparquet)Submits Notice of Termination in Duparquet Project
6/14/2011(Malartic)Intersects 1.50 g/t Au Over 63.6 Metres at Jeffrey Zone
6/13/2011(Duparquet)et Clifton Star annoncent une estimation de ressources pour ...
6/13/2011(Duparquet)and Clifton Star Release Resource Estimate for the Beattie D...
6/1/2011(Malartic)Officially Inaugurates the Canadian Malartic Mine
6/1/2011Osisko Officially Inaugurates the Canadian Malartic Mine
5/2/2011(Malartic)Announces Revised Mine Production Plan at Canadian Malartic
4/21/2011(Goldboro)Orex Exploration Inc.: Drilling Campaign Has Begun at Goldbo...
4/20/2011Osisko Mining Corporation - Drilling campaign has begun at G...
4/20/2011Osisko Mining Corporation - Drilling campaign has begun at G...
4/13/2011(Malartic)Pours First Gold at Canadian Malartic Mine
3/31/2011(Malartic)Increases Gold Reserve at Canadian Malartic to 10=2E7 Millio...
3/29/2011(Malartic)Exercises Buy Out Option in Canadian Malartic Net Smelter Ro...
2/28/2011(Malartic) Découverte de minéralisation de type Canadian Malartic
2/24/2011(Hammond Reef)Reports 124 Metres Averaging 0.73 g/t Au in Southeast Extens...
1/29/2011(Malartic)Osisko Reports Significant New Intersections at Barnat Exten...
1/25/2011(Malartic)Reports Significant New Intersections at Barnat Extension, I...
12/21/2009(Malartic)Provides Update on Construction and Development Progress at ...
12/14/2009(Malartic)Releases New Resource Estimate for Canadian Malartic Project
10/20/2009(Malartic) Intersects New Gold Mineralization on the Malartic CHL Prop...
9/14/2009(Malartic)Intersects 1.20 g/t Au Over 86.9 Metres at Jeffrey Zone
9/1/2009(Malartic)Osisko Mining Corporation: Construction Activities at Canadi...
8/20/2009(Malartic)Quebec Government Authorizes Construction of Osisko's Canadi...
2/26/2009(Malartic) Preliminary Metallurgical Results on Barnat
1/26/2009(Malartic)Announces Inferred Resource Estimate for South Barnat Deposi...
12/3/2008(Malartic) Intersects 102 Metres Averaging 3.21 g/t Au at South Barnat
Corporate news of Osisko Mining Corp.
2/13/2014Mails Letter to Shareholders Regarding Inadequate Goldcorp O...
2/5/2014Provides Corporate Update
1/29/2014Commences Legal Proceeding to Restrain Misuse of Confidentia...
1/29/2014Announces Filing and Mailing of Directors' Circular and Reco...
1/20/2014Reports Preliminary Fourth Quarter 2013 Production
1/15/2014Responds to Unsolicited Proposal From Goldcorp Inc=2E
1/13/2014Responds to Announcement by Goldcorp
12/16/2013Completes Long-Term Debt Renegotiation
10/24/2013Provides Notice of Third Quarter 2013 Operating and Financia...
7/30/2013Enhances Financial Flexibility by Improving Long-Term Debt T...
7/5/2013Intercepts 68 Metres Averaging 1=2E26 =?ISO-8859-1?Q?=20g/t=...
7/2/2013Receives Final $30 Million Payment from Kirkland Lake Gold
4/29/2013Corporate Update
4/17/2013Comments on Trading Activities
4/9/2013(Malartic)Previews Q1 2013 Canadian Malartic Operating Results
3/21/2013Discovers Two New Gold-Copper Zones at Upper Beaver
2/19/2013(Malartic)Receives Modified Operating Parameters at Canadian Malartic
2/19/2013(Malartic)s Reserves at Canadian Malartic
2/11/2013Denis Cimon Receives the 2013 Mineral Processor of the Year
1/29/2013(Hammond Reef)Provides Resource Update for Hammond Reef Project
1/24/2013(Malartic)Previews Q4 2012 Canadian Malartic Operating Results and 201...
