Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
Cours Or & Argent

VanEck Vectors Global Alternative Energy ETF

Publié le 21 octobre 2013

Announces Positive La Joya Preliminary Economic Assessment Base Case Pre-Tax NPV(5%) of US$133 Mill

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Bismuth | Canada | Copper | Dollar | G Mexico | Precious Metals | Report | Zinc |

SilverCrest Announces Positive La Joya Preliminary Economic Assessment
Base Case Pre-Tax NPV(5%) of US$133 Million and 30% IRR for �Starter Pit�

Dear Charlotte Boivin <.COM>,

VANCOUVER, BC - October 21, 2013 - SilverCrest Mines Inc. (�SilverCrest� or the �Company�) is pleased to announce that it has completed the Preliminary Economic Assessment (�PEA�) for its La Joya Silver Copper Gold Project (�La Joya�) located in Durango, Mexico. Summaries of the current resources used for the PEA, a preliminary Life of Mine Plan (LOMP), operating costs, capital costs and project economics are presented in tables below. A Technical Report compliant with NI43-101 is being completed by EBA Engineering Consultants, a Tetra Tech Company (EBA) with an effective date of September 23, 2013 to be filed within 45 days of this release. All currency values are presented in US$ unless otherwise specified.

N. Eric Fier, President & COO stated, "The positive results of this PEA will enable us to plan the next steps, establish achievable milestones and identify additional studies and analyses to optimize the project economics. We have engaged extensively with local communities at this early stage of the La Joya project development, emphasizing the importance of building collaborative, long term and sustainable relationships with all stakeholders�.

The PEA focuses on the first stage of La Joya development (�Starter Pit�) as a low strip, open pit with an initial 9 year life of mine plan (�LOMP�) and opportunities for expansion. This approach provides attractive economic returns using conservative metal price estimates and lower initial capital costs, which are more attractive in the current market.  The conceptual open pit operation would be in conjunction with a 5,000 tonnes per day (tpd) conventional mill and flotation/leaching plant to produce a high grade silver-copper concentrate with gold credits. The Starter Pit will have a conceptual average annual production of 3.9 million silver equivalent (AgEQ)* ounces per year and approximately 5 million ounces AgEQ* per year for each of the first 4 years of operation. An expansion of the Starter Pit to include additional resources within a larger pit would then be contemplated.

The Company cautions that the PEA is preliminary in nature in that it is based on Inferred Mineral Resources which are considered too speculative geologically to have the economic considerations applied to them that would enable them to be characterized as mineral reserves, and there is no certainty that the PEA will be realized. Mineral resources that are not mineral reserves do not have demonstrated economic viability.

HIGHLIGHTS OF THE PRELIMINARY ECONOMIC ASSESSMENT

The PEA incorporated Base Case metal prices of $22/oz Ag, $3/lb Cu and $1200/oz Au (5 year historical average). Highlights of the Base Case economic estimates for the Starter Pit are as follows:

  • Pre-tax NPV5% of $133 million and an Internal Rate of Return (�IRR�) of 30.5%
  • Pre-tax NPV5% of $156 million and IRR of 34% using current metal prices of $21.93/oz Ag,  $1316.25/oz Au and $3.27/lb Cu (as of 18/10/2013)
  • After-tax NPV5% of $93 million and an IRR of 22%
  • Payback period of approximately 2 years on initial capital
  • Pre- production capital costs of $141 million including contingencies of $17 million
  • Sustaining capital is estimated at $8 Million
  • Cash operating costs for the first three years average $10 per ounce AgEQ* and $13 per ounce AgEq* for the  9 years Starter Pit
  • Pre-tax undiscounted  operating cash flow before  capital expenditures totalling $342.5 million at an average of $38 million per year with the first four years averaging $60 million per year
  • A 9 year LOMP with 15.5M tonnes grading 50g/t Ag, 0.33%Cu and 0.19 g/t Au
  • Life of mine production of an estimated 34.8 million payable AgEQ*ounces, consisting of 19 million ounces of silver and 53 thousand ounces of gold and 93 million pounds of copper in concentrate, and
  • Production of an attractive high grade silver-copper concentrate (averaging 35% Cu and 4kg/t Ag) with a gold by-product.

