Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
Cours Or & Argent

Linear Metals Corporation

Publié le 07 janvier 2010

Additional High Grade Drill Results

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Lithium |

January 6, 2010 - Halifax, NS � Linear Metals Corporation (TSX: LRM) is pleased to announce additional high grade lithium drill results from the North Aubry Zone of its 100% owned, Seymour Lake Lithium Project, located to the north of Lake Nipigon, near Armstrong, in north-western Ontario. 

 

During the fall of 2009, Linear completed a 19 hole, 2,362 metre diamond drill program, including 12 drill holes within the North Aubry Zone. Drilling at the North Aubry Zone successfully intersected pegmatite mineralization in all 12 drill holes and significant lithium mineralization in 10 of the holes, including SL-09-33, SL-09-34 and SL-09-46, previously reported in a press release dated December 1, 2009.. The results of the remaining drill holes have been received and additional highlights from the North Aubry Zone include the following:

             

 

        SL-09-03A*:              11.13 metres of 1.203% Li2O and 0..033% BeO(1),

including                     6.50 metres of 2.016% Li2O and 0.040% BeO;

 

        SL-09-27A*:               5.60 metres of 1.895% Li2O and 0.068% BeO;

 

        SL-09-43:                    6.45 metres of 1.030% Li2O and 0.017% BeO;

 

        SL-09-44:                    6.75 metres of 2.100% Li2O and 0.082% BeO;

and                              3.14 metres of 2.457% Li2O and 0.031% BeO;

 

        SL-09-45:                    12.90 metres of 1.676% Li2O and 0.045% BeO;

including                     7.20 metres of 2.578% Li2O and 0.052% BeO;

 

        SL-09-47:                    3.88 metres of 1.507% Li2O and 0.081% BeO;

 

 

* Note: holes with an �A� designation are re-entry and deepening of the corresponding SL-02-XX series holes (i.e. SL-02-03, -09 and -027) from the 2002 drill program. Hole SL-09-33, previously released, was a twin of SL-02-08 which was lost at 30 m depth in pegmatite.

 

The results of the 2009 drill program have significantly extended the known area of high grade lithium-beryllium-tantalum mineralization at the North Aubry Zone, both in terms of the lateral continuity of the Main Horizon as well as at depth, with identification and/or confirmation of the Lower, Lower-1 and Lower-2 Horizons, all of which remain open in two or more directions. To date, significant lithium mineralization on the Main Horizon has been delineated over an area of approximately 200 x 250 metres, with an average sample composite thickness of 11.52 metres and an average sample composite grade of 1.467% Li2O, (from 22 drill holes applying an arbitrary cut-off of greater than three metre thickness and a composite grade greater than 0.5% Li2O). Most holes also intersected significant beryllium, and locally significant tantalum, which may be recoverable as potential by-product credits(2)(3)(4). 

 

The results indicate that the Main Horizon appears to plunge or dip beneath hole SL-02-01, towards an area where an open, lithium-rubium-cesium lithogeochemistry anomaly, approximately 600 metres long, indicates the potential for mineralized pegmatite at shallow depth. This area to the north and northeast of the North Aubry Zone is a priority target for future drilling.

 

The results of the most recent drill program support a geologic model comprised of at least four stacked mineralized pegmatite sills (open at depth below the currently deepest known horizon, Lower-2), which provide the potential to significantly increase tonnage relative to the previously known Main Sill or Main Horizon. Recent drilling has shown that the Lower Horizon primarily occurs as a composite �lamination� with the Main Sill, although locally may be located a few metres below the Main Horizon. SL-09-03A, SL-09-27A and SL-09-44 all intersected high-grade lithium in the Lower-1 Horizon, which remains open to the north, south and west. SL-09-09A also intersected a brand new horizon, the Lower-2 Horizon which, although of moderate grade and thickness where intersected, remains open in all directions.

