Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
Cours Or & Argent

Probe Mines Limited

Publié le 30 janvier 2012

Announces Additional Assay Results for its Borden Lake Gold Project: Infill Drilling Returns up to 1

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter

Re:        News Releases - Monday, January 30, 2012
Title:     Probe Mines Announces Additional Assay Results for its Borden Lake Gold Project: Infill Drilling Returns up to 111 metres grading 1.1 g/t Au; Exploration Drilling Update

Toronto, January 30, 2012 -- PROBE MINES LIMITED (TSX-V: PRB) ("Probe" or the "Company") is pleased to announce that it has received further assays from its ongoing drilling program at the Company's Borden Lake Gold Project near Chapleau, Ontario. Results for diamond drill holes BL11-115 to BL11-122 were received with intersections of up to 111 metres averaging 1.1 g/t gold ("Au") in the infill drilling. Results are also announced for the first six exploration holes testing targets along-trend of the Borden Lake Zone in the area of the fold hinge. Holes BN11-01 to BN11-06 returned intervals of up to 13 metres averaging 0.5 g/t Au, with individual samples of up to 3.2 g/t Au.

Borden Lake Zone

Drilling results confirm the continuity of the mineralized zone within the previously announced Initial Resource Estimate and are also successfully extending the deposit to depth. Hole BL11-121 identified higher grade mineralization down to a vertical depth of approximately 306 metres, including a 50 metre-wide interval averaging 1.9 g/t Au, while hole BL11-119 identified gold mineralization down to a vertical depth of approximately 416 metres, the deepest intersection to date on the Borden Lake Zone. Hole BL11-115 was stopped while entering a higher-grade mineralized zone at approximately 400 metres depth and will have to be lengthened or re-drilled. Updated plans and sections will be available on the Company's website at www.probemines.com. Highlights of the current results are presented in the following table. Drill widths represent approximate true widths for all holes:

DDH Section From (m) To (m) Width (m) Au (g/t)
BL11-115 700m NW 55.5 109.0 53.5 0.4
including 93.0 105.0 12.0 1.1
BL11-115 393.4 395.9 2.5 1.1
 
BL11-116 800m NW 68.0 76.0 8.0 1.0
BL11-116 183.9 207.2 23.3 0.5
BL11-116 251.7 296.0 44.3 0.4
 
BL11-117 600m NW 211.6 338.0 126.4 0.4
including 237 252.3 15.3 0.9
also including 327 334.0 7.0 1.0
 
BL11-118 600m NW 163.0 168.0 5.0 0.4
BL11-118 300.0 381.0 81.0 0.4
including 344.0 348.0 4.0 1.3
also including 375.0 381.0 6.0 1.0
 
BL11-119 600m NW 184.0 187.0 3.0 1.5
BL11-119 334.0 418.0 84.0 0.6
including 337.0 340.2 3.2 2.9
also including 361.0 366.0 5.0 1.5
also including 398.0 406.0 8.0 1.9
 
BL11-120 400m NW 213.0 263.9 50.9 0.6
including 247.0 251.0 4.0 1.8
 
BL11-121 750m SE 196.0 307.0 111.0 1.1
including 232.0 282.0 50.0 1.9
also including 262.0 271.0 9.0 5.6
 
BL11-122 400m NW 233.1 278.0 44.9 0.4





Drill holes BL11-115 to BL11-122 represent infill holes between previously announced sections and demonstrate the continuity of the Borden Lake Zone. Mineralization remains open in both directions along strike of the Zone and at depth. The goal of the infill program is to upgrade the classification categories of the previously announced gold Resource; expand the Resource to depth; and further delineate the "satellite zones" identified in the Resource Estimate for inclusion in a NI 43-101-compliant resource update.

