Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
Cours Or & Argent

VanEck Vectors Global Alternative Energy ETF

Publié le 17 juin 2008

Announces Central Tunnel Drill Results - Bjorkdal, Sweden Evaluating Bulk Mining Methods

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter

Re:        News Release - Tuesday, June 17, 2008
Title:     Gold-Ore Announces Central Tunnel Drill Results - Bjorkdal, Sweden Evaluating Bulk Mining Methods

Gold-Ore Resources Ltd. (the "Company") is pleased to provide infill drill results from recent underground drilling in the Central Tunnel at the Bjorkdal Gold Mine in Sweden. During 2007 and 2008 a total of 4,760 metres in 54 holes was drilled from the Central Tunnel. A 43-101 compliant resource calculation released on March 12, 2008 only incorporated a minor amount of the mineralization at the Central Tunnel due to the lack of infill drilling. The next resource calculation will better reflect the potential of the area.

Drilling commenced in 2008 with one rig on April 14 and 32 holes totalling 2,000 metres have been completed to-date. Of these, the first 15 were drilled from the Central Tunnel and the results are shown in the tables below. The drill has since moved to the Eastern Tunnel.

The results in Table 1 reflect a narrow vein mining plan with an average minimum stope width of 3 metres. Table 2 presents the results accommodating wider stopes or a possible underground bulk method of mining. A mining plan for this area is currently being designed.

Table 1. Central Tunnel Drill Results -- minimum 3 metre stope width

Hole
Number

Section

Azimuth

Dip

From
(m)

To
(m)

Interval
(m)

True
Width (m)

Au Grade
(g/t)

2008-001

225W

150

12

1.0
33.2
48.0

5.0
35.7
50.0

4.0
2.5
2.0

3.9
2.4
2.0

11.92
17.32
13.05

2008-003

225W

330

-18

2.2
17.2
26.4

7.2
22.3
30.5

5.0
5.1
4.1

4.8
4.9
3.9

6.87
5.98
7.97

2008-004

225W

330

-50

3.0
12.9

7.0
15.9

4.0
3.0

2.6
1.9

10.37
3.16

2008-006

195W

150

0

49.0

51.1

2.1

2.1

15.67

2008-007

195W

330

-18

8.9
23.0
33.7

19.0
25.0
36.0

10.1
2.0
2.3

9.6
1.9
2.2

7.83
10.75
4.52

2008-008

165W

330

-45

13.5

16.5

3.0

2.1

2.95

2008-010

165W

150

15

24.0
35.7
45.0
59.2

26.7
37.8
49.1
64.0

2.7
2.1
4.1
4.8

2.6
2.0
4.0
4.6

3.47
11.05
6.96
2.41

2008-012

135W

330

-15

58.9

62.6

3.7

3.6

4.49

2008-014

135W

150

12

63.9
82.2

66.5
85.0

2.6
2.8

2.5
2.7

2.54
5.95

Table 2. Central Tunnel Drill Results -- bulk mining averages

Hole
Number

Section

Azimuth

Dip

From
(m)

To
(m)

Interval
(m)

True
Width (m)

Au Grade
(g/t)

2008-001

225W

150

12

25.5

35.7

10.2

10.0

4.70

2008-002

225W

150

-45

13.5

23.5

10.0

7.1

0.99

2008-003

225W

330

-18

17.2

30.5

13.3

12.6

4.80

2008-004

225W

330

-50

3.0

14.9

11.9

7.6

4.29

2008-006

195W

150

0

44.0

51.1

7.1

7.1

4.89

2008-007

195W

330

-18

8.9

36.0

27.1

25.8

4.20

2008-010

165W

150

15

35.7

49.1

13.4

12.9

3.88

2008-012

135W

330

-15

58.9

73.0

14.1

13.6

2.10


Sample Protocol and Chain of Custody

In order to minimize the effects of the coarse, nugget gold at Bjorkdal, the Company has elected to submit 100% of the core for analysis, thus not retaining half core for archive. This provides a much larger sample for gold analysis and theoretically a more representative result. Historically, the Company has used this practice on 22% of previous drilling and there are over 20,000 metres of core archived on the property. The core is logged and photographed, and then the entire core is shipped to ALS Chemex for gold analysis. A rigorous QA/QC program is employed that involves the insertion of blanks, certified standards and field and lab duplicates.

Bjorkdal Gold Production

The Bjorkdal gold concentrating plant continues to operate at the full capacity of 3,400 tonnes/day or 100,000 tonnes/month. Gold production for May reached an annualized level of 29,200 ounces, which represents a 52% increase over 2007 production.