 

A map of all drill hole and sample locations, and a collar table list, are available on the Linear Metals website at www.linearmetals.com. All holes were drilled vertically, and reported widths are estimated to be within 90 to 100% of the true widths.

 

Summary of Results � North Aubry Zone

 

 

Table 1.  Seymour Lake Project North Aubry Zone � Remaining 2009 Drill Results

 

Hole

 

Location

Horizon

From (metres)

To (metres)

Width (metres)

Li2O %

BeO%(2)(3)(4)

SL-02-03(1)

North Aubry

Main

25.65

30.20

4.55

1.210

0.036

and

 

Lower

32.50

40.70

8.20

1.370

0.038

SL-09-03A

 

Lower-1

74.17

85.30

11.13

1.203

0.033

incl

 

 

76.50

83.00

6.50

2.016

0.040

 

 

 

 

 

 

 

 

SL-02-09(1)

North Aubry

Main/Lower

1.45

22.10

20.65

0.955

0.039

SL-09-09A

 

Lower-1

53.12

58.70

5.58

0.108

nsv(5)

and

 

Lower-2

71.90

75.30

3.40

0.833

0.038

 

 

 

 

 

 

 

 

SL-02-27(1)

North Aubry

Main/Lower

3.00

26.85

23.85

1.325

0.031

SL-09-27A

 

Lower-1

62.00

67.60

5.60

1.895

0.068

 

 

 

 

 

 

 

 

SL-09-43

North Aubry

Main

51.55

58.00

6.45

1.030

0.017

and

 

Lower-1

97.28

102.08

4.80

0.735

0.010

 

 

 

 

 

 

 

 

SL-09-44

North Aubry

Main

32.80

39.55

6.75

2.100

0.082

and

 

Lower-1

72.70

75.84

3.14

2.457

0.031

 

 

 

 

 

 

 

 

SL-09-45

North Aubry

Main/Lower

48.00

60.90

12.90

1.676

0.045

incl

 

 

48.00

55.20

7.20

2.578

0.052

 

 

 

 

 

 

 

 

SL-09-47

North Aubry

Main/Lower

51.52

55.40

3.88

1.507

0.081

and

 

 

55.40

62.40

7.00

0.200

0.024

 

(1) Previously reported

(2) BeO and Ta2O5 values greater than approximately 0.04% may be recoverable based on comparison to metal oxide grades in known rare metal deposits such as Tanco�s Bernic Lake mine or Talison Minerals� Greenbushes mine, but are not supported by specific metallurgical testing on samples from the Aubry Zones. These values are currently shown in the text of the press release for reference only, to indicate potentially recoverable by-product credits in an eventual development scenario.

(3) Rb2O was encountered in many of the drill holes and is reported in the detailed drill results on the Company's website. Rb2O values are not reported in the text of the release because no metallurgical work has been undertaken to quantify what ultimately may be recoverable values of rubidium, or any other potential by-product credits such as gallium.

(4) Where significant, Ta2O5 values are reported in the text of the release.

(5) nsv = no significant values

 

Holes SL-09-03A, SL-09-09A, and SL-09-27A were designed as a preliminary test of the Lower and Deep Horizons of the North Aubry Zone, as all three holes previously intersected the Main Horizon at surface. The presence of a Lower Horizon was surmised from two narrow (approximately 0.4 metre thick) but consistent pegmatite intersections previously identified by SL-02-10 and SL-02-16, and the Lower-1 Horizon (previously referred to as the Deep Horizon) was indicated by SL-02-10, which previously intersected 1.578% Li2O over 5.20 metres from 51.85 metres downhole

 

SL-09-03A successfully intersected the well mineralized Lower-1 Horizon over an 11.13 metre thickness, returning 1.203% Li2O and 0.033% BeO, beginning at a depth of 74.17 metres, including a central 6.50 metre section running 2.016% Li2O with 0.040% BeO. Additionally, a 4.0 metre section of the 6.50 metre interval returned 0.072% Ta2O5. The parent hole, SL-02-03 previously intersected 1.210% Li2O over 4.55 metres in the Main Horizon, and 1.370% Li2O over 8.20 metres in the Lower Horizon.