Borden Lake Updated Resource Estimate

The Company is planning to commence an update of its previously reported NI 43-101-compliant Initial Resource Estimate for the Borden Lake gold deposit (see News Release dated July 23, 2011) this week. The updated resource estimate will provide a more rigorous evaluation of the gold grade distribution and focus on upgrading much of the Initial Resource Estimate classification as well as expanding the resource. The Initial Resource Estimate was calculated using holes BL11-01 to BL11-77, while the Updated Resource is expected to include up to Hole BL11-140, representing an additional 18,000 metres of drilling. Micon International Limited ("Micon") will be responsible for preparing the updated resource estimate. It is expected that the Updated Resource Estimate, which should take approximately four to six weeks to complete, will form the basis for a NI 43-101-compliant Preliminary Economic Assessment ("PEA") to begin soon after the Updated Resource Estimate is ready.

The Borden Lake gold resource was initially estimated by Micon along approximately 1,600 metres of strike length from surface to vertical depths of up to 340 metres. The Company reported a NI 43-101 Initial Resource Estimate for the Borden Lake gold zone, at a cut-off grade of 0.3 g/t Au, of 11,607,000 tonnes averaging 0.8 g/t gold for 305,000 ounces of gold in an Indicated Resource and an additional Inferred Resource of 169,322,000 tonnes averaging 0.69 g/t gold for 3,755,000 ounces of gold.

Borden Lake Exploration Drilling

The Company has commenced a systematic, long-term evaluation of the numerous regional targets currently identified along the 17 kilometres of strike length within its Borden Lake property. Early results are encouraging, with the similarity in lithologies, encountered to date, to those of the main Borden Lake gold zone and the presence of gold suggesting that the Borden Lake Belt has the potential to host multiple mineralized zones.

The Company currently has one drill testing geophysical targets along the projected trend of the Borden Lake Gold Zone to the northwest in the area of the fold hinge and north limb of the Borden Lake Belt. Results for the first six holes, testing two targets, have been received and indicate the presence of gold zones similar to those identified within the Borden Lake Zone. Hole BN11-04 returned a narrow zone gold, grading 1.2 g/t over 0.8 metres, while Hole BN11-06 returned a thicker zone of 13 metres averaging 0.5 g/t Au, including a 1 metre sample containing 3.2 g/t Au. Plans and sections for the current holes are provided on the Company's website (see link above). True thicknesses have yet to be determined.


Borden Lake Exploration Drilling Highlights

DDH From (m) To (m) Width (m) Au (g/t)
BN11-04 35.2 36 0.8 1.2
 
BN11-06 108 121 13.0 0.5
including 120.0 121.0 1.0 3.2
 




Holes BN11-01 to -03 tested a strong ground geophysical target and encountered a thick zone of ultramafic rock, representing the first occurrence of this unit in the Belt. The holes were drilled at an acute angle to bedding and the target is currently being re-drilled in the opposite direction. Ultramafic rocks are frequently associated with gold mineralization in other Temiskaming-hosted deposits elsewhere in Ontario and Quebec. Their presence at Borden Lake underlines the previously unrecognized geological similarities between these gold bearing belts.

Holes BN11-04 to -06 tested a parallel zone to that tested by Holes -01 to -03 and intersected repeating sequences of amphibolites and metsedimentary gneisses similar to those observed to the south. A 13-metre wide gold zone was identified in Hole BN11-06, and was associated with an amphibolite layer.

The exploration drill program is currently on Hole BN11-17 and results will be released as they are received.

Dr. David Palmer, President of Probe, states "We are very encouraged by results from the project to date. The Borden Lake gold discovery is continuing to distinguish itself in infill and expansion drilling and has quickly grown to a stage where more rigorous evaluation is warranted, while the exploration drilling further along trend has indicated a geological setting similar to the Borden Lake gold zone with the potential to host related mineralization. Owing to this potential, the positive early results and the large number of targets that remain to be tested, we will continue to expand the exploration drilling program outside of the main zone area."

