Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
Cours Or & Argent
Dans la même rubrique
High River Announces Production Results for Q1 2012
Published : April 24, 2012
( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Burkina Faso |

TORONTO, ONTARIO--(Marketwire - April 24, 2012) - High River Gold Mines Ltd. (News - Market indicators) ("High River" or the "Company") announces its production results for the first quarter ending March 31, 2012.

Highlights

Q1 gold production of 84.4 thousand gold equivalent ounces ("koz"), 7% below production in Q1 2011
     
Increase in Q1 2012 production (+3% vs Q1 2011) at Buryatzoloto, with lower production at Taparko (-13%) and Berezitovy (-10%) due to temporary mechanical bottlenecks that have been rectified
     
The increased average realised gold price of $1,676 per ounce over the quarter had a positive impact on cash flow and earnings with revenue at $141 m
     
Significant progress on greenfield and debottlenecking projects:
  o Bissa - construction phase progressing on schedule; first production to begin in 1H 2013
  o Taparko - regrind mill and two additional leach tanks to start in June 2012
  o Berezitovy - installation of the secondary crusher and a new pinion is on track for June 2012
     
The Company expects gold production for the full year to be in the range of 380 and 400 koz. Significant production growth in H2 will be primarily driven by:
  o Launch of heap leach at Berezitovy
  o Elimination of mechanical bottlenecks at Taparko and Berezitovy
   
Production Summary  
   
Operating results Q12012   Q12011 Change  
Ore mined, kt 973   984 (1 %)
Ore milled, kt 819   858 (5 %)
Grade, g/t 3,55   3,7 (4 %)
Recovery, % 89,2 % 91,0 (1.8  pp)
Gold production, Koz 84,4   90.5 (7 %)
Gold sold, Koz 84,4   90.2 (6 %)
Average realised gold price per ounce sold, US$/oz 1,676   1,409 19 %
Revenue, US$ m 141,4   127 11 %
LTIFR ratio 3.00   1.26 238 %
   
Refined gold production by mines(1)  
   
Operating results Q1 2012 (koz ) Q1 2011 (koz ) Change  
Taparko 32.4   37.3   (13 %)
Buryatzoloto 31.6   30.7   3 %
Berezitovy 20.3   22.5   (10 %)
High River 84.4   90.5   (7 %)
Note:
(1) Gold equivalent (based on 1:45Ag/Au rate for Q1 2012. Silver production amounts 1 koz in gold equivalent for the Q1 2012).

Overview

In Q1 2012, production decreased by 7% to 84.4 koz compared to Q1 2011 production of 90.5 koz. Buryatzoloto was an outperforming y-o-y mine, while Taparko and Berezitovy were underperformers with lower production y-o-y. The main reasons for this underperformance are temporary mechanical bottlenecks that have been largely solved during the first quarter 2012. A more detailed explanation is provided in the mine site summary below.

Despite the temporary operational matters at certain minesites, the Company remains on track to achieve full year production target of 380-400 koz in 2012. Management expects a skew toward the second half driven by the new heap leach launch at Berezitovy mine. The production volumes at the Taparko and Berezitovy mines should be reflected by elimination of mechanical bottlenecks at these mines during Q1 2012.

Revenue from metal sales was US$141 million in Q1 2012, versus US$127 million during the same period in 2011, an increase of 11% reflecting stronger average realized gold price of US$1,676 per ounce, 19% higher than in the comparable period in 2011.

Mine site summary

Burkina Faso

   
Taparko  
   
Operating results* Q1 2012   Q1 2011   Change  
Ore mined, kt 362   407   (11 %)
Ore milled, kt 404   380   6 %
Grade, g/t 3.03   3.46   (12 %)
Recovery, % 84.7 % 86.7 % (2  pp)
Gold production, koz 32.4   37.3   (13 %)
Gold sold, koz 32.5   37.3   (13 %)
Average realised gold price per ounce sold, US$/oz 1,672   1,400   19 %
Revenue, US$ m 54.3   52.3   4 %
* Ore processed multiplied by head grade and multiplied by recovery may not be equal gold produced due to differences in work in progress figures and volumes of silver production.

Processing

Ore processing increased by 6% in Q1 2012, which partially offset a slight deterioration in head grade at this mine. We processed c.404,000 tonnes of ore in Q1 2012, an increase of 6% on the same period last year.

