IMX Resources Sleeping Giant Infill Drilling Continues to Intersect High Grade Nickel Sulphides at Ntaka Hill
Published : October 09, 2012
( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Australia | Canada | Copper | Diamond | Gold | Iron | Market | Nickel | Nsa | Report | Tanzania | Uranium |

WEST PERTH, AUSTRALIA--(Marketwire - Oct. 8, 2012) -

Highlights

  • Multiple nickel intersections from the higher grade core of Sleeping Giant including:-
    • 13.75m at 1.42% Ni and 0.36% Cu from 158.25m
    • 5m at 2.14% Ni and 0.39% Cu from 235m including 0.6m at 14.75% Ni and 2.57% Cu
    • 9m at 1.06% Ni and 0.38% Cu from 188m including 0.55m at 4.95% Ni and 2.29% Cu

  • Wide zones of disseminated hanging wall nickel sulphide mineralisation confirmed including:-
    • 83m at 0.52% Ni and 0.12% Cu from 52m including 11m at 1.0% Ni and 0.26% Cu
    • 88.2m at 0.38% Ni and 0.08% Cu from 114.8m including 11.3m at 0.59% Ni and 0.13% Cu

  • Sulphide lens northeast of Sleeping Giant extended 50m south:-
    • 12m at 1.21% Ni and 0.39% Cu from a wider 33m interval at 0.83% Ni and 0.22% Cu from 184m

IMX Resources Limited (TSX:IXR)(TSX:IXR.WT)(News - Market indicators) ('IMX' or the 'Company') reports new high grade nickel sulphide intersections from the on-going Sleeping Giant infill drilling program at the Ntaka Hill Nickel Sulphide Project. The project is located approximately 250km west of the port town of Mtwara, and is part of the 100% owned Nachingwea property in south eastern Tanzania.

Managing Director Neil Meadows said, "We are very encouraged by the new high grade results from the infill drilling which is continuing to demonstrate overall continuity of both the Sleeping Giant and overlying hanging wall zones of mineralisation. Our analysis of the mineralogy from the drill assays also indicates that the mineralisation intersected will exhibit the same excellent metallurgical performance that we have demonstrated in our test work to date.

"These results will be included in an updated resource estimate due for release in the first quarter of 2013. Our geological team continues to test the exploration potential of this evolving nickel sulphide camp. IMX is committed to further drilling to enhance the already robust economics of development of the Ntaka Hill Nickel Sulphide Project."

To mid-September a total of 52 holes for 13,864m have been drilled at Sleeping Giant as part of a 16,000m Diamond drilling program to upgrade the current mineral resource classifications, expand the higher grade core of the zone, and to further define the near surface zones of hanging wall disseminated mineralisation within the northern, shallower half of the deposit area at Ntaka Hill.

Sleeping Giant - 'Higher Grade Core'

Infill drilling within the Sleeping Giant Zone has returned multiple intersections greater than 1.0% Ni that are interpreted to represent the more sulphidic 'high grade core' of the zone. These lenses consist of heavily disseminated sulphides locally, with narrow very high grade semi-massive and massive sulphide stringers and veins. Recent results include 5m at 2.14% Ni and 0.39% Cu from 235m in NAD12-286 which includes a higher grade zone of 0.6m at 14.75% Ni and 2.57% Cu. This is particularly encouraging as it confirms that Sleeping Giant has the same high tenor nickel mineralisation as the other high grade Ntaka Hill zones such as NAD13 as well as the wider disseminated nickel zone that makes up the bulk of the deposit.

Sleeping Giant - 'Overlying Disseminated Hanging Wall'

Infill drilling continues to intersect large volumes of disseminated sulphide mineralisation in the hanging wall overlying the Sleeping Giant zone. This mineralisation typically averages between 0.1 and 0.6% Ni, and locally includes higher grade intervals averaging between 0.5 and 1.0% Ni over 5 to 20m. Two recent intersections include 83m at 0.52% Ni and 0.12% Cu from 52m including 11m at 1.0% Ni and 0.13% Cu (NAD12-293) and 88.2m at 0.38% Ni and 0.08% Cu from 114.8m (NAD12-282).

