Silver Peak Project |
|
Silver Peak |
|
Country |
USA
|
Province |
Nevada |
|
|
|
|
|
|
|
|
|
|
|
|
Latitude / Longitude |
39 N 19 / 114 W 14 |
|
|
|
|
Legends
|
|
|
|
|
|
|
Risk and valuation analysis of the Silver Peak Project |
|
|
|
|
|
|
|
Location of the Silver Peak Project |
This prospect is located 8 km (5 miles) south of the Alum Project and features 3 km (1.9 miles) of fossilized geothermal vents and hot springs deposits. The Project has a 55 kV substation located on lease with twin transmission lines connecting the Nevada and California power grids.
|
|
History of the Silver Peak Project |
The prospect was first explored for geothermal potential in the 1980’s. Phillips drilled seventeen gradient holes, of which four had temperature gradients of approximately 100C/km. Exploration of the prospect resumed in 2005, with two gradient holes drilled in 2005 as a joint venture between Chemetalle Foote and the previous lease owners.
|
|
|
|
|
|
|
|
|
|
|
Disclaimer
|
All information on this page comes from internal and external sources deemed reliable. This information might not be up to date, so please perform due diligence before making any conclusion or making any action. Do contact us should any information be missing or incorrect.
|
|
|
|