Gryphon Gold Corporation: Updated NI 43-101 Pre-Feasibility Filed for Borealis Oxide Heap Leach in Nevada
Published : April 26, 2011
( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

CARSON CITY, NEVADA--(Marketwire - April 26, 2011) - Gryphon Gold Corporation (News - Market indicators)(OTCBB:GYPH) (the "Company") announces that a copy of the NI 43-101 Pre-Feasibility Study update of the Mineral Resources of the Borealis Gold Project located in Mineral County, Nevada, USA as at April 25, 2011 (the "2011 Study") has been filed on the SEDAR website, www.sedar.com.

The NI 43-101 compliant study, completed by Telesto Nevada Inc., examined the proposed oxide heap leach open pit operation at the Company's wholly owned Borealis Project located in the Walker Lane Gold Belt of western Nevada.

"Gryphon's long-term plan for the Borealis property has always been to advance the oxide heap leach to generate the cash flow required to fully explore one of the premier exploration targets in Nevada. The 2011 Study reflects a more conservative view of the near-term production than the 2009 Pre-Feasibility Study. This Pre-Feasibility Study illustrates that the project has a $99.7 million gross profit over the initial mine life at $1,200 gold. Our intent is to aggressively advance the exploration to achieve additional oxide heap leach reserves while moving to fully explore the potential to increase the sulphide gold resources in the Central Borealis and begin to aggressively explore the geophysical targets in the Western Pediments," said John L. Key, President and CEO of Gryphon Gold.

The principal changes reported in the 2011 Study compared to the "Pre-Feasibility Study of the Mineral Resources of the Borealis Gold Project located in Mineral County, Nevada, USA, Revised and Restated as at September 17, 2009" (the "2009 Pre-Feasibility Study") and the "NI 43-101 Technical Report on the Mineral Resources of the Borealis gold Project located in Mineral county, Nevada, USA dated April 28, 2008" (the "2008 Technical Report") are:

  • An increase in the number of measured and indicated oxide and mixed oxide in-situ gold (an increase of 227,500 oz) and silver (an increase of 1,459,800 oz) resources.
     
  • An increase in the Proven and Probable oxide and mixed oxide gold (an increase of 21,200 oz) and silver (an increase of 287,320 oz) ounces coming from the heaps and dumps.
     
  • A decrease in the aggregate Proven and Probable oxide and mixed oxide contained gold (a decrease of 8,556 oz) and silver (a decrease of 1,023,700 oz) reserves.
     
  • A decrease in the average grade of oxide and mixed oxide resources and reserves for both gold and silver.
     
  • An increase in cash operating costs.
     
  • The phasing of the construction costs into two stages, with estimated initial project costs of $12.7 million and total estimated project costs of $23.0 million.
     
  • An increase in the gold price used to determine the reserves from $800 to $1,200 per oz of gold.

The current Resources for the Borealis are illustrated in the following table.

April 2011 Pre-Feasibility Update Resource Summary(2)
      Contained
Oxide and Mixed Oxide (In-Situ) Tons Au Grade Au Oz
  Measured(1) 29,031,000 0.014 401,900
  Indicated 5,388,000 0.017 89,300
  Total 34,419,000 0.014 491,200
 
      Contained
Sulfide (In-Situ) Tons Au Grade Au Oz
  Measured 6,173,000 0.047 287,800
  Indicated 19,893,000 0.053 1,051,900
  Total 26,066,000 0.051 1,339,700
 
      Contained
Legacy Heaps and Dumps Tons Au Grade Au Oz
  Indicated 3,640,000 0.021 75,800
  1. The proven and probable Gold Reserves are included in the Measured and Indicated Oxide and Mixed Oxide Resources listed in this resource table.
  2. See Cautionary note to U.S. investors concerning estimates of Reserves and Resources below.

The Proven and Probable reserves of 368,800 ounces of gold gives the Borealis Oxide Heap Leach a six-year mine life producing an annual average of 42,100 gold equivalent ounces. Highlights are as follows:

  • Average annual production of over 42,000 oz gold equivalent.
  • Low initial construction cost of $12.7 million using a 10% contingency.
  • Average cash operating cost of $851 per oz of gold over the life of the mine.
  • After-tax Net Present Value, at 10%, of US $18.9 million, IRR of 118% and a payback of 14 months based on US$1,200 per ounce price of gold.