Sleeping Giant - 'New Northeast Lens Extended'

As previously reported in August(1), a new lens of mineralisation grading 32.65m at 1.04% Ni and 0.22% Cu from 172.6m (NAD12-270) was intersected on the north east edge of the Sleeping Giant Zone. New drilling has extended this zone 50m south with hole NAD12-279 again intersecting a similar wide zone of disseminated sulphides grading 0.83% Ni and 0.22% Cu over 33m from 184m and including 12m at 1.21% Ni and 0.39% Cu.

Both intersections are located just below the base of the conceptual open pit in an area where no previous mineralisation wireframes had been interpreted. This mineralisation is currently interpreted to represent an eastern dip extension of the main Sleeping Giant zone.

Infill drilling at 50m centres is ongoing at Sleeping Giant with two Diamond drill rigs. Results for 14 holes totalling 3,463m covering sections 3750N to 3600N are reported in this release (Table 1).

Competent Persons / Qualified Person / NI 43-101 Statement

Information in this report relating to exploration results is based on data collected under the supervision of, or compiled by Patricia Tirschmann, P. Geo., who holds the position of Vice President, Exploration and is a full time employee of IMX Resources. Ms. Tirschmann is a registered member of the Association of Professional Geoscientists of Ontario and has sufficient relevant experience as a qualified person as defined by NI 43-101 and a competent person under the Australian JORC (2004). Ms. Tirschmann consents to the inclusion of the data in the form and context in which it appears, and approves this disclosure.

Quality Control

The drilling was completed by Capital Drilling (Tanzania) Limited. Drill core samples (NQ) are cut in half by a Diamond saw on site. Half of the core is retained for reference purposes. Samples are generally 1.0 metre intervals or less at the discretion of the site geologists. Sample preparation is completed at the ALS Chemex preparation lab in Mwanza, Tanzania. Sample pulps are sent by courier to the ALS Chemex analytical laboratory in Vancouver, Canada. Blank samples and commercially prepared and certified Ni sulphide analytical control standards with a range of grades are inserted in every batch of 20 samples or a minimum of one per sample batch. Analyses for Ni, Cu and Co are completed using a peroxide fusion preparation and ICP - AES finish (Analytical Code ME-ICP81). Analyses for Pt, Pd, and Au are by fire assay with an ICP-AES finish (Analytical Code PGM-ICP23).

CAUTIONARY STATEMENT: Readers are also cautioned to review the risk factors identified by IMX in its regulatory filings made from time to time with the ASX, TSX and applicable Canadian securities regulators.

About IMX Resources Limited

IMX Resources Limited is an Australian based mining and base & precious metal exploration company dual- listed on the Australian and Toronto stock exchanges (TSX:IXR)(TSX:IXR.WT)(News - Market indicators), with exploration projects located in Australia, Africa and North America.

In Africa, IMX owns and operates the Nachingwea Exploration Project in southeast Tanzania, which includes the potentially word-class Ntaka Hill Nickel Sulphide Project. Nachingwea is highly prospective for nickel and copper sulphides, gold and graphite mineralisation. The Ntaka Hill Nickel Sulphide Project is one of the world's best un-developed nickel sulphide projects and has the potential to produce a clean, high quality premium nickel concentrate.

In Australia, IMX operates and owns 51% of the Cairn Hill Mining Operation, located 55 kilometres south-east of Coober Pedy in South Australia, where it produces a premium coarse-grained magnetite-copper-gold DSO product at a rate of 1.8Mtpa.

IMX is actively developing the Mt Woods Magnetite Project on the highly prospective Mt Woods Inlier in South Australia. IMX currently has a JORC Inferred Resource of 569Mt @ 27% Fe at the Snaefell Magnetite Deposit and a Global Exploration Target of between 200-380Mt @ 25-35% Fe elsewhere in the project. Studies indicate that coarse grained concentrates that could be produced at Snaefell have the potential to produce a direct sinter feed product which has the potential to attract a significant price premium.