Head Grade

Overall head grade in the first quarter was 3.03 g/t at this facility, compared to 3.46 g/t in the first quarter of last year, due to mine plan variations

Recovery

In the first quarter, Taparko was influenced by two factors affecting recovery - we processed more ore, while head grade was lower. As a result, recovery reduced by 2% from 86.7% in the first quarter of 2011 to 84.7% in the first quarter of this year.

We are working on several upgrades which should significantly improve recovery at Taparko starting from Q3. These include the installation of a regrind and two leach tanks to increase recovery by about 5%, as well as a mobile crusher to reduce the impact of the rainy season.

Russia

   
Buryatzoloto  
   
Operating results* Q1 2012   Q1 2011   Change  
Ore mined, kt 169   155   9 %
Ore milled, kt 171   153   12 %
Grade, g/t 5.84   6.86   (15 %)
Recovery, % 93.7 % 92.6 % 1.1  pp
Gold production, koz 31.6   30.7   3 %
Gold sold, koz 31.6   30.4   4 %
Average realised gold price per ounce sold, US$/oz 1,672   1,424   17 %
Revenue, US$ m 52.8   43.3   22 %
* Ore processed multiplied by head grade and multiplied by recovery may not be equal gold produced due to differences in work in progress figures and volumes of silver production.

Processing

Ore processing has increased due to better availability of the mills at both Irokinda and Zun Holba head grade.

Head Grade

Head grade reduced slightly due to mine plan scheduling. According to the mine plan, we are expecting better grades for the remainder of the year.

Recovery

The Company completed a recovery improvement program at Buryatzoloto in the end of last year, the benefits of which we are now beginning to see in the recovery rates.

   
Berezitovy  
   
Operating results* Q1 2012   Q1 2011   Change  
Ore mined, kt 442   422   5 %
Ore milled, kt 243   325   (25 %)
Grade, g/t 2.81   2.51   12 %
Recovery, % 90.6 % 90.4 % 0.2  pp
Gold production, koz 20.3   22.5   (10 %)
Gold sold, koz 20.4   22.5   (9 %)
Average realised gold price per ounce sold, US$/oz 1,687   1,403   20 %
Revenue, US$ m 34.4   31.5   9 %
* Ore processed multiplied by head grade and multiplied by recovery may not be equal gold produced due to differences in work in progress figures and volumes of silver production.

Processing

In November 2011 a pinion of the SAG mill at failed. It was immediately replaced with a temporary unit that enabled the plant to work at 75% of its design capacity. We expect to fully eliminate this bottleneck in early May when a new gear shaft is received.

An installation of a secondary crusher in June should further improve plant productivity by reducing the size of SAG mill feed.

Head Grade

Head grade available for mining has been higher than in Q1 of last year. We expect head grade to moderate in H2 2012.

Recovery

The observed recovery is largely flat and slightly above plant's design recovery.

Exploration & Development

Bissa

The main achievement for Q1 2012 was construction of the dam that was started in February 2012 with the clear target to finish all ground works before the end of May. That was one of the most significant challenges that might negatively influence production volumes for the first year for Bissa. The dam allows us to collect the appropriate amount of water during the rainy season and be prepared for the beginning of production.

We have now received half of the mining fleet on site with the expectation for the remainder to be delivered in July. Onsite we now have ten dump trucks, two graders, three excavators, one telehandler, one dozer and three loaders.

Plant construction is also underway: we have built a foundation for the leaching tanks and started construction of those tanks. The mill delivery is also underway with the scheduled arrival time in the second half of June. We are currently working on the foundation for the mills, and during the first quarter construction advanced significantly. A further update on the progress of construction will be given at the Company's interim results. At the end of March, we started construction of the ROM pad and crusher. We are also on track to erect the onsite LFO\HFO power generators.

During the first quarter this year we have been working on the camp for mine employees and we are proud to state that the camp is now almost 100% complete, and we are only awaiting some kitchen equipment and final completion of the swimming pool.

We are currently in the design phase for the tailing dam, which is on time with our development plan for the overall project.

We reached an agreement with the government and local communities on the relocation of two small villages that will be affected by future mine operations. New villages for the relocated communities are built, which retained the approximate layout of the existing villages, reflecting our belief that the shape of communities is important to their success. We also provided social infrastructure and services to the relocated villages, including a water supply, medical center, school, church, mosque, and a community meeting place.

The project is well on track to deliver first gold in 1H13.