Probe has instituted a strict quality assurance and quality control ("QA-QC") program for the Borden Lake drill core sampling, with each fire assay furnace batch of 40 samples including two certified reference materials (standards), one blank sample and one core duplicate sample. Quality control guidelines and ongoing QAQC monitoring are being carried out by Probe personnel.

The contents of this press release have been reviewed and approved by Micon International Limited for the section announcing the commencement of the NI 43-101-compliant Updated Resource Estimate.

About Probe Mines:
Probe Mines Limited is a well financed, Canadian base and precious metal exploration company with approximately $33MM in treasury and a portfolio of highly prospective mineral properties. The Company is actively exploring a significant new gold resource on its Borden Lake project near Chapleau, Ontario and owns 875 claims covering approximately 14,000 hectares in the McFauld's Lake area, including a 100% interest in the Black Creek chromite deposit. Probe also maintains a 5% net smelter royalty on a portion of Agnico Eagle's Goldex Mine near Val d'Or, Quebec, which began production in 2008, and a 45% interest in a joint venture property with Lake Shore Gold Corp, which surrounds Lake Shore's Timmins Mine project. The Company's shares trade on the TSX Venture Exchange under the symbol PRB.

David Palmer, Ph.D., P.Geo., is the qualified person for all technical information in this release. To find out more about Probe Mines Limited, visit our website at www.probemines.com, or contact:

David Palmer
President
Tel: (416) 777-6703

Karen Willoughby
Investor Relations
Tel: (866) 936-6766

Forward-Looking Statements

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This News Release includes certain "forward-looking statements". These statements are based on information currently available to the Company and the Company provides no assurance that actual results will meet management's expectations. Forward-looking statements include estimates and statements that describe the Company's future plans, objectives or goals, including words to the effect that the Company or management expects a stated condition or result to occur. Forward-looking statements may be identified by such terms as "believes", "anticipates", "expects", "estimates", "may", "could", "would", "will", or "plan". Since forward-looking statements are based on assumptions and address future events and conditions, by their very nature they involve inherent risks and uncertainties. Actual results relating to, among other things, results of exploration, project development, reclamation and capital costs of the Company's mineral properties, and the Company's financial condition and prospects, could differ materially from those currently anticipated in such statements for many reasons such as: changes in general economic conditions and conditions in the financial markets; changes in demand and prices for minerals; litigation, legislative, environmental and other judicial, regulatory, political and competitive developments; technological and operational difficulties encountered in connection with the activities of the Company; and other matters discussed in this news release. This list is not exhaustive of the factors that may affect any of the Company's forward-looking statements. These and other factors should be considered carefully and readers should not place undue reliance on the Company's forward-looking statements. The Company does not undertake to update any forward-looking statement that may be made from time to time by the Company or on its behalf, except in accordance with applicable securities laws.

Copyright � 2012 PROBE MINES LIMITED (PRB) All rights reserved. For more information visit our website at http://www.probemines.com/ or send email to info@probemines.com ..
Message sent on Mon Jan 30, 2012 at 12:24:54 PM Pacific Time

Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Probe Mines est une société d’exploration minière d'argent et d'or basée au Canada.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de
2009 Annual Report
Financements de
28/05/2013Announces Closing of $15.0 Million Bought Deal Brokered Priv...
25/10/2011Announces C$5 Million Bought Deal Financing
08/06/2010Announces Closing of $1,000,000 Non-Brokered Private Placeme...
27/04/2010Announces $1,000,000 Non-Brokered Private Placement with Min...
03/02/2010Announces Closing of $250,000 Non-Brokered Private Placement
12/02/2008Closes $2,000,000 Non-Brokered Private Placement
05/02/2008 Announces $2,000,000 Non-Brokered Private Placement with th...
06/11/2007Announces Closing of $3,500,000 Non-Brokered Private Placeme...
26/10/2007Announces Increase in Size of Non-Brokered Private Placement
22/10/2007Announces $3,000,000 Non-Brokered Private Placement to Explo...
Nominations de
10/04/2013Appoints Michael Petrina as Chief Operating Officer
09/10/2012Appoints Patrick Langlois as VP Corporate Development
28/01/2008Appoints Carmelo Marrelli as Chief Financial Officer
03/12/2007 Announces Appointment of Dennis H.Peterson to the Board of ...
15/11/2007Announces Appointment of Dr. John B. Gammon to the Board of ...
Projets de
21/01/2015Goldcorp acquires additional interest in Probe from Agnico E...
21/02/2013Announces High Grade Intercepts
15/01/2013Announces Updated Resource Estimate for the Borden Gold Zone...
07/01/2013Announces Further Property Acquisition in the Area of its Bo...
12/12/2012(Borden Lake)Announces Additional Assay Results for its Borden Lake Gold ...
07/11/2012Announces Acquisition of Ava-Claire Property, Chapleau Area,...
02/04/2012(Borden Lake)Announces Significant Improvement and Expansion of the Borde...
20/03/2012(Borden Lake)Announces Additional Assay Results for its Borden Lake Gold ...
15/03/2012(Borden Lake)to Option Reliant Gold Corp's Borden Lake South Project
13/03/2012(Borden Lake)Announces Additional Assay Results for its Borden Lake Gold ...
28/11/2011(Borden Lake)Announces Positive Preliminary Metallurgical Results for its...
07/09/2011(Borden Lake)Announces Memorandum of Understanding With Brunswick House, ...
23/08/2011(Borden Lake)Announces Initial Resource Estimate for its Borden Lake Gold...
10/08/2011(Borden Lake)Announces Additional Assay Results for its Borden Lake Gold ...
25/07/2011(Borden Lake)Receives Preliminary Geophysical Results for a New Target at...
06/07/2011(Borden Lake)Announces Commencement of Ground Geophysical Surveys at its ...
26/05/2011(Borden Lake)Announces Commencement of Drilling on the Lake Shore Gold Jo...
01/04/2011(Borden Lake)Announces Further Assay Results for its Borden Lake Project ...
03/03/2011(Borden Lake)Acquires Additional Property on Its Borden Lake Project Near...
19/05/2010(Mcfauld's Lake - Probe)Provides Update on McFauld's Lake Exploration
18/05/2010(Mcfauld's Lake - Probe)Commences 43-101 Resource Estimate on Black Creek Chromite Z...
13/04/2010(Mcfauld's Lake - Probe)Provides Exploration Update for Its McFauld's Lake Projects;...
24/11/2009(Mcfauld's Lake - Probe)Phase II Drilling Results Yield More High-Grade Chromite for...
16/09/2009(Bristol Township)Announces Commencement of Drilling on its West Timmins Gold ...
26/08/2009(Mcfauld's Lake - Probe)Intersects High-Grade Chromite in the New Black Creek Chromi...
29/07/2009(Bristol Township)West Timmins Mining to Continue Option on Probe Mines' Brist...
28/07/2009(Mcfauld's Lake - Probe)Provides Update on McFaulds Lake Drilling, Massive Chromite ...
23/06/2009(Mcfauld's Lake - Probe)to Commence Drilling on McFauld's Lake Properties
02/06/2009(Mcfauld's Lake - Probe)Technical Updates on Victory and Tamarack Projects, McFauld'...