IMX has also entered into a joint venture with OZ Minerals (the Mt Woods Copper-Gold JV Project) to explore the Mt Woods tenements for copper and gold. OZ Minerals is spending a minimum of $20M for a 51% interest in the non-iron rights, with IMX retaining a 49% interest in the non-iron rights, and 100% of the iron ore rights.

IMX owns 25.65% of Uranex (ASX:UNX), which is a dedicated uranium exploration company, which is developing the Mkuju Uranium project in southern Tanzania.

Visit: www.imxresources.com.au.

Table 1: Summary of Assay Results

Sleeping Giant Zone and Ntaka Hill, Nachingwea Project, Tanzania

Drill hole Location Az / Length From To Interval % Ni % Cu Zone
(NAD12-) East/ North Dip (m) (m) (m) (m)      
  UTM:WGS84                
Section 3750N                
278 450034mE 92 / - 299.1 20.00 172.70 152.70 0.32 0.08 HW
  8883750mN 70 Incl. 23.00 36.00 13.00 0.47 0.10  
      Incl. 111.00 127.00 16.00 0.43 0.09  
      Incl. 152.00 172.70 20.70 0.54 0.20  
      Incl. 159.85 160.15 0.30 5.40 3.72  
 
        198.00 202.45 4.45 0.66 0.09 HW
 
        272.40 280.00 7.60 0.72 0.18 SLG
Section 3700N                
279 450236E 93 / - 236.9 184.00 217.00 33.00 0.83 0.22 SLG
  8883701N 70 Incl. 184.00 205.00 21.00 0.61 0.13  
 
        205.00 217.00 12.00 1.21 0.39  
Section 3650N                
280 449979E 93 / - 326.6 122.20 171.00 48.80 0.32 0.06 HW
  8883651N 70 Incl. 162.00 169.00 7.00 0.51 0.11  
 
        294.00 295.50 1.50 1.72 0.17 SLG
      Incl. 295.25 295.50 0.25 7.02 0.17  
 
        301.25 309.00 7.75 0.78 0.16 SLG
      Incl. 307.00 308.00 1.00 2.40 0.38  
283 450035E 93 / - 302.0 87.85 115.00 27.15 0.31 0.06 HW
  8883651N 70 Incl. 103.00 109.50 6.50 0.54 0.11  
 
        162.45 193.80 31.35 0.36 0.07 HW
      Incl. 190.00 193.80 3.80 0.59 0.09  
 
        270.50 274.25 3.75 0.55 0.14 SLG
286 450088E 93 / - 278.1 33.00 66.00 33.00 0.33 0.06 HW
  8883651N 70 Incl. 50.00 56.00 6.00 0.70 0.12  
 
        107.50 113.75 6.25 0.65 0.11 HW
 
        213.00 241.00 28.00 0.65 0.13 SLG
      Incl. 235.00 240.00 5.00 2.14 0.39  
      Incl. 235.00 235.60 0.60 14.75 2.57  
290 450142E 93 / - 237.0 38.35 38.90 0.55 2.71 0.72 HW
  8883651N 70              
        101.70 150.00 48.30 0.33 0.08 HW
      Incl. 142.00 149.00 7.00 0.62 0.16  
293 450195E 93 / - 221.7 52.00 135.00 83.00 0.52 0.12 HW
  8883651N 70 Incl. 53.00 64.00 11.00 1.00 0.26  
      Incl. 98.00 104.00 6.00 0.56 0.10  
      Incl. 119.00 127.50 8.50 1.15 0.22  
 
        188.00 197.00 9.00 1.06 0.38 SLG
      Incl. 191.45 192.00 0.55 4.95 2.29  
297 450246E 93 / - 231.0 94.00 109.00 15.00 0.41 0.10 HW
  8883657N 70              
        132.95 167.55 34.60 0.46 0.09  
      Incl. 132.95 143.00 10.05 0.82 0.16  
Section 3600N                
282 450024E 93 / - 332.7 114.80 203.00 88.20 0.38 0.08 HW
  8883601N 69 Incl. 128.70 140.00 11.30 0.59 0.13  
      Incl. 185.00 197.00 12.00 0.54 0.11  
 