 

SL-09-09A also intersected the Lower-1 Horizon over 5.58 metres beginning at a depth of 53.12 metres, but is suspected to have hit a small, local feldspar rich seam or pod running 0.100% Li2O. At 71.90 metres, a new horizon, the Lower-2, was intersected over 3..40 metres, returning a moderate grade of 0.833% Li2O and 0.038% BeO, which is open in all directions. SL-02-09 previously intersected 0.955% Li2O over 20.65 metres in the Main/Lower Horizon.

 

SL-09-27A returned a well mineralized interval of 1.895% Li2O and 0.068% BeO over 5.60 metres in the Lower-1 Horizon, starting at a depth of 62.00 metres downhole. A 3.27 metre section at the base of the interval returned 0.02% Ta2O5. Above this, SL-02-027 previously intersected 1.325% Li2O over 23.85 metres.

 

SL-09-35 was a long step-out hole, located 175 metres east of previously reported SL-09-34, on Section 99+25N, targeting an Enzyme Leach soil anomaly. The hole intersected two narrow (approximately 0.5 metres thick) pegmatite horizons, potentially equivalent to the Main and Lower Horizons, at depths of 162.50 and 192.80 metres. Both intersections are highly anomalous in rare metals, returning up to 0.100% Li2O, 0.100% BeO, and 0.02% Ta2O5. The contacts of both pegmatites also occur at noticeably higher core angles (20 to 30 degrees to CA) than those to the west, and may indicate, as do some outcrops in recent mapping, that in places the pegmatite sills deviate from a sub-horizontal to sub-vertical orientation. This potential geometry has not been tested by either the 2002 or the 2009 drilling programs as all holes were drilled vertically.

 

Hole SL-09-36 was located approximately 75 metres east of any previous drilling on the North Aubry Zone. The hole intersected the Main Horizon over 0.40 metres starting at 26.65 metres downhole, without returning any significant assays, indicating that the Main Horizon may be locally pinching out to the southeast in this area (similar to nearby holes SL-02-06, SL-02-12, and SL-02-13).

 

Hole SL-09-43 was collared approximately 50 metres to the east of SL-09-03A and 75 metres west of previously reported SL-09-46 on Section 99+50N, to fill in the gap between the two drill holes. The hole successfully intersected the Main and Lower-1 horizons, returning 1.030% Li2O over 6.45 metres, starting at 51.55 metres downhole, in the Main Horizon. The Lower-1 Horizon, starting at 97.28 metres downhole, returned 4.8 metres of 0.735% Li2O.

 

Hole SL-09-44 is located 50 metres east of SL-09-27A, on Section 99+25N, intersecting very high-grade lithium mineralization in both the Main and Lower-1 Horizons. Beginning at a depth of 32.80 metres, the Main Horizon returned 6.75 metres of 2.100% Li2O and 0..082% BeO, while the Lower-1 Horizon returned 2.457% Li2O and 0.031% BeO over 3.14 metres starting at 72.70 metres downhole. 

 

Hole SL-09-45 is located 50 metres east of SL-09-44, also on Section 99+25N, and intersected a composite Main and Lower Horizons, returning 1.676% Li2O and 0.045% BeO over 12.90 metres, starting at 48.00 metres downhole. Emphasizing the high grade nature of this intersection, this horizon included a 7.20 metre section of 2.578% Li2O with 0.052% BeO. A 3.20 metre section at the base of the high grade interval returned 0.02% Ta2O5. 