20/05/2009(Mcfauld's Lake - Probe)Enters into Joint Venture Agreement with Noront Resources in...
01/10/2008(Mcfauld's Lake - Probe)Receives Assays Results for McFauld's West Drilling Program
02/09/2008(Mcfauld's Lake - Canstar/probe)Updates on its McFauld's Lake Area Properties
05/08/2008 Intersects Peridotite on McFauld's West
26/06/2008(Mcfauld's Lake - Probe)Intersects Ultramafic Intrusive on Victory Project
23/04/2008(Mcfauld's Lake - Probe)Completes AeroTEM III Airborne Geophysical Survey
01/04/2008(Mcfauld's Lake - Probe)Discovers Mafic Intrusive Outcrop on McFauld's West Property
20/02/2008(Mcfauld's Lake - Probe)McFauld's West Project Update
30/01/2008(Mcfauld's Lake - Probe)COMMENCES FIELDWORK ON ITS MCFAULD'S WEST PROJECT JAMES BAY ...
10/12/2007(Mcfauld's Lake - Probe)Commences Fieldwork on PROBE MINES' Tamarack Property
06/12/2007(Mcfauld's Lake - Probe)Completes High Resolution Airborne Survey on the McFauld's ...
Communiqués de Presse de
17/03/2015Probe Metals Inc. Commences Trading on the TSX Venture Excha...
16/03/2015S&P Dow Jones Indices Announces Changes to the S&P/TSX Canad...
13/03/2015Goldcorp Completes Acquisition of Probe Mines
11/03/2015Shareholders Approve Plan of Arrangement
11/03/2015Probe Mines Shareholders Approve Plan of Arrangement
27/02/2015Leading Independent Advisory Firms ISS And Glass Lewis Recom...
27/02/2015Leading Independent Advisory Firms ISS and Glass Lewis Recom...
09/02/2015Tahoe Resources to buy Rio Alto Mining for $1.12 bln
27/01/2015Goldcorp Completes Acquisition of Additional Interest in Pro...
19/01/2015Probe Mines to be Acquired by Goldcorp
19/01/2015Goldcorp to buy Probe Mines for about $440 million
19/01/2015Goldcorp expands Porcupine district with acquisition of Prob...
19/01/2015Probe Mines to be Acquired by Goldcorp
18/12/2014Probe Mines Announces Grant of Options
18/12/2014Probe Mines Announces Grant of Options
10/12/2014Probe Mines Consolidates 100% Ownership of the Borden Gold D...
10/12/2014Probe Mines Consolidates 100% Ownership of the Borden Gold D...
09/12/2014Probe Mines President & CEO, Dr. David Palmer,Honoured with ...
09/12/2014Probe Mines President & CEO, Dr. David Palmer, Honoured with...
03/11/2014Probe Mines Limited Announces Results of Shareholder Meeting
16/09/2014Probe Mines Appoints Jamie Sokalsky as Director and Chairman...
03/09/2014Probe Mines Adds John Haflidson as Senior Mining Advisor
06/08/2014Probe Mines Completes $26 Million Flow-Through Private Place...
25/07/2014Probe Mines Files NI 43-101 Technical Report for the Borden ...
15/07/2014Probe Mines to Complete $26 Million Flow-Through Private Pla...
07/07/2014Probe Mines Announces High-Grade Infill Drilling Results at ...
18/02/2014Announces High-Grade Infill Drill Intercepts, including 7.0 ...
10/02/2014Announces Drill Intercept of 16.3 g/t Gold Over 39 Metres at...
07/01/2014Reports Additional High-Grade Gold Intersections on its Bord...
21/11/2013Announces Excellent Metallurgical Recoveries
08/11/2013Honoured with Ontario Prospectors Association 2013 Ontario P...
15/10/2013Continues to Intersect High-Grade Gold on its Borden Gold Pr...
19/09/2013Announces Annual and Special Shareholder Meeting; Nominates ...
21/08/2013Announces Continued High-Grade Assay Results for its Borden ...
14/08/2013Continues to Define High-Grade Gold Zone on its Borden Gold ...
18/06/2013Continues to Intersect High-Grade Gold on its Borden Gold Pr...
24/05/2013Enters Into Underwriting Agreement and Announces Investment ...
10/05/2013Announces $15.0 Million Bought Deal Brokered Private Placeme...
25/04/2013Announces Update on Metallurgical Program for its Borden Gol...
09/04/2013Drills 500-Metre High-Grade Step-Out Holes at Borden Gold Pr...
08/01/2013Announces Additional Assay Results for its Borden Gold Proje...
26/09/2012to Attend the Toronto Resource Investment Conference Septemb...