        255.00 262.00 7.00 0.55 0.13 HW
 
      Incl. 311.00 318.00 7.00 0.53 0.69 SLG
        311.30 313.35 2.05 0.97 2.05  
284 450117E 93 / - 272.5 179.00 198.00 19.00 0.37 0.08 HW/
  8883600N 70   184.00 192.00 8.00 0.52 0.10 SLG?
288 450163E 90 / - 51.1 Abandoned; re-drilled NAD12-289   
  3600N 69              
289 450165E 90 / - 248.6 85.00 174.00 89.00 0.45 0.11 HW &
  8883600N 64 Incl. 158.25 172.00 13.75 1.42 0.36 SLG
      Incl. 160.50 163.50 3.00 1.87 0.46  
      Incl. 166.05 171.40 5.35 1.89 0.50  
292 450267E 93 / - 233.8 31.60 41.00 9.40 0.36 0.05 HW
  8883601N 69              
        143.00 152.55 9.55 0.71 0.15 SLG
      Incl. 150.00 152.55 2.55 1.66 0.38  
295 450352E 93 / - 191.7 29.60 30.30 0.70 7.05 0.22 NAD013
  8883601N 70              
        36.00 45.00 9.00 1.27 0.32 NAD013
 
      Incl. 86.00 98.00 12.00 0.50 0.18 FW to
        92.00 94.00 2.00 1.17 0.18 NAD103
     
Notes:  
Intervals represent core lengths, not necessarily true widths.  
Pt, Pd and Au assay results are not reported because in general, they are less than 1.0 g/t on a combined basis.   
NSA – No Significant Assays  
HW = Hanging Wall FW = Foot Wall SLG = Sleeping Giant High Grade

To view Figure 1, please visit the following link: http://media3.marketwire.com/docs/ixr1009fig1.pdf.

(1) ASX: 14 August 2012
The TSX does not accept responsibility for the adequacy or accuracy of this release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.

IMX Resources Limited
Neil Meadows
Managing Director
+61 8 9388 7877
nmeadows@imxres.com.au
www.imxresources.com.au
or
Professional Public Relations
Tony Dawe
Investor Relations
+61 8 9388 0944
tony.dawe@ppr.com.au
Data and Statistics for these countries : Australia | Canada | Tanzania | All
Gold and Silver Prices for these countries : Australia | Canada | Tanzania | All

IMX Resources NL

DEVELOPMENT STAGE
CODE : IXR.AX
ISIN : AU000000IXR2
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

IMX Resources NL is a nickel and copper development stage company based in Australia.

IMX Resources NL develops nickel, copper and iron in Australia, and holds various exploration projects in Australia and in Tanzania.