No inferred resources were included in the economics of this study. The inferred oxide resources (totaling 408,200 oz gold) represent potential to extend the mine life beyond the six-year plan examined in the Pre-Feasibility Study, if such inferred resources are confirmed as reserves as a result of additional exploration work. Future exploration will also provide opportunities for further resource expansion as the Borealis Property covers approximately 23.5 square miles of favorable Nevada geology.

John Welsh P.E., Jon Brown, CPG, Doug Willis, CPG, Dr. Thom Seal P.E., and Daniel Kappes, "qualified persons" as defined in National Instrument 43-101 of the Canadian Securities Administrators ("NI 43-101"), have assumed responsibility of their respective sections/subsections of the technical information relating to the Borealis Property referred to in this press release.

This press release contains "forward-looking statements" and "forward-looking information" within the meaning of Canadian and United States securities laws, which may include, but is not limited to, statements with respect to estimates of mineral reserves and resources, the Company's long term plan for the Borealis property, projected gross profit over the initial mine life, anticipated exploration at the Borealis property, estimated average annual production, estimated construction and operating costs, estimated After-Tax Net- Present Value, IRR, and payback period . Such forward-looking statements and forward-looking information reflect our current views with respect to future events and are subject to certain risks, uncertainties and assumptions, including, risks related to mineral reserves and resource estimates, risks and uncertainties related to construction timing and costs, risks related to production costs, risks related to fluctuations in supplies and equipment, risk related to our ability to obtain adequate financing, risks related to fluctuating gold prices, risks related to the inherently hazardous nature of mining –related activities, and the risks and uncertainties outlined under the section headings "Forward-Looking Statements" and "Risks Factors" in our annual report on Form 10-K, as filed with the SEC and Canadian securities regulatory authorities on June 28, 2010, under the section heading "Risk Factors" in our most recent quarterly report on Form 10-Q, as filed with the SEC and Canadian securities regulatory authorities on February 11, 2011, and in our most recent financial statements, reports and registration statements filed with the SEC (available at www.sec.gov) and with Canadian securities regulatory authorities (available at www.sedar.com). We do not undertake to update forward-looking statements or forward-looking information, except as may be required by law.

The Borealis property is described in the technical report (the "2011 Pre-Feasibility Study") titled "43-101 Pre Feasibility Study update of the Mineral Resources of the Borealis Gold Project Located in Mineral County, Nevada, U.S.A." as at April 25, 2011 prepared in accordance with National Instrument 43-101 of the Canadian Securities Administrators ("NI 43-101"). The 2011 Pre-Feasibility Study describes the exploration history, geology and style of gold mineralization at the Borealis property. Disclosure in this press release of mineral resources is based on the technical report. Details of the quality or grade of each category of mineral resources and key assumptions, parameters and methods used to estimate the mineral resources is included in the 2011 Pre Feasibility Study. The 2011 Pre-Feasibility Study also includes a description of environmental and permitting matters.

Cautionary Note to U.S. Investors concerning estimates of Reserves and Resources: This press release and the Pre-Feasibility Study referred to in this press release use the term "Proven and Probable Reserves" and "Mineral Reserves". We advise U.S. investors that while these terms are Canadian mining terms as defined in accordance with Canadian National Instrument 43-101 ("NI 43-101") – Standards of Disclosure for Mineral Projects and the Canadian Institute of Mining, Metallurgy and Petroleum ("CIM") – CIM Definition Standards on Mineral Resources and Mineral Reserves, adopted by the CIM Council, as amended, such definitions differ from the definitions in U.S. Securities and Exchange Commission ("SEC") Industry Guide 7. Under SEC Industry Guide 7 standards, a "final" or "bankable" feasibility study is required to report reserves, the three-year historical average price is used in any reserve or cash flow analysis to designate reserves and the primary environmental analysis or report must be filed with the appropriate governmental authority. U.S. investors are cautioned not to assume that any part or all of mineral deposits in this category will ever be converted into SEC Industry Guide 7 reserves. This press release, the Pre-Feasibility Study, the 2009 Pre-Feasibility Study and the 2008 Technical Report referred to in this press release also use the terms "Measured Resources", "Indicated Resources", "Measured & Indicated Resources" and "Inferred Resources." We advise U.S. investors that while these terms are defined in and required by Canadian regulations, these terms are not defined terms under SEC Industry Guide 7 and are normally not permitted to be used in reports and registration statements filed with the SEC. "Inferred Resources" have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of a feasibility study or pre-feasibility study, except in rare cases. The SEC normally only permits issuers to report mineralization that does not constitute SEC Industry Guide 7 compliant "reserves" as in-place tonnage and grade without reference to unit measures. U.S. investors are cautioned not to assume that any part or all of mineral deposits in these categories will ever be converted into Guide 7 reserves.