About High River

High River is an unhedged gold company with interests in producing mines, development and advanced exploration projects in Russia and Burkina Faso. Two underground mines, Zun-Holba and Irokinda, are situated in the Lake Baikal region of Russia. Two open pit gold mines, Berezitovy in Russia and Taparko-Bouroum in Burkina Faso, are also in production. Finally, High River has a 90% interest in a development project, the Bissa gold project in Burkina Faso, and a 50% interest in an advanced exploration project with NI 43-101 compliant resource estimates, the Prognoz silver project in Russia.

FORWARD LOOKING INFORMATION

This release contains forward-looking statements. Wherever possible, words such as "intends", "expects", "scheduled", "estimates", "anticipates", "believes", and similar expressions or statements that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, have been used to identify these forward-looking statements. Although the forward-looking statements contained in this release reflect management's current beliefs based upon information currently available to management and based upon what management believes to be reasonable assumptions, High River cannot be certain that actual results will be consistent with these forward-looking statements. A number of factors could cause events and achievements to differ materially from the results expressed or implied in the forward-looking statements. These factors should be considered carefully and prospective investors should not place undue reliance on the forward-looking statements. Forward-looking statements necessarily involve significant known and unknown risks, assumptions and uncertainties that may cause High River's actual results, events, prospects and opportunities to differ materially from those expressed or implied by such forward-looking statements. Although High River has attempted to identify important risks and factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors and risks that cause actions, events or results not to be anticipated, estimated or intended, including those risk factors discussed in the Company's 2011 Annual Information Form. There can be no assurance that the forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, prospective investors should not place undue reliance on forward-looking statements. Any forward-looking statements are made as of the date of this release, and High River assumes no obligation to update or revise them to reflect new events or circumstances, unless otherwise required by law.



High River Gold Mines Ltd.
Yury Lopukhin
CFO
011 7 495 981 0910 ext. 6821
info@hrg.ca
www.hrg.ca
Données et statistiques pour les pays mentionnés : Burkina Faso | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Burkina Faso | Tous

VanEck Vectors Global Alternative Energy ETF

PRODUCTEUR
CODE : HRG.TO
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

High River Gold est une société de production minière d'or basée au Canada.

High River Gold est productrice d'or, d'argent au Burkina Faso et in Russia, en développement de projets d'or au Burkina Faso, et détient divers projets d'exploration au Burkina Faso.

Ses principaux projets en production sont BURYATZOLOTO (ZUN-HOLMA), BEREZITOVY, SOMITA et IROKINDA in Russia et TAPARKO au Burkina Faso, son principal projet en développement est BOUROUM au Burkina Faso et ses principaux projets en exploration sont NOVOPHIRSOVSKOYE et PROGNOZ in Russia et BISSA GOLD au Burkina Faso.

High River Gold est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 65,9 millions (64,8 millions US$, 49,8 millions €).

La valeur de son action a atteint son plus haut niveau récent le 07 mars 2008 à 3,50 , et son plus bas niveau récent le 14 novembre 2008 à 0,04 .