Its main asset in development is CAIRN HILL in Australia and its main exploration properties are KANGAROO in Canada, LUWUMBU, NTAKA, MIBANGO and NYATI in Tanzania and MUSGRAVE, BLACK HILL, MT WOODS and MT PAISLEY in Australia.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of IMX Resources NL
8/15/2016$0.94 million Placement and SPP to follow
Nominations of IMX Resources NL
10/16/2013: Resignation of Managing Director
8/26/2013: Resignation of Non-Executive Director
Project news of IMX Resources NL
12/17/2015Update on gold exploration at Nachingwea
9/24/2015Exceptional results from infill drilling at Chilalo
9/3/2015Update on Ntaka Hill joint venture
6/29/2015IMX receives US$1.7 million under Ntaka Hill joint venture
4/23/2015FCC approves Ntaka Hill joint venture with Fig Tree
4/7/2015Maiden graphite mineral resource
3/24/2015IMX agrees revised terms for Ntaka Hill joint venture
10/10/2013(Mt Woods)OZ Minerals to Withdraw from Mt Woods Copper-Gold JV
5/21/2013(Mt Woods): Mt Woods Exploration Work Plan Agreed
2/17/2013(Mt Woods)Mt Woods Copper-Gold JV With OZ Minerals to Remain in Place
9/26/2012(Ntaka)Reports Positive Flotation Results for Disseminated Nickel S...
7/23/2009(Mt Woods)Drilling Commences at Mt Woods
7/16/2009(Ntaka)Maiden Resource at Nachingwea
9/19/2008Additional High Grade Nickel, Copper and Cobalt Intersection...
6/5/2008(Cairn Hill)Trial Mining Commences at Cairn Hill
1/23/2008 NACHINGWEA NICKEL JV IN TANZANIA INTERSECTS 21 METRES OF NI...
1/9/2008(Cairn Hill) COMMITS TO CAIRN HILL DEVELOPMENT and Continental Nickel Co...
Corporate news of IMX Resources NL
8/30/2016Change of Director’s Interest Notice
8/2/2016Appendix 3B
7/28/2016Becoming a substantial holder
7/28/2016Assay results increase size of Naujombo gold anomaly
7/8/2016Corporate presentation July 2016
6/21/2016IMX completes share consolidation and name change
6/16/2016Expiry of Options and Share Appreciation Rights
5/31/2016Completion of Chilalo sale clears way for Graphex listing
5/27/2016Change of Auditor
5/10/2016Replacement Prospectus approved, Graphex IPO to proceed
5/9/2016Update to record date for in-specie distribution
4/27/2016Update on Graphex prospectus
4/21/2016Graphex IPO – reminder of closing date for IMX shareholders
4/20/2016Chairman’s address and EGM presentation
4/15/2016Update on Termite Resources
4/4/2016Graphex Mining Limited Prospectus now available
3/22/2016Presentation to Perth Graphite Conference
3/22/2016Further testwork confirms high quality of Chilalo graphite
2/1/2016IMX places shortfall from entitlement offer
2/1/2016IMX agrees MOU for development of Chilalo Project
1/29/2016Trading Halt
1/27/2016Change of Director’s Interest Notice
1/27/2016World class expandable graphite results for IMX
1/21/2016Closing of Non-Renounceable Entitlement Offer
1/18/2016Update on Termite Resources – Liquidator agrees Standstill
12/29/2015Non renounceable 1 for 3 entitlement offer
12/21/2015Proposed Demerger of Chilalo Graphite Asset
12/17/2015Chairman’s Address and AGM Presentation
10/30/2015September 2015 Quarterly Report and Appendix 5B
10/20/2015Appointment of Managing Director
10/19/2015Notice of General Meeting/Proxy Form
10/15/2015Appendix 3B
10/13/2015Indicated Resource grading 11.9% Total Graphitic Carbon
10/13/2015Becoming a substantial holder
10/2/2015Update on Termite Resources
10/1/2015Annual Report to shareholders
10/1/2015Appendix 4G
9/21/2015Appendix 3B
9/21/2015Update on liquidation of Termite Resources NL
9/21/2015Trading Halt
9/15/2015Expiry of listed options
9/15/2015Appendix 3B and Section 708A(5)(e) Cleansing Statement
9/11/2015Change of Director's Interest Notice
9/11/2015Appendix 3B and Section 708A(5)(e) Cleansing Statement
9/8/2015Testwork delivers 67.6% large and jumbo flake graphite
9/7/2015Appendix 3B and Section 708A(5)(e) Cleansing Statement
9/2/2015Potential for significant resource growth at Chilalo
8/25/2015Results of Meeting
8/25/2015Shortfall from Share Purchase Plan to be underwritten
8/14/2015Consistent coarse flake graphite at Chilalo
8/10/2015Confirmation of delisting from TSX
8/10/2015Details of Company Address
7/29/2015Security Purchase Plan
7/28/2015Potential for high grade extensions to Shimba resource
7/24/2015Application to delist from Toronto Stock Exchange