A scheduled maintenance shutdown in June will reduce the monthly throughput by 5,000 to 10,000 tonnes. July production from underground only will be reduced due to scheduled vacation by the contract mining crew. Gold production during July will be from open pit material and surface stockpiles.

Gold-Ore Resources is a mineral exploration development company with operations currently focussed in the country of Sweden. In addition to the Bjorkdal gold mine, the Company also has two other exploration concessions in the country, the Ronnberget Property (adjacent to Bjorkdal) and the Vallberget Property, and the recently acquired development project, the Norrliden deposit.

For more information please contact Glen Dickson, Ron Ewing or Bob Wasylyshyn at (604) 687-8884. Bjorkdal property information is posted on the Company's web site at www.goldoreresources.com. Robert S. Wasylyshyn; P. Geo. is the Company's Qualified Person for the Bjorkdal Project.



Robert S. Wasylyshyn, P. Geo
President




The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release. This news release may contain forward-looking statements including but not limited to comments regarding the timing and content of upcoming work programs, geological interpretations, receipt of property titles, potential mineral recovery processes, etc. Forward-looking statements address future events and conditions and therefore, involve inherent risks and uncertainties. Actual results may differ materially from those currently anticipated in such statements.



Copyright � 2008 GOLD ORE RESOURCES LTD. (GOZ) All rights reserved. For more information visit our website at http://www.goldoreresources.com/ or send email to info@goldore.ca  ..

VanEck Vectors Global Alternative Energy ETF

PRODUCTEUR
CODE : GOZ.TO
ISIN : CA3809811001
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Gold-Ore Res. est une société de production minière d'or basée au Canada.

Gold-Ore Res. est en développement de projets d'or, d'argent, de cuivre, de plomb et de zinc en Suede, et détient divers projets d'exploration en Suede.

Son principal projet en production est BJÖRKDAL en Suede, son principal projet en développement est NORRLIDEN en Suede et ses principaux projets en exploration sont VALLBERGET et RONNBERGET en Suede.

Gold-Ore Res. est cotée au Canada. Sa capitalisation boursière aujourd'hui est 38,4 millions (37,4 millions US$, 28,4 millions €).

La valeur de son action a atteint son plus bas niveau récent le 23 novembre 2001 à 0,04 , et son plus haut niveau récent le 31 décembre 2010 à 1,14 .