Gryphon Gold Corporation
John L. Key
CEO
775 883 1456
jkey@gryphongold.com
or
Gryphon Gold Corporation
Lisanna Lewis
Vice President, Treasurer
604 261 2229
llewis@gryphongold.com

Gryphon Gold Corp.

EXPLORATION STAGE
CODE : GGN.TO
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Gryphon Gold is a gold development stage company based in Canada.

Gryphon Gold holds various exploration projects in USA.

Its main exploration properties are BOREALIS, COLD SPRINGS, ASHBY, GOLD POINT, ANCHOR, CUMBERLAND, TWIN BUTTES, RUBY, GOLD REEF, STATELINE, SOUTHERN BELLE, BLACK MOUNTAIN, WATER CANYON, REGENT, BAXTER SPRINGS, BLACKROCK, ARGENTITE, FLORENCE CANYON, HORSETHIEF, SCRAPER SPRINGS, ACE, FRI GOLD, COLUMBIA, BRIK, DALE, 4 ACES, BUCKSKIN NORTH, STAR CITY and ROCK CREEK in USA.

Gryphon Gold is listed in Canada and in United States of America. Its market capitalisation is CA$ 1.9 millions as of today (US$ 1.9 millions, € 1.4 millions).

Its stock quote reached its highest recent level on December 29, 2006 at CA$ 2.35, and its lowest recent point on June 26, 2013 at CA$ 0.01.