7/20/2015IMX secures cornerstone investor as part of $3M placement
7/16/2015Trading Halt
7/13/2015Fig Tree review highlights Ntaka Hill potential
6/27/2015GMP Securities issues research report
6/27/2015Expiry of unlisted options
6/27/2015Chilalo marketing and offtake update
6/27/2015IMX to receive US$1.7 million
4/20/2015First stage of Chilalo Project permitting process completed
4/17/2015Appendix 3B
4/16/2015IMX receives prepayment from Fig Tree
4/15/2015Appendix 3B
4/15/2015Allotment of shares
4/15/2015Section 708A Notice
4/15/2015IMX signs MOU for sale of 25,000 TPA of Chilalo graphite
4/14/2015Grant of Retention Licence over Ntaka Hill tenement
4/7/2015Completion of $1.57 million capital raising
4/2/2015Trading Halt
4/2/2015Final Director's Interest Notice
3/30/2015Appendix 3X
3/30/2015Appointment of non-executive director
3/30/2015Initial metallurgical testwork results from Chilalo
3/24/2015Reinstatement to Official Quotation
3/23/2015Suspension from Official Quotation
3/20/2015Trading Halt
3/16/2015Appendix 3B
3/13/2015Extension of due diligence period to 20 March 2015
3/11/2015Appointment of Chief Executive Officer (contract terms)
6/19/2014(Cairn Hill)Cairn Hill operating entity appoints Administrator
9/20/2013Agrees to US$60 Million JV with MMG at Nachingwea in an Acce...
9/12/2013(Ntaka)Reports Initial Drilling Results from Ntaka Hill
8/15/2013(Ntaka)s Sleeping Giant Resource at its Ntaka Hill Nickel Sulphide ...
7/22/2013(Mt Woods)Reports Favourable Metallurgical Test Results from Mt Woods ...
5/6/2013Reports Inferred Mineral Resource at Zeppelin Deposit of 31,...
4/24/2013: Report for the Quarter Ended 31 March 2013
4/24/2013: Report for the Quarter Ended 31 March 2013
4/17/2013Acquires 50% Interest in the St. Stephen Project
3/18/2013(Mt Woods)Announces Significant Improvement in Mt Woods Magnetite Meta...
3/11/2013Terminates Revolving Line of Credit
3/11/2013Terminates Revolving Line of Credit
2/1/2013: Report for the Quarter Ended 31 December 2012
12/9/2012Repays Revolving Line of Credit in Full
10/22/2012(Cairn Hill)Reduces Debt and Operating Costs at Cairn Hill
10/9/2012(Ntaka)Sleeping Giant Infill Drilling Continues to Intersect High G...
10/1/2012(Ntaka)Reports Results of Updated Preliminary Economic Assessment (...
9/19/2012Successfully Completes CNI Transaction
1/4/2010Signs $47 million funding agreement for Cairn Hill developme...
1/19/2010Media Release: OZ Minerals to Exercise Anti-Dilution Rights ...
8/11/2008 Sales offtake Contract and Processing Plant First Right of ...
5/16/2008(ASX : IXR) Nachingwea Nickel JV to Undertake Expanded 2008 ...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
AUSTRALIA (IXR.AX)
0.010+0.00%
AUSTRALIA
AU$ 0.010
11/14 13:01 -
0%
Prev close Open
0.010 0.009
Low High
0.009 0.010
Year l/h YTD var.
0.005 -  0.030 -66.67%
52 week l/h 52 week var.
0.005 -  0.030 -66.67%
Volume 1 month var.
3,005,531 -9.09%
Produces
Develops Copper - Iron
Explores for Cobalt - Copper - Gold - Iron - Nickel - Palladium - Platinum - Uranium
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 1/8/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2024-66.67%0.030.01
2023-9.09%0.040.02
2022-28.26%0.100.03
2021170.59%0.070.02
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 6.69-0.15%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 8.26+2.23%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.63+6.80%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06-8.33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
 2.07-0.48%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
 13.09+0.77%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
 0.30+7.14%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
 0.20+2.56%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
 2.17+0.00%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 39.22+0.28%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.10-4.55%Trend Power :
Sun Res.(Oil)SUR.AX
Released ASX Announcement: Quarterly Activities Report
AU$ 0.00+0.00%Trend Power :
Take advantage of rising gold stocks
  • Subscribe to our weekly mining market briefing.
  • Receive our research reports on junior mining companies
    with the strongest potential
  • Free service, your email is safe
  • Limited offer, register now !
Go to website.