18/09/2012(Borden Lake)Announces Additional Assay Results for its Borden Lake Gold ...
18/09/2012(Borden Lake)Announces Additional Assay Results for Its Borden Lake Gold ...
31/07/2012(Borden Lake)Announces Additional Assay Results for its Borden Lake Gold ...
07/06/2012(Borden Lake)Appoints Gordon McCreary to its Board of Directors and Retai...
05/06/2012(Borden Lake)Announces Additional Assay Results for its Borden Lake Gold ...
30/01/2012(Borden Lake)Announces Additional Assay Results for its Borden Lake Gold ...
06/12/2011(Borden Lake)Announces Additional Assay Results for its Borden Lake Gold ...
19/09/2011(Borden Lake)Announces Additional Assay Results for its Borden Lake Gold ...
09/08/2011(Borden Lake)Commences Metallurgical Testwork at Borden Lake
21/07/2011(Borden Lake)Announces Additional Assay Results for its Borden Lake Gold ...
22/06/2011Announces Assay Results for the Cree Lake Gold Project, Sway...
07/06/2011(Borden Lake)Announces Assay Results for its Borden Lake Gold Project nea...
21/04/2011Announces Closing of Brokered Private Placement Raising C$25...
04/04/2011ANNOUNCES PRICING AND UPSIZES BROKERED PRIVATE PLACEMENT TO ...
28/03/2011ANNOUNCES PRIVATE PLACEMENT FOR UP TO C$15,000,000
15/03/2011(Borden Lake)Announces Assay Results for its Borden Lake Project near Cha...
10/08/2010to Acquire 100% interest in Black Creek Chromite Deposit and...
15/06/2010to Begin Summer Drilling Operations
08/06/2010Provides Exploration Update
26/04/2010to Acquire the Borden Lake Gold Project, Chapleau, Ontario
21/04/2010to Option the Cree Lake Gold Project, Swayze Belt, Ontario f...
21/10/2009Completes Phase II Drilling on its Black Creek Chromite Disc...
22/09/2009Commences Phase II Drilling on its Black Creek Chromite Disc...
26/05/2009Identifies 800m-long Airborne Anomaly on the Probe-Noront Jo...
20/11/2008Corporate and Exploration Updates
07/08/2008CEO Interview
08/07/2008Commences First-Phase Drilling on its McFauld's West Propert...
03/06/2008Announces Discussions With Noront Resources Inc. and Mobiliz...
01/04/2008President & CEO David Palmer on the AOL Small Cap Show
14/01/2008IDENTIFIES SIGNIFICANT NI-CU-AG-CO SOIL GEOCHEMICAL ANOMALIE...
29/08/2007Reports on Property Adjacent to Noront's Copper Discovery in...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
Cours préc. Ouverture
Bas haut
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  - -
Volume var. 1 mois
-
Produit
Développe
Recherche
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2024
202321,26%1,671,28
2022-33,85%2,331,09
202112,94%2,151,26
202049,12%1,950,54
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
6,69 AU$-0,15%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 +100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
8,39 US$+3,84%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,61 GBX+3,40%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,11 +1,44%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 +0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
13,51 +4,00%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,30 +7,14%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 +2,56%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
2,22 +2,30%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
39,36 US$+0,64%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,10 AU$-4,55%Trend Power :
Sun Res.(Oil)SUR.AX
Released ASX Announcement: Quarterly Activities Report
0,00 AU$+0,00%Trend Power :
Profitez de la hausse des actions aurifères
  • Inscrivez-vous à notre market briefing minier
    hebdomadaire
  • Recevez nos rapports sur les sociétés qui nous semblent
    présenter les meilleurs potentiels
  • Abonnement GRATUIT, aucune sollicitation
  • Offre limitée, inscrivez-vous maintenant !
Accédez directement au site.