Gryphon Gold has 194 644 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of Gryphon Gold Corp.
3/20/2012Announces $1,500,000 Bridge Loan Facility, as the First Stag...
5/25/2011Announces US$382,500 Over-Allotment Option Exercise
5/18/2011Announces Closing of US$10,000,000 Equity Financing
5/13/2011Announces Terms of $10,000,000 Equity Financing
2/7/2011Announces Filing of Registration Statement and Preliminary S...
1/21/2011Closes C$1.3M Private Placement
11/29/2007Closes Second Tranche of C$5.44M Private Placement
11/23/2007 Closes First Tranche of C$5.44M Private Placement
11/15/2007 Announces Increase in Size of Private Placement
8/7/2007Closes C$4.0 Million Private Placement
Nominations of Gryphon Gold Corp.
7/30/2012Announces Resignation of Chief Financial Officer
2/3/2012Announces Management Changes; Appoints James T. O'Neil Jr. a...
1/3/2012Appoints James T. O'Neil Jr. as CFO
7/22/2008Appoints Mining Engineer John Key as CEO & Director
Financials of Gryphon Gold Corp.
8/15/2011Announces Financial Results for 1st Quarter Ended June 30, 2...
2/11/2011Announces Financial Results for 3rd Quarter Ended December 3...
8/14/2008 Announces Financial Results for 1st Quarter Ended June 30, ...
6/27/2008Reports Annual Financial Results for March 31, 2008
2/12/2008Announces Financial Results for December 31, 2007
11/14/2007 Announces Financial Results for September 30, 2007
Project news of Gryphon Gold Corp.
6/26/2012Provides Production Update
5/1/2012Provides Production Update for April 2012
4/3/2012Successfully Completes First Test Production Pour at ADR Pla...
10/14/2011Begins Production, Ships Loaded Carbon
8/24/2011(Borealis)s Progress on Borealis Mine Development
8/2/2011(Borealis)s Progress on Borealis Mine Development
6/9/2011(Borealis)Begins Construction of Borealis Heap Leach Project
4/26/2011(Borealis)Updated NI 43-101 Pre-Feasibility Filed for Borealis Oxide H...
3/3/2011(Borealis)to Issue Updated Pre-Feasibility Study and Clarifies Mineral...
2/22/2011(Borealis)Announces Extends Option to Fix NSR Royalty
6/4/2009(Borealis)Pre-Feasibility Study for Gryphon Gold's Borealis Oxide Reso
3/10/2009(Argentite)Signs Letter of Intent on Argentite Property, Nevada
1/9/2008Summary of the Borealis Exploration Program
1/18/2007(Borealis)Gold Resource Model Update
Corporate news of Gryphon Gold Corp.
2/13/2013to Discuss Joint Venture Agreement with Waterton on Third Qu...
1/31/2013Announces Joint Venture With Waterton Global Value L.P.
1/15/2013(Ace)Announces Installation of Replacement ADR Refining Facility ...
1/7/2013Provides Operational Update
10/31/2012Announces Second Quarter Fiscal Year 2013 Financial Results ...
10/15/2012Provides Operational Update
9/25/2012and Waterton Agree to Increase Senior Secured Credit Facilit...
8/28/2012Announces Filing of Supplement to Proxy Statement
8/14/2012Reports $5.9 Million in Revenue in the First Quarter Fiscal ...
7/5/2012Mourns the Loss of Director
6/18/2012Announces Fiscal Year End 2012 Financial Results Conference ...
5/29/2012Sets Record Date and Meeting Date For Annual General Meeting
4/19/2012Secures $15,000,000 Senior Secured Credit Facility with Wate...
2/24/2012(Borealis)Provides Third Quarter Fiscal 2012 Financial Results and an ...
2/18/2012Announces Third Quarter FY2012 Financial Results Conference ...
12/5/2011Reports Gold Sales
10/24/2011Continues Loaded Carbon Shipments
9/8/2011(Ace)Announces Heap Placement at Borealis Mine
7/27/2011(Ace)Closes $3 million Private Placement of Units
3/14/2011States That Its Policy Is Not to Comment on Unusual Market A...
7/13/2009 signs lease with Newmont
6/12/2009Annual Meeting
1/7/2009Employs Cash Conservation While Continuing Plans for Mine Co...
9/3/2008Preliminary Assessment Supports Initial 46,000 ozs/yr Gold P...
8/22/2008Signs Option to Cap Borealis Royalty
8/5/2008Signs Option to Restructure its $5 Million Debt
7/16/2008Retains AGORACOM
5/22/2008Enters Option Agreement with Silver Reserve Corp.
4/29/20082008 Resource Model Update
3/27/2008Report New Resource Calculation End of April 2008
3/5/2008Reports that Blackrock Project, Nevada is to be Drilled by N...
2/28/2008and American Bonanza Terminate Merger Negotiations
2/20/2008Assessment of Proposed Merger with American Bonanza
2/12/2008Announces Planned Merger With American Bonanza
2/5/2008Smartstox Spotlights Gryphon Gold Corporation
2/5/2008Announces New COO ? Mining Engineer John L. Key
1/25/2008DRILLING UNDERWAY IN 2008 AT RED ROCK PROPERTY
1/18/2008OUTLINES PLANS FOR PROPERTIES HELD BY NEVADA EAGLE RESOURCES
11/7/2007Provides Drill Program Update
11/2/2007CSAMT Geophysical Survey Improves Drill Targeting
10/23/2007 Announces Agreement With Agnex Exploration For Regent Gold-...
10/15/2007 ANNOUNCES AN AMENDMENT TO LEASE WITH AuEx VENTURES INC. TO ...
10/15/2007Announces an Amendment to Lease With AuEx Ventures Inc. to A...
9/8/2007Reports on Annual General Meeting : Continues to increase ou...
8/23/2007Reports 174 meter (570 ft.) gold mineralized zone
8/22/2007Closes Nevada Properties Acquisition
7/6/2007acquires Nevada Eagle Resources LLC
6/27/2007reports on exploration progress
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (GGN.TO)OTC BB (GYPH.OB)
0.010+0.00%0.008-11.11%
TORONTO
CA$ 0.010
06/27 15:40 -
0%
Prev close Open
0.010 0.010
Low High
0.005 0.010
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.010 -%
Volume 1 month var.
236,700 -%
24hGold TrendPower© : -44
Produces
Develops
Explores for Gold - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 12/4/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 6.90+0.80%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 9.39+6.96%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.60+3.10%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.05+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 1.99+1.02%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 12.09+3.96%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.34+1.52%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.18+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.71+1.79%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 40.12+0.48%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :
Take advantage of rising gold stocks
  • Subscribe to our weekly mining market briefing.
  • Receive our research reports on junior mining companies
    with the strongest potential
  • Free service, your email is safe
  • Limited offer, register now !
Go to website.