* Silver equivalency for the PEA includes silver, gold and copper and excludes lead, zinc, molybdenum and tungsten values. The Price Ratio for  Ag:oz Au is (54.4:1), lb Cu:oz Ag is (7.3:1), both  based on 5 year historic metal price trends of US$22/oz silver, US$1200/oz gold, US$3/lbs. copper. Metallurgical recoveries are incorporated in the economic analysis (see Summary of PEA parameters in table below).

PEA ECONOMIC ANALYSIS

* Silver equivalency for the PEA includes silver, gold and copper and excludes lead, zinc, molybdenum and tungsten values. Price ratio for Ag: Au is (54.4:1), Ag:Cu is  (7.3:1), both  based on 5 year historic metal price trends of US$22/oz silver, US$1200/oz gold, US$3/lbs. copper. Metallurgical recovery is incorporated as recoverable metal.

The PEA for the Starter Pit reports strong revenues in the initial four years of operations and a decrease in the revenues for subsequent two years due to decrease in the grades. It is anticipated that additional drilling and optimization of the mine schedule could improve these results based on the presence of high grade material in some sectors of the deposit which may ultimately be incorporated into the mine plan.
Sensitivity analyses were completed by adjusting commodity prices, the results of which are presented in the following graph.

The Starter Pit economics are more sensitive to silver and copper price, as they represent 55% and 36% of the total revenues respectively under the base case scenario. Each 10% increment in metal prices from the base case changes the pre-tax NPV by approximately $60 million and the IRR by approximately 8%.

PEA CAPITAL COSTS

EBA completed detailed cost estimates for the mine and processing plant based on preliminary vendor quotes, contract mining and similar projects recently completed in Mexico. Pre-production capital costs are estimated to total US$141 million including a $17 million contingency using an open pit mine contractor. This includes development of the project over a period of 1.5 years including initial mining for one year before start-up of operations. The La Joya property has excellent infrastructure to keep capital costs reasonable with a nearby international airport, highways, railway, main power grid and lines, several operating mines and communities with available workforce. The pre-production capital costs from the PEA are summarized below.

Pre Production Capital Costs (US$000) LOMP Total Year -2 Year -1
Overall Site $17,915   $17,915
Pre Stripping $6,700 $2,010 $4,690
Ore Handling $9,095 $2,728 $6,366
Process Plant $44,992 $13,497 $31,494
Tailings and Water Management $6,850   $6,850
On-Site Infrastructure-Environmental $9,116 $2,731 $6,385
Total direct $94,666 $20,967 $73,699
Indirect $24,825 $7,447 $17,377
Owners costs $4,733 $1,420 $3,313
Subtotal $29,558 $8,867 $20,691
Contingency $16,966 $5,090 $11,876
Totals $141,190 $34,924 $106,266
Sustaining Capital $8,128    

Provisions for $8 million of working capital and $6 million in mine closure have been made as part of the economic analyses in the PEA.

PEA STUDY PARAMETERS

The PEA has incorporated the following operational and economic parameters used in the Net Smelter Return Model (�NSR�) for the silver-copper-gold concentrate and also gold-silver dore production model from tailings leaching.

SUMMARY LA JOYA PEA PARAMETERS
Exchange Rate
USD/MXN $13.00
USD/CAD $0.97
Metallurgical Recoveries (%)
Silver recovery - Manto concentrate 76%
Silver recovery - Manto dore 7%
Silver recovery - Structure concentrate 76%
Silver recovery - Structure dore 7%
Gold recovery -Manto concentrate 55%
Gold recovery -Manto dore 5%
Gold recovery -Structure concentrate 45%
Gold recovery -Structure dore 10%
Copper recovery - Manto concentrate 86%
Copper recovery - Structure concentrate 84%
Copper Grade Concentrate (%) 35%
Item Cost US$
Total Mining Ore cost US$/t $2.16
Processing cost US$/t $13.85
G & A US$/t $1.81
Road freight US$/t copper concentrate $50.00
Ocean freight US$/t copper concentrate $65.00
Marketing US$/t copper concentrate $2.50
Smelting US$/t copper concentrate $70.00
Concentrate refining costs Ag US$/troz oz $0.60
Concentrate refining costs Cu US$/lbs $0.07
Gold Dore refining costs US$/troy oz $10.00
Dore transportation US$/troy oz $1.00
Fuel Costs US$/litre $0.81
Deductions (%)
Insurance % (copper in concentrate) 0.15%
Copper In Concentrate 1%
Gold Dore-Copper Concentrate 3%
Silver Dore 7%
Concentrate losses (%) 0.42%
Moisture Copper Concentrate (%) 8.50%
Conversion factors  
Grams per troy ounce 31.1
Lbs. copper per tonne 2204

No smelter penalty charges for deleterious metals were applied to the concentrate for the PEA. The study assumes that silver copper concentrate will be shipped overseas by trucking from site to a port in Mexico which is the most used route for concentrate producers in operation near La Joya..

PROCESSING & METALLURGY

The most recent metallurgical studies indicate that a conventional flotation circuit will potentially recover a high grade silver copper concentrate with gold credits.  Depending on mineralization style and conditioning applied on the ALS locked cycle flotation tests, preliminary metal recoveries to the third cleaner concentrates range from 82.7 to 86.7% Cu, 76.7 to 84.3% Ag, and 18.2 to 42.4% Au for Manto and Structure composites. A gold leaching circuit with potential to recover 90% of gold and silver from the tailings to produce metal dore has also been incorporated in the PEA.

   3RD CLEANER CONCENTRATE  (Excluding Leaching)
COMPOSITE
ORE TYPE
HEAD ASSAY ASSAY RECOVERY(%)
Cu% Ag g/t Au g/t Cu% Ag g/t Au g/t Cu Ag Au
Manto 0.35 47 0.19 36.6 4460 12.9 86 77 55
Structure 0.46 64 0.27 33.7 4300 9.61 84 77 40

The bulk silver copper concentrates from preliminary results produced from Manto and Structure composites show certain potentially deleterious elements for smelting such as arsenic, antimony and bismuth. Adding cyanide at cleaner flotation stages reduces the arsenic content to acceptable market limits without sacrificing copper, silver and gold recoveries. Additional test work is in progress to assess the distribution, concentration and potential reduction of antimony and bismuth.

LA JOYA RESOURCES

The La Joya mineral deposit is defined as a silver copper- gold skarn with disseminated to semi-massive sulphide (bornite �chalcopyrite) with three main ore types; Mantos, Structures and Contact Zone. The updated Mineral Resource estimations for the La Joya Project provided estimated Inferred Resources of 126.7 million tonnes grading 23.5 gpt Ag, 0.19%Cu and 0..17 gpt Au containing 198.6 million ounces of silver, 533 million pounds of copper and 95,900 ounces of gold. These resource estimates were announced by news release dated January 29, 2013 and are contained in a technical report dated March 27, 2013 titled �Updated Resource Estimate for the La Joya Property, Durango, Mexico and are the basis for the PEA.

Ag Eq
Cut Off g/t
Tonnage
(000)
Ag
gpt
Cu% Au
gpt
Ag Eq
gpt
Ag Oz
(000)
Au Oz
(000)
Cu Lbs
(000)
Ag Eq* Oz
(000)
15 126,700 23.5 0.19 0.17 48.7 95900 716.2 533.2 198.6
30 71,200 34.4 0.28 0.22 69.8 78700 524.8 436.8 159.8
60 27,900 57.5 0.48 0.28 112.2 51600 258.8 288.4 100.8

 *Silver equivalency for the resource estimation filed on March 27th, 2013 includes silver, gold and copper and excludes lead, zinc, molybdenum and tungsten values. Ag:Au is 50:1, Ag:Cu is 86:1, based on 5 year historic metal price trends ofUS$24/oz silver, US$1200/oz gold, US$3/lb copper. 100% metallurgical recovery is assumed. Classified by EBA, a Tetra Tech Company and conforms to NI 43-101 and CIM definitions for resources. All numbers are rounded. Inferred Resources have been estimated from geological evidence and limited sampling and must be treated with a lower level of confidence than Measured and Indicated Resources. Note that AgEQ calculation for resources is different than PEA economic analysis based on change in metal prices. Mineralization boundaries used in the interpretation of the geological model and resource estimate are based on a cut-off grade of 15 g/t AgEq using the metal price ratios described above.

The conceptual first stage for development of La Joya with an initial 9 year Starter Pit uses the 60g/t Ag Eq cut off Inferred Resource for Manto and Structure Zones representing mineralized zones close to the surface.. The PEA conceptual open pit and economic analysis excludes the Contact Zone, Santo Nino and Cerro Coloradito resources which are included in the above table.

The Contact Zone resources, not incorporated in the PEA, contains consistent Tungsten mineralization which is currently the subject of additional studies aimed at definition of preliminary economic parameters to be integrated in future assessment of  the La Joya Project.