11/12/2012(Malartic)Reports Record Monthly Throughput at Canadian Malartic
10/15/2012Founder Retires
10/9/2012Acquires Ground in Emerging Gold Belt in Mexico and Identifi...
10/3/2012Deposits the Second Tranche of itsFinancial Guarantee Coveri...
8/3/2012Secondary Crusher Installation Completed
7/24/2012Acquisition of Subscription Receipts of Druk Capital Partner...
5/16/2012Enhances Credit Agreement With CPPIB
5/14/2012(Malartic)Provides Update on Canadian Malartic
5/10/2012(Malartic)Reports Fire at Canadian Malartic Milling Plant
4/3/2012and Metis Nation of Ontario Sign Memorandum of Understanding
3/12/2012Brings First Half of Secondary Crusher Online
3/1/2012Announces Record Date for Annual Meeting
2/16/2012Canadian gold producer Osisko Mining Corporation joins Globa...
1/12/2012(Malartic)Previews Q4 2011 Canadian Malartic Operating Results
1/3/2012Responds to Below Market Price Offer for 5 Million Shares On...
12/14/2011Osisko Comments on Trading of Common Shares
12/14/2011Comments on Trading of Common Shares
10/8/2011President Sean Roosen Named Ernst & Young 2011 Quebec Entrep...
6/17/2011(Duparquet)met fin =E0 sa participation au projet Duparquet
6/13/2011Osisko and Clifton Star Release Resource Estimate for the Be...
5/14/2011Osisko publie ses r=E9sultats du premier trismestre de 2011
5/12/2011Annual and Special Meeting of Shareholders of Osisko Mining ...
4/29/2011Osisko Announces Revised Mine Production Plan at Canadian Ma...
3/29/2011Osisko Exercises Buy Out Option in Canadian Malartic Net Sme...
2/9/2011Goldcorp Sells Osisko Investment
12/22/2009Donates Shares to McGill University
12/11/2009and Clifton Star Complete Joint Venture Agreement on Duparqu...
11/13/2009Options Goldboro Gold Property From Orex Exploration
9/28/2009 Signs Option Agreement With Claim Post Resources for the Mo...
9/24/2009 Enters Into Financing Agreement With CPPIB Credit Investmen...
8/11/2009Signs Option Agreement With Midland Exploration for the Dunn...
7/10/2009Report on Osisko's Canadian Malartic Bape Hearings is Made P...
7/3/2009Osisko Mining Corporation Completes Strategic Investment
6/18/2009Comments on Trading of Common Shares
5/21/2009Discovers New Mineralized Zone Adjacent to South Barnat
5/19/2009Makes Strategic Investment
1/13/2009 Extends South Barnat to 1200 Metres Length
12/4/2008 Recognized for Strong Sustainability Performance
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (OSK.TO)FRANKFURT (EWX.F)
3.15+1.94%2.43-1.62%
TORONTO
CA$ 3.15
05/17 17:00 0.060
1.94%
Prev close Open
3.09 3.12
Low High
3.11 3.21
Year l/h YTD var.
2.42 -  3.21 14.13%
52 week l/h 52 week var.
2.36 -  3.39 -5.12%
Volume 1 month var.
1,356,981 5.35%
Produces Gold
Develops
Explores for Gold - Lead - Silver - Tin - Tungsten - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 1/23/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202417.98%3.242.41
2023-23.71%4.532.36
2022-6.17%5.022.36
20210.81%3.972.33
2020-4.88%4.851.67
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.55-1.69%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.33+6.89%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.72+0.84%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+10.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.59+1.17%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 17.50+4.48%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+2.08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20-2.38%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 2.53+13.45%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 49.62+0.78%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :