28 July 2015
Recently, the Kyrgyz Prime Minister, Temir Sariyev, inspected the Taldybulak Levoberezhny gold project of Zijin Mining. Prime Minister Temir Sariyev expressed his approval of the mines' production and infrastructure construction, saying that the local government attaches great importance on the project's operational status. He also indicated that all ministries of Kyrgyz government should fully cooperate with Zijin Mining for the mines' preparation. A group from the Kyrgyz Construction Bureau will soon be visiting the mine site to assist Zijin to solve problems.
Zijin Mining is a gold producing company based in China.
Zijin Mining holds various exploration projects in China and in Peru.
Its main asset in production is JILAU GOLD MINE in Tajikistan, its main asset in development is SHUIYINDONG in China and its main exploration properties are QUINGHAI, JINSHANGOU and ZIJINSHAND in China.
Its stock quote reached its lowest recent point on June 28, 2013 at 1.23, and its highest recent level on October 18, 2024 at 17.24.
Zijin Mining has 21 540 741 120 shares outstanding.