PEA POTENTIAL PRODUCTION

The Whittle Pit analysis examined the NPV of 41 potential pits utilizing a 5,000 tpd operational capacity. The optimum pit is #31 with the highest NPV(see Table below) producing a 15.8 years LOMP, but it did not meet the criteria established for a Starter Pit with low strip ratio(less than 3:1) and reasonable capital costs. On this basis the selected pit for mine design & scheduling was Pit # 18.

*41 Optimized pit shells have been generated by keeping the parameters used for the Whittle optimization constant (Operating Costs, Metallurgical Recoveries, Pit Slope Angles and Discount Factor) and by varying the Revenue using   a range of  metal prices illustrated in the table above

The optimal mine scheduling incorporates, mining ore and waste in the year-1 grade optimization and stockpiling of material for reprocessing during the project life. is The production scheduling (Mill Feed Tonnes & grades) is  illustrated as follows:

The 5,000 tpd processing plant will be comprised of crushing, milling and standard flotation facilities with production of a silver-copper concentrate as well as a gold-silver leaching circuit for re-treatment of tailings. The PEA adopted as a guideline a mitigation of environmental and social impact by minimizing the footprint of all proposed operational facilities in the region.

PEA OPPORTUNITIES AND FUTURE STUDIES

Several opportunities are identified that could significantly enhance the economic return outlined in the PEA, including the following:

  • The current Inferred Resources at La Joya provide opportunity for significant project expansion,
  • Mineralization at La Joya is open in most directions with excellent potential to further increased resources. Further infill and expansion drilling is recommended to reclassify resources at a Pre-Feasibility Study level,
  • Additional and detailed metallurgical test work will be completed aiming to optimize the metallurgical flow sheet and potentially improve metal recoveries,
  • Review and optimization of the mining schedule could potentially provide opportunities for reduction in waste and haulage costs which could decrease capital and operating mining costs,
  • This PEA does not address the potential for recovery of several other identified potential products including tungsten, molybdenum, lead, zinc, and tin which may have significant value. Further work is recommended, and
  • Several other targets have been identified on the plus 10,000 hectare concession that remain to be explored for potential new discoveries

The Qualified Persons for this Technical Report and who have reviewed and approved the contents of this news release are Mark Horan, M.Sc., P.Eng., James Barr, P.Geo., Scott Martin, P.Eng. and Graham Wilkins, P.Eng. from the consulting firm of EBA, a Tetra Tech Company, and Ting Lu, M.Sc., P.Eng., Hassan Ghaffari, MASc., P.Eng., Sabry Abdel-Hafez, PhD., P.Eng. and Nick Michael from Tetra Tech. The Technical Report for the PEA will be filed on SEDAR with 45 days of this release.

SilverCrest Mines Inc. (TSX-V: SVL; NYSE MKT: SVLC) is a Canadian precious metals producer headquartered in Vancouver, BC. SilverCrest�s flagship property is the 100%-owned Santa Elena Mine, located 150 km northeast of Hermosillo, near Banamichi in the State of Sonora, M�xico. The mine is a high-grade, epithermal silver and gold producer, with an estimated life of mine cash cost of US$8 per ounce of silver equivalent (55:1 Ag:Au) for the open pit heap leach. SilverCrest anticipates that the 2,500 tonnes per day open pit heap leach facility at the Santa Elena mine should recover approximately 725,000 ounces of silver and 30,000 ounces of gold in 2013. Major expansion and construction of a 3,000 tonnes per day conventional mill facility is underway to significantly increase metals production at the Santa Elena Mine (open pit and underground) by 2014. Exploration programs continue to make new discoveries at Santa Elena and also have rapidly advanced the definition of a large polymetallic deposit at the La Joya property in Durango State with stated resources nearing 200 million ounces of Ag equivalent.

FORWARD-LOOKING STATEMENTS

This news release contains �forward-looking statements� within the meaning of Canadian securities legislation and the United States Securities Litigation Reform Act of 1995. Such forward-looking statements concern the Company�s anticipated results and developments in the Company�s operations in future periods, planned exploration and development of the La Joya project, plans related to its business and other matters that may occur in the future.  These statements relate to analyses and other information that are based on expectations of future performance as outlined in the PEA , including silver, copper and gold production and planned work programs at La Joya. Statements concerning reserves and mineral resource estimates may also constitute forward-looking statements to the extent that they involve estimates of the mineralization that will be encountered if the La Joya property is developed and, in the case of mineral reserves, such statements reflect the conclusion based on certain assumptions that the mineral deposit can be economically exploited.

Forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors which could cause actual events or results to differ from those expressed or implied by the forward-looking statements, including, without limitation: risks related to precious and base metal price fluctuations; risks related to fluctuations in the currency markets (particularly the Mexican peso, Canadian dollar and United States dollar); risks related to the inherently dangerous activity of mining, including conditions or events beyond our control, and operating or technical difficulties in mineral exploration, development and mining activities; uncertainty in the Company�s ability to raise financing and fund the development of the La Joya project pursuant to the PEA; uncertainty as to actual capital costs, operating costs, production and economic returns, and uncertainty that development activities will result in a profitable mining operation at La Joya; risks related to mineral resource figures being estimates based on interpretations and assumptions which may result in less mineral production under actual conditions than is currently estimated and to diminishing quantities or grades of mineral resources as properties are mined; risks related to governmental regulations and obtaining necessary licenses and permits; risks related to the business being subject to environmental laws and regulations which may increase costs of doing business and restrict our operations; risks related to the La Joya property being subject to prior unregistered agreements, transfers, or claims and other defects in title; risks relating to inadequate insurance or inability to obtain insurance; risks related to potential litigation; risks related to the global economy; risks related to the La Joya property being located in Mexico, including political, economic, social and regulatory instability. Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in the forward-looking statements.  The Company�s forward-looking statements are based on beliefs, expectations and opinions of management on the date the statements are made.  For the reasons set forth above, investors should not place undue reliance on forward-looking statements.

The information provided in this news release addresses the La Joya PEA and is not intended to be a comprehensive review of all matters and developments concerning the Company. It should be read in conjunction with all other disclosure documents of the Company. The information contained herein is not a substitute for detailed investigation or analysis. No securities commission or regulatory authority has reviewed the accuracy or adequacy of the information presented.

�N. Eric Fier�   Contact:           Fred Cooper
Telephone:      (604) 694-1730 ext. 108
Fax:                   (604) 694-1761
Toll Free:          1-866-691-1730
Email:               info@silvercrestmines.com
Website:          www.silvercrestmines.com
Suite 501 - 570 Granville Street
Vancouver, BC Canada V6C 3P1
     N. Eric Fier, President and COO
SILVERCREST MINES INC.

Neither TSX Venture Exchange nor its Regulation Services Provider (as defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.


Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

VanEck Vectors Global Alternative Energy ETF

PRODUCTEUR
CODE : SVL.V
ISIN : CA8283651062
CUSIP : 828365
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

SilverCrest Mines est une société de production minière d'argent et d'or basée au Canada.

SilverCrest Mines est en développement de projets d'argent, d'or et de zinc au Salvador, et détient divers projets d'exploration au Mexique.

Son principal projet en production est SANTA ELENA au Mexique, son principal projet en développement est EL ZAPOTE au Salvador et ses principaux projets en exploration sont SILVER ANGEL, CRUZ DE MAYO et LA JOYA DURANGO au Mexique.

SilverCrest Mines est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 126,2 millions (113,8 millions US$, 82,9 millions €).

La valeur de son action a atteint son plus bas niveau récent le 17 décembre 2002 à 0,08 , et son plus haut niveau récent le 02 mars 2012 à 3,17 .

SilverCrest Mines possède 47 442 200 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Présentations des Compagnies de VanEck Vectors Global Alternative Energy ETF
01/06/2010Greg McCoach - Mining Speculator June 2010
01/06/2010Corporate Presentation - June 2010
31/03/2010 Funding In Place, Construction on Schedule for 2010 Product...
01/01/2010Why invest in SilverCrest Mines?
10/06/2009Corporate report June 2009
31/03/2008New Recommendation
22/11/2006Corporate Presentation
Dans les médias de VanEck Vectors Global Alternative Energy ETF
14/03/2012Scott Drever=2C President of SilverCrest Interview on BNN
22/09/2008Objective Capital research
25/10/2007Analysis by David and Eric Coffin
17/11/2006Follow up N° 4
Rapports annuels de VanEck Vectors Global Alternative Energy ETF
2009 Annual Report
2008 annual report
Annual Report 2006
Financements de VanEck Vectors Global Alternative Energy ETF
20/05/2011Closes $30 Million Bought Deal Financing
28/04/2011Announces CAD$30.0 Million Bought Deal Common Share Financin...
20/03/2008Completes Private Placement; Amends $3.0 Million Macquarie F...
13/03/2008Announces First Closing Of Private Placement
Attributions d'options de VanEck Vectors Global Alternative Energy ETF
29/03/2008 Engages Marketing Consultant and Grants Stock Options
Nominations de VanEck Vectors Global Alternative Energy ETF
13/06/2013Reports Results of AGM Announces Officer and Director Appoin...
31/01/2013Appoints Vice President, Corporate Development
15/02/2011SilverCrest Appoints of Mr. Brent McFarlane Vice President, ...
Rapports Financiers de VanEck Vectors Global Alternative Energy ETF
13/08/2015Announces Q2, 2015 Financial Results; Operating Cash Flow of...
14/11/2013Reports Q3, 2013 Financial Results Cash Flow from Operations...
15/08/2013Reports Q2, 2013 Financial Results Cash Flow from Operations...
15/08/2013Reports Q2, 2013 Financial Results
15/05/2013Reports Q1, 2013 Financial Results Cash Flow from Operations...
14/03/2013Announces 2012 Financial Results Cash Flow from Operations o...
14/11/2012Reports Q3, 2012 Financial Results Cash Flow From Operations...
15/08/2012Reports Q2=2C 2012 Financial Results
15/05/2012Reports Q1 2012 Financial Results Cash Flow from Operations ...
10/04/2012Announces 2011 Financial Results Cash Flow from Operations o...
29/11/2011Reports $5.1 Million Third Quarter Cash Flow from Operation...
30/08/2011Announces Second Quarter Earnings of $790,000 and Cash Flow ...
02/08/2011Form 40-F Registration Statement Effective
Projets de VanEck Vectors Global Alternative Energy ETF
25/02/2014(Santa Elena)Receives US$10 Million Commitment from Sandstorm Gold for Un...
14/01/2014Evrim Options Ermita=F1o Property to SilverCrest Mines
24/12/2013Files La Joya Preliminary Economic Assessment Report
21/10/2013Announces Positive La Joya Preliminary Economic Assessment ...
15/10/2013Announces Q3 Record Silver Production 202,736 Ounces Silver-...
05/09/2013(Santa Elena)Reports Additional Drill Results at Santa Elena Mine; Anothe...
25/07/2013(Santa Elena)Announces Santa Elena Expansion Pre-Feasibility Study; Base...
17/07/2013Announces Q2 Record Silver Production 194,022 Ounces Silver ...
29/05/2013(Santa Elena)Announces Updated Santa Elena Reserves and Resources; Silver...
24/04/2013Announces Q1 Production 153,481 Ounces Silver & 7,225 Ounces...
28/03/2013Files La Joya Technical Report Updated Resources & Positive ...
29/01/2013Announces Updated La Joya Resources
16/01/2013Exceeds 2012 Production Market Guidance Announces Q4 Results...
14/01/2013(Santa Elena)Expands Santa Elena Deposit; More High Grade Intercepts 13m ...
07/01/2013(Santa Elena)Discovers Bonanza Grades and New Zone at Santa Elena 15.6m ...
13/11/2012(Santa Elena)Drilling Update for Santa Elena Mine
07/11/2012Pays Out Gold Hedge Facility Gold and Silver Production Now ...
16/10/2012Announces Q3 Production 151,368 Ounces Silver & 7,184 Ounces...
23/07/2012Announces Q2 Production 139=2C850 Ounces Silver & 8=2C584 Ou...
06/07/2012(Santa Elena)=E2??s Santa Elena Mine Expansion Continues on Schedule
19/04/2012Announces Q1 Silver and Gold Production 134=2C528 Silver Ou...
20/03/2012(La Joya Durango)Reports 58m @ 164.7 gpt Ag Eq* at La Joya