Gold-Ore Res. possède 47 442 200 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de VanEck Vectors Global Alternative Energy ETF
2007 Annual Report
Financements de VanEck Vectors Global Alternative Energy ETF
14/07/2008Closes Private Placement
18/06/2008Announces a Non-Brokered Private Placement for up to $3,000,...
Attributions d'options de VanEck Vectors Global Alternative Energy ETF
14/01/2008Appointment of Vice President-Mining, Granting of Stock Opti...
Nominations de VanEck Vectors Global Alternative Energy ETF
19/04/2011Announces Appointment of New CFO
01/04/2010Appoints Financial Advisor
10/04/2008Appointment of Vice President -- Corporate Affairs
Rapports Financiers de VanEck Vectors Global Alternative Energy ETF
14/10/2011Announces Record Earnings for Third Quarter 2011
14/07/2011Announces Earnings of C$3.0 million in Second Quarter, 2011
18/04/2011Announces Earnings of C$1.0 million in First Quarter, 2011
01/03/2011Announces Earnings of C$6.7 million in 2010
13/07/2010Reports Strong Earnings in Second Quarter, 2010
17/06/2010(Björkdal)Reports Record Gold Production in Second Quarter
17/03/2010(Björkdal)First Quarter Operational Results
08/03/2010009 & Fourth Quarter Financial Results
09/03/2009Announces Bjorkdal First Quarter Operational Results
06/05/2008Reports Operational Results for the First Quarter of 2008
Projets de VanEck Vectors Global Alternative Energy ETF
01/05/2012Elgin Mining and Gold-Ore Resources Announce Results of Shar...
12/04/2012Drills a Significant Extension to the Bjorkdal Gold Mine
09/06/2011(Björkdal)Announces Increased Gold Production in Second Quarter
29/05/2011(Björkdal)Releases Underground Drill Results at Bjorkdal Gold Mine
16/05/2011(Björkdal)Provides Exploration Update
15/03/2011Announces First Quarter Gold Production and 2011 Production ...
13/08/2010(Björkdal)Provides Update On Underground Mining
28/07/2010(Björkdal)Commences Surface Exploration Drilling
29/06/2010(Björkdal)Continues to Extend Mine Life
20/05/2010(Björkdal)Exploration Plans
25/01/2010(Björkdal)Reports Underground Drill Results at Bjorkdal
09/12/2009Fourth Quarter and 2009 Year End Production Results
09/11/2009(Björkdal)Reports Underground Drill Results & Future Drill Plans at Bj...
08/09/2009(Björkdal)Bjorkdal Gold Mine - Underground Drill Results
04/02/2009(Björkdal)Announces Expansion Plans at Bjorkdal Gold Mine
04/02/2009(Björkdal)Gold-Ore Announces Expansion Plans at Bjorkdal Gold Mine
14/01/2009(Björkdal)Announces December Gold Production at Bjorkdal
12/11/2008(Björkdal)Continues to Increase Gold Production at Bjorkdal
17/06/2008(Björkdal)Announces Central Tunnel Drill Results - Bjorkdal, Sweden Ev...
09/04/2008(Björkdal)Bjorkdal Gold Mine, Sweden -- Project Update
12/03/2008(Björkdal)Increase At Bjorkdal Mine, Sweden
10/01/2008(Björkdal)Project Update and 2008 Plans
02/01/2008(Björkdal)Bjorkdal Gold Mine - Purchase Closes
01/10/2007(Björkdal)Swedish Property Acquisition
24/09/2007(Björkdal)Bjorkdal Gold Mine - Central Tunnel Drill Results
17/07/2007(Björkdal)Bjorkdal Gold Mine -- Underground Drill Results
18/06/2007(Björkdal)Independent Feasibility Study at Bjorkdal Gold Mine Underway
08/05/2007(Björkdal)Commencement of Test Mining at Bjorkdal Gold Mine
26/04/2007(Björkdal)Bjorkdal Gold Mine - Additional Drill Results
Communiqués de Presse de VanEck Vectors Global Alternative Energy ETF
10/04/2012Elgin Mining and Gold-Ore Resources Announce Shareholder Mee...
27/03/2012Announces Significant Increase in Proven & Probable Reserve ...
13/03/2012Announces First Quarter Gold Production
05/03/2012Reports Increase in Gold Resource Estimates at Bjorkdal Gold...
27/02/2012Announces Earnings of C$12.3 million in 2011
01/02/2012Elgin Mining and Gold-Ore Resources Announce Merger Creating...
17/12/2011Astur Gold And Gold-Ore Resources Announce $150 Million Merg...
14/12/2011Reports 2011 Year-End and Fourth Quarter Production Results ...
14/09/2011Announces Third Quarter Gold Production
13/07/2010Contracts Windward Agency
17/05/2010Begins Trading on TSX Senior Board
10/05/2010Lists on TSX Senior Board
31/10/20093RD Quarter Financial Statements
19/02/2009Email To Shareholders
07/01/2009Announces Positive Tellurium Metallurgical Studies
15/05/2008Acquires Norrliden Poly-metallic Deposit
19/11/2007Bjorkdal Gold Mine - Exercise of Option to Purchase
08/11/2007Vallberget Property Acquisition - Bergslagen District, Swede...
31/10/2007 3rd Quarter Report for the period ending August 31, 2007
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (GOZ.TO)
0,810+0.00%
TORONTO
CA$ 0,810
03/05 15:59 -
0%
Cours préc. Ouverture
0,810 0,820
Bas haut
0,800 0,830
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,810 -%
Volume var. 1 mois
87 500 -%
24hGold TrendPower© : 8
Produit Gold
Développe Copper - Gold - Lead - Silver - Zinc
Recherche Copper - Gold - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 23/10/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
6,69 AU$-0,15%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 +100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
8,25 US$+2,10%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,61 GBX+3,40%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,08 +0,00%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 +0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
13,00 +0,12%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,30 +7,14%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 +2,56%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
2,20 +1,38%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
39,02 US$-0,23%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,10 AU$-4,55%Trend Power :
Sun Res.(Oil)SUR.AX
Released ASX Announcement: Quarterly Activities Report
0,00 AU$+0,00%Trend Power :
Profitez de la hausse des actions aurifères
  • Inscrivez-vous à notre market briefing minier
    hebdomadaire
  • Recevez nos rapports sur les sociétés qui nous semblent
    présenter les meilleurs potentiels
  • Abonnement GRATUIT, aucune sollicitation
  • Offre limitée, inscrivez-vous maintenant !
Accédez directement au site.