 

Hole SL-09-47 is located 85 metres east of any previous drilling on Section 98+50N and also appears to have intersected a combined Main/Lower pegmatite sill that returned 1.507% Li2O and 0.081% BeO over 3.88 metres in the Main Horizon equivalent. A 2.80 metre section at the top of the interval returned 0.02% Ta2O5. The lower part of the sill, equivalent to the Lower Horizon, returned 0.200% Li2O over 7..00 metres and, similar to SL-09-09A, may have intersected a local feldspar rich pod in the sill. Further drilling will be required to establish the extent of the local feldspar pods.

 

Brian MacEachen, Linear Metals President & CEO, states, �The latest drill program has significantly advanced the Seymour Lake project, to the point that we are now seeing the potential for the North Aubry Zone to develop into a sizeable, high grade, at-or-near surface lithium deposit comprised of the Main Horizon along with multiple, stacked, lithium-bearing lower horizons. We are also pleased to see the continued potential for additional by-product elements such as beryllium and tantalum, as well as the excellent exploration potential of the property.�

 

Summary of Results � South Aubry Zone

 

Six holes were completed during the 2009 drill program in the area of the South Aubry Zone, all located to the east of previous drilling. The results of this program indicate that the pegmatite horizons appear to be pinching out locally to the northeast, and further exploration of the South Aubry horizons will concentrate to the immediate west, southwest and southeast where strong lithogeochemical anomalies (up to 800 metres long) and strong Enzyme Leach soil anomalies indicate possible sub-surface pegmatites in areas that have never been drill tested. Recent sampling has also identified a very strong lithium lithogeochemical and Enzyme Leach soil anomaly located approximately 1 kilometre southeast of the South Aubry, over a large hill approximately 2 kilometres long and 1 kilometre wide, also not previously drill tested.

 

Holes SL-09-38 and SL-09-48 are located approximately 150 metres and 50 metres east of SL02-18, respectively. The holes were designed as down-dip step outs to the east of SL-02-17 and SL-02-18, both of which intersected strong lithium mineralization (see press releases of August 25th and September 2nd, 2009). SL-09-38 did not intersect any pegmatite, but appears to have drilled into one of the altered (holmquistite) controlling structures. SL-09-48 intersected four relatively narrow pegmatite sills, the lower two of which were lithium-beryllium bearing (possibly equivalent to the Lower-1 Horizon). The upper sill, starting at 73.43 metres downhole intersected 0.422% Li2O and 0.062% BeO over 1.23 metres, while the lower, starting at 76.68 metres downhole, returned 0.854% Li2O and 0.032% BeO over 2.32 metres. 

 

Holes SL-09-37, SL09-40, SL-09-41, and SL-09-42 were located significantly further east (approximately 500 to 800 metres), and designed to test Enzyme Leach soil anomalies. Although intersecting some metasomatic alteration along structures, these holes did not encounter any pegmatite sills (SL-09-40 was collared in granite and abandoned at 20 metres depth). The possibility that the pegmatites have a sub-vertical geometry in these areas needs to be tested with additional inclined drilling.

 

Summary of Results � Pye Showing (historically called the Seymour Showing)

 

A historic pegmatite occurrence, the Pye Showing, was relocated approximately 1,600 metres east of the North Aubry Zone. Enzyme Leach soil sampling in the area identified a strong anomaly, particularly to the west (down-dip) of the pegmatite outcrop (which locally contains spodumene-beryl mineralization). SL-09-39 was collared approximately 225 metres northwest of the showing, and successfully intersected 7..94 metres of pegmatite sill, starting at 86.50 metres downhole. The intersection originally carried up to approximately 25% spodumene, but unfortunately in this location the pegmatite is highly hematite-sericite altered (near a large fault) and returned less than 0.1% Li2O. This hole confirms however that significant thickness� of mineralized pegmatite occur at kilometric distances from the original Aubry occurrences. Further exploration is required to the west and south of the showing to explain the lithium Enzyme Leach soil and lithogeochemical anomalies.