16/02/2012(La Joya Durango)Reports Coloradito Target Results at La Joya Property=3B Pot...
23/01/2012(La Joya Durango)s Corporate Resources Silver Equivalent Inferred Resources ...
23/01/2012(Cruz De Mayo)s Corporate Resources Silver Equivalent Inferred Resources ...
23/01/2012(Cruz De Mayo)s Corporate Resources Silver Equivalent Inferred Resources ...
23/01/2012(Santa Elena)s Corporate Resources Silver Equivalent Inferred Resources ...
12/01/2012(Santa Elena)Reports Record Production in Q4 at Santa Elena=3B =E2?=A2 Si...
05/01/2012(La Joya Durango)Announces Initial Resources at La Joya Property=3B +100 mill...
30/11/2011(La Joya Durango)Commences Phase II Drilling at La Joya=3B Phase II Surface S...
14/10/2011(Santa Elena)Reports Increased Santa Elena Production in Q3 Silver Produc...
22/09/2011(Santa Elena)Begins Drilling at Cruz de Mayo, Reports on Santa Elena Nort...
22/09/2011(Cruz De Mayo)Begins Drilling at Cruz de Mayo, Reports on Santa Elena Nort...
10/08/2011(La Joya Durango)Video Tour of La Joya Mine Project, Durango Mexico
13/07/2011(Santa Elena)Declares Commercial Production at Santa Elena Mine; Pours 74...
07/06/2011(La Joya Durango)Reports Additional La Joya Drill Results, More High Grade Si...
26/04/2011(Santa Elena)Files NI 43-101 Technical Report for Santa Elena Reserve Up...
13/04/2011(Santa Elena)Santa Elena Mine Commissioning Phase Update, Silver And Gold...
12/04/2011(Santa Elena)Announces Santa Elena Expansion Plan Net Present Value of US...
13/03/2011(La Joya Durango)Reports La Joya Initial Drill Results; Up to 19.2 Metres of ...
06/01/2011(Santa Elena)Santa Elena Mine Start-Up Phase Update
01/12/2010(La Joya Durango)Acquires New Major Mexico Property
14/08/2009(Santa Elena)to Acquire 100% of the Santa Elena Project
09/06/2009(Santa Elena)Announces Agreement With MacQuarie Bank Limited For US12.5 M...
15/08/2008Receives Environmental Impact Assessment Approval; NI43-10...
30/06/2008(Santa Elena)Santa Elena prefeasibility study completed
26/06/2008(Santa Elena)Pre-Feasibility Results at Santa Elena, Mexico
05/06/2008(Santa Elena)Main Zone Expansion Drilling 11.2 metres (36.73 feet) gradin...
21/05/2008(Santa Elena) Submits Environmental Impact Assessment; Receives Land Use ...
08/04/2008(Santa Elena)Continues to Expand Main Zone at Santa Elena, Mexico
21/02/2008(Santa Elena)Updates Progress at the Santa Elena Project, Mexico
09/01/2008(Santa Elena)Continues to Intercept High Grade Gold and Silver at the San...
04/01/2008(Santa Elena)Resource Expansion at Santa Elena and Cruz de Mayo
20/12/2007(Santa Elena)Secures Surface Rights for Santa Elena Project, Mexico
29/11/2007(Santa Elena)Intercepts 32.9 Metres of 367 gpt (10.7 Ounces) Silver & Sil...
15/11/2007(Cruz De Mayo)SilverCrest Announces Resource Increase Indicated Resources ...
18/10/2007(Santa Elena)SilverCrest Intercepts 51.4 Metres of 1.53 gpt Gold and 126 ...
26/09/2007(Santa Elena) Continues to Expand Santa Elena Deposit, Northern Mexico
11/09/2007(Santa Elena)Mobilizes Second Drill Rig to Santa Elena Project, Mexico
06/09/2007(Santa Elena)Significantly Expands Mineralization at Santa Elena Project,...
26/07/2007(Cruz De Mayo)Reports Final RC Drill Results and Preliminary Metallurgy at...
05/07/2007(Cruz De Mayo)Reports More Silver at Cruz de Mayo, Mexico
24/05/2007(Cruz De Mayo)Reports New Silver Discovery at Cruz de Mayo, Mexico
10/05/2007(Cruz De Mayo)Updates Progress at the Santa Elena Project, Mexico
Communiqués de Presse de VanEck Vectors Global Alternative Energy ETF
24/02/2014Graduates to Toronto Stock Exchange Trading Commences Februa...
20/02/2014Announces $20 Million Bought Deal
17/02/2014(Santa Elena)Confirms U/G High Grades at Santa Elena 11.6m @ 5.83 gpt Au ...
14/12/2013Announces Grant of Stock Options
19/11/2013SilverSeek LIVE! Wed. Nov, 20th @ 2PM EST -- David Morgan (S...
21/10/2013Announces Positive La Joya Preliminary Economic Assessment B...
12/07/2013Arranges $40 Million Credit Facility with Scotiabank
27/05/2013Completes Exercise of La Joya West Option
27/05/2013Completes Exercise of La Joya West Option
25/04/2013Announces 2013 Annual Meeting and Adoption of Corporate Gove...