 

The Seymour Lake Project benefits from excellent location and infrastructure. The project is accessible by an all-weather logging road, and only 10 kilometres by road from the main CN rail line at Ferland Station, where there are several rail sidings. Approximately nine kilometres to the east of the Aubry zones, Ontario Hydro is currently developing its Little Jackfish River hydroelectric project, scheduled for completion in late 2013 or early 2014.

 

Analyses for lithium and all other elements were carried out on sawed half core at Activation Laboratories in Ancaster, Ontario. Samples are crushed to 90% passing 2 mm, digested using sodium peroxide fusion, and followed by ICP or ICP-MS analysis, which for lithium has a 3 ppm lower detection limit   Standard QA/QC techniques, including the submission of company blanks, duplicates, and �ore-grade� lithium-tantalum-beryllium standards are used to monitor the analytical results.

 

This press release was prepared under the supervision of Matthew Ian Rees, P.Geo., VP Exploration for Linear Metals, who is a Qualified Person as defined under National Instrument 43-101. Mr. Rees has reviewed the scientific and technical information in this press release.

 

For further information, please contact: 

LINEAR METALS CORPORATION

Brian MacEachen

President and Chief Executive Officer

 (902) 482-1240        

Website: www.linearmetals.com

 

The TSX Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.

 

 Forward-Looking Information: This release includes certain statements that may be deemed "forward-looking statements". All statements in this release, other than statements of historical facts, that address future production, reserve potential, continuity of mineralization, exploration drilling, exploitation activities and events or developments that the Company expects are forward-looking statements. Although the Company believes that the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. The likelihood of future mining at Seymour Lake is subject to a large number of risks and will require achievement of a number of technical, economic and legal objectives, including obtaining necessary mining and construction permits, completion of pre-feasibility and final feasibility studies, preparation of all necessary engineering for pits and processing facilities as well as receipt of significant additional financing to fund these objectives, as well as funding mine construction. Such funding may not be available to the Company on acceptable terms or on any terms at all. There is no known ore at Seymour Lake and there is no assurance that the mineralization at Seymour Lake will ever be classified as ore. For more information on the Company and the risk factors inherent in its business, investors should review the Company's Annual Information Form at www.sedar.com

 

.

Linear Metals Corporation

EXPLORATEUR
CODE : LRM.TO
ISIN : CA8613081048
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Linear Metals est une société d’exploration minière d'argent et d'or basée au Canada.

Linear Metals détient divers projets d'exploration au Canada et au Mexique.

Ses principaux projets en exploration sont LA MORENA et COBRE GRANDE au Mexique et SEYMOUR LAKE et KM61 au Canada.

Linear Metals est cotée au Canada et aux Etats-Unis D'Amerique. Sa capitalisation boursière aujourd'hui est 3,2 millions CA$ (3,1 millions US$, 2,4 millions €).

La valeur de son action a atteint son plus haut niveau récent le 18 janvier 2008 à 1,14 CA$, et son plus bas niveau récent le 22 mai 2013 à 0,04 CA$.