08/04/2013(Santa Elena)Continues to Expand Santa Elena Deposit More High Grade Inte...
30/10/2012Closes $34.5 Million Prospectus Offering, Over-Allotment Opt...
05/10/2012Announces Increase in Bought Deal to $30 Million
05/10/2012Announces $26.1 Million Bought Deal
27/09/2012Reports High Grade Surface Sampling and Additional Drill Res...
22/08/2012ANNOUNCES TRADING ON NYSE MKT TO COMMENCE AUGUST 27=2C 2012
17/07/2012Reports 50m @ 151.8 gpt Ag Eq* at La Joya Main Mineralized...
29/06/2012Reports Annual General Meeting Results
07/05/2012Reports 127.4m @ 65.6 gpt Ag Eq* at La Joya Expands Main M...
21/02/2012Files NI43=2D101 Resource Report for La Joya Property
30/01/2012Presenting At the Silverseek Online Forum
09/01/2012Retires Bank Debt Ahead of Schedule
07/10/2011Commences Trading on OTCQX
17/06/2011Announces Appointment of New Director, Reconfirmation of Sha...
31/05/2011Files Form 40-F Registration Statement with SEC
29/07/2010Initial Gold & Silver Production Imminent
06/05/2010& Goldsource Appoint Director of Communications
22/09/2009Analyst Coverage by Jennings Capital
13/07/2009New office
24/06/2009Eric Fier on Newsmakers
17/11/2008At Hard Assets Conference, San Francisco
24/09/2008New Video Tour: Underground Silver Deposits at Santa Elena
13/07/2008Report
10/07/2008Signs Agreement For $3.0 Million Feasibility Finance Facilit...
21/04/2008Initiation Report
01/03/2008Announces US$3.0 Million Feasibility Finance Facility & Prop...
19/09/2007Intercepts 10.1 Metres of 6.53 gpt Gold and 218.7 gpt Silve...
08/03/2007Completes Second Phase Drill Program at Cruz de Mayo, Mexico
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (SVL.V)Other OTC (STVZF)
2,66-0.37%1,89-4.55%
TSX-V
CA$ 2,66
21/02 17:00 -0,010
-0,37%
Cours préc. Ouverture
2,67 2,69
Bas haut
2,63 2,71
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  2,66 -%
Volume var. 1 mois
493 509 -%
24hGold TrendPower© : 27
Produit Gold - Silver
Développe Gold - Silver - Zinc
Recherche Silver
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 18/10/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
6,69 AU$-0,15%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 +100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
8,26 US$+2,23%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,63 GBX+6,80%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,07 -0,48%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 +0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
12,98 -0,08%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,30 +7,14%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 +2,56%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
2,17 +0,00%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
39,22 US$+0,28%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,10 AU$-4,55%Trend Power :
Sun Res.(Oil)SUR.AX
Released ASX Announcement: Quarterly Activities Report
0,00 AU$+0,00%Trend Power :
Profil de VanEck Vectors Global Alternative Energy ETF | Articles sur VanEck Vectors Global Alternative Energy ETF | Indicateurs de marché de VanEck Vectors Global Alternative Energy ETF | Projets et ressources de VanEck Vectors Global Alternative Energy ETF | Valorisation de VanEck Vectors Global Alternative Energy ETF | Voir les mines de VanEck Vectors Global Alternative Energy ETF | Présentation de l'entreprise VanEck Vectors Global Alternative Energy ETF | Rapport annuel de VanEck Vectors Global Alternative Energy ETF | Management de VanEck Vectors Global Alternative Energy ETF | Graphique interactif de VanEck Vectors Global Alternative Energy ETF | Graphiques gratuits de VanEck Vectors Global Alternative Energy ETF | VanEck Vectors Global Alternative Energy ETF TSX-V | VanEck Vectors Global Alternative Energy ETF Other OTC | VanEck Vectors Global Alternative Energy ETF FRANKFURT
Profitez de la hausse des actions aurifères
  • Inscrivez-vous à notre market briefing minier
    hebdomadaire
  • Recevez nos rapports sur les sociétés qui nous semblent
    présenter les meilleurs potentiels
  • Abonnement GRATUIT, aucune sollicitation
  • Offre limitée, inscrivez-vous maintenant !
Accédez directement au site.