Linear Metals possède 80 331 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de Linear Metals Corporation
11/02/2011Announces $1,000,000 Private Placement
04/08/2009Announces Completion of Private Placement
22/07/2009Announces $900,000 Private Placement
Attributions d'options de Linear Metals Corporation
09/08/2011Retains Alliance Advisors as US Investor Relations Consultan...
Nominations de Linear Metals Corporation
26/03/2008Appoints Dr. James W. Gill as Director
11/12/2007Announces New Appointments
Projets de Linear Metals Corporation
10/05/2011Provides An Update On Its Nyanza Project Exploration Program...
31/03/2011(Seymour Lake)Agrees to Option Agreement on Seymour Lake Project
09/02/2011Signs Option Agreement To Acquire Large Gold And Base Metal ...
07/01/2010Additional High Grade Drill Results
07/10/2009(Seymour Lake)Provides An Update on the Seymouth Lake Lithium Project
10/09/2009(Seymour Lake)Reports Additional Beryllium And Tantalum Results Compiled F...
24/07/2009(Cobre Grande)Provides Update onCobre Grande Purchase Option
09/12/2008(Km61)Reports 43-101 Mineral Resources at KM61 Project
24/11/2008(Km61)Reports Positive Metallurgical Results and Significant Deep ...
24/09/2008(Km61)Deep Holes at Linear Metals KM61 Project Show Molybdenum Min...
03/09/2008(Km61)Encounters Strong Molybdenum Mineralization in Offsets to Hi...
20/08/2008(Cobre Grande)Extends Copper-Molybdenum Mineralization in El Oso Zone at C...
23/07/2008(Km61)Intersects Longest Molybdenum-Copper-Silver Intervals to Dat...
02/07/2008(Km61)Continues to Intersect Long Intervals of Molybdenum-Copper-S...
18/06/2008(Cobre Grande)Intersects High Grade Copper-Silver in Northwest Skarn at Co...
15/05/2008(Km61)Intersects High-Grade Molybdenum in the Main Zone at KM61 Pr...
13/05/2008(Cobre Grande)Announces New Discovery at Cobre Grande Copper-Molybdenum Si...
09/05/2008(Km61)Connects Mineralization Across the Main Zone and Makes a New...
05/03/2008(Km61)Reports Additional Molybdenum-Copper-Silver Mineralization a...
12/02/2008(Km61)Continues to Intersect Wide Intervals of Molybdenum-Copper-S...
01/02/2008(Cobre Grande)Extends Mineralization by 200 Metres and Intersects New Zinc...
04/10/2007Drilling Intersects Significant Mo-Cu-Ag Mineralization
Communiqués de Presse de Linear Metals Corporation
24/04/2012Announcement
09/01/2012Reports Gold Mineralization in Kamwango Core Samples-Assays ...
28/11/2011Kenyan Partners of Linear Metals and African Queen Mines Set...
22/08/2011Increases Nyanza Gold and Base Metal Property Portfolio by 6...
06/07/2011Commences Drilling on Its Nyanza Project in Kenya
03/09/2009Additional Results Announced From Linear
25/08/2009Reactivates Seymour Lake Lithium/Tantalum/Beryllium Project
09/02/2008To Begin Trading on the Toronto Stock Exchange And Commences...
11/01/2008Plans Aggressive 2008 Work Programs
18/12/2007ACQUISITION OF SHARES OF LINEAR METALS CORPORATION
09/11/2007Mineralization Extended Over One Kilometre at LinearMetals?C...
16/08/2007Sampling of Historic Core at Linear Metals' KM61 Project Inc...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (LRM.TO)OTHER OTC (LMTCF)
0,040+0.00%0,573+14.37%
TORONTO
CA$ 0,040
22/05 15:28 -
0%
Cours préc. Ouverture
0,040 0,040
Bas haut
0,040 0,040
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,040 -%
Volume var. 1 mois
130 000 -%
Produit
Développe
Recherche Beryllium - Copper - Gold - Lithium - Silver - Tantalum - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
6,83 AU$-1,30%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 +100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,18 US$+5,60%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,63 GBX-0,63%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,20 +2,80%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 +0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
14,50 +4,39%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,33 +0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 +5,56%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
2,05 +6,22%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
37,87 US$-4,85%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :
Sun Res.(Oil)SUR.AX
Released ASX Announcement: Quarterly Activities Report
0,00 AU$+0,00%Trend Power :
Profitez de la hausse des actions aurifères
  • Inscrivez-vous à notre market briefing minier
    hebdomadaire
  • Recevez nos rapports sur les sociétés qui nous semblent
    présenter les meilleurs potentiels
  • Abonnement GRATUIT, aucune sollicitation
  • Offre limitée, inscrivez-vous maintenant !
Accédez directement au site.