High River Gold possède 47 442 200 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de VanEck Vectors Global Alternative Energy ETF
2007 Annual Report
2006 Annual Report
2005 Annual Report
Financements de VanEck Vectors Global Alternative Energy ETF
02/12/2009Closing of Private Placement
19/06/2009Announces Closing of Private Placement and Update on TSX Del...
Nominations de VanEck Vectors Global Alternative Energy ETF
24/01/2013Announces Change to the Board of Directors
15/05/2012Announces Appointment of Chief Executive Officer and Chief F...
05/03/2012Announces Resignation of Chief Executive Officer
10/12/2009Appointment to the Board of Directors and the Audit Committe
21/10/2009 Appointment of Chief Executive Officer
30/09/2009Announces Appointment of New Board Member
Rapports Financiers de VanEck Vectors Global Alternative Energy ETF
14/08/2012Financial Results for the Second Quarter Ended June 30, 2012
16/05/2012Financial Results for the First Quarter Ended March 31, 2012
24/02/2012Announces Release of Nord Gold Financial Statements
15/08/2011Reports Second Quarter 2011 Results
13/08/2010Reports Second Quarter 2010 Results
13/05/2010Reports First Quarter 2010 Results
15/08/2009Reports Second Quarter 2009 Results
18/12/2008Reports Third Quarter 2008 Results
Projets de VanEck Vectors Global Alternative Energy ETF
22/01/2013Announces Production Results for Q4 2012
11/10/2012Announces Production Results for Q3 2012
18/07/2012Announces Production Results for Q2 2012
24/04/2012Announces Production Results for Q1 2012
18/01/2012Announces Preliminary Production Results for 2011
04/07/2011(Bissa Gold)Announces the Granting of Mining License for Bissa Gold Proj...
18/02/2011(Prognoz)Provides an Update on the Bankruptcy Procedures of Prognoz S...
31/01/2011(Berezitovy)Reports Updated Resource and Reserve Statements
31/01/2011(Bissa Gold)Reports Updated Resource and Reserve Statements
31/01/2011(Taparko)Reports Updated Resource and Reserve Statements
31/01/2011(Bouroum)Reports Updated Resource and Reserve Statements
28/01/2011(Taparko)Announces Release of Royal Gold Security
11/09/2009(Irokinda)Reports Two Accidental Deaths at Irokinda Mine
22/06/2009(Bissa Gold)Reports Updated NI 43-101Compliant Resource Estimate for Bis...
04/12/2008(Prognoz)Advises That Closing of Prognoz Acquisition Not Extended and...
10/11/2008(Taparko)Re-Starts Mill at Taparko-Bouroum and Provides Update on Str...
30/09/2008(Prognoz)Advises That Closing of Prognoz Acquisition Transaction Has ...
31/03/2008(Taparko)2008 Technical report
11/07/2007Discovers New High Grade Gold Zone at Simkar
01/05/2007Announces New Acquisition in Southeastern Peru, Vetaspata --...
28/03/2007High Grade Gold intersected at Quintana Gold Mine, Colombia ...
Communiqués de Presse de VanEck Vectors Global Alternative Energy ETF
13/03/2013Nord Gold N=2EV=2E and High River Gold Min
11/12/2012Acknowledges Expiry of Offer by Nord Gold
31/10/2012Mails Directors' Circular; Board Recommends Shareholders Acc...
22/10/2012Acknowledges Bid by Nordgold; Advises Shareholders to Wait f...
27/09/2012Announces Updated Reserve and Resource Estimate and Files Te...
31/07/2012Provides Update on Nord Gold Offer
20/07/2012Announces Amended and Restated AIF and Amended Technical Rep...
18/07/2012Responds to Nord Gold Press Release and Establishes Special ...
08/06/2012(Berezitovy)Files Technical Reports for Berezitovy and Burkina Faso Prop...
24/05/2012Announces Date of Annual General Meeting
24/04/2012(Berezitovy)Announces Updated Reserve and Resource Estimates for Berezit...
13/04/2012Second Default Status Report
31/03/2012Reports 2011 Results
28/03/2012First Default Status Report
01/03/2012Announces Default Pursuant to National Policy 12-203
24/02/2012(Prognoz)Provides an Update on the Bankruptcy Procedures of Prognoz S...
29/12/2011(Berezitovy)Announces Amended Q2 2011MD&A and Berezitovy Technical Repor...
02/09/2011(Prognoz)Provides an Update on the Bankruptcy Procedures of Prognoz S...
07/06/2011Reaches Settlement With Senet CC
24/01/2011Shareholders Approve Continuing to Yukon
08/06/2010Announces the Beginning of the Bankruptcy Procedures of Prog...
28/05/2010Announces Change to the Board of Directors and Inclusion in ...
20/04/2010Reports 2009 Results
14/04/2010First Default Status Report
01/04/2010Late Filing of Annual Filings and Provides Operational and F...
01/12/2009Clearance of PIF in Connection With CDN$57 Million Financi
03/11/2009Announces Change of Auditor
27/10/2009Announces Proposed $57 Million Financing
08/10/2009Change to the Board of Directors
23/09/2009 Change to the Board of Directors
21/09/2009 Resignation of Chief Executive Officer
15/09/2009Announces New Investor Relations Contact
01/09/2009Announces Resignation of VP Exploration
23/07/2009New Chief Financial Officer
16/07/2009Provides Q2/2009 Update on Operations and Financial Status
26/06/2009Mailing of Offer
17/06/2009Enters Into Support Agreement With Severstal
09/06/2009Provides Update on Improved Severstal Offer and Announces Pr...
22/05/2009Provides Update on Strategic Alternatives
19/05/2009Provides Update on Operations and Financial Status
06/03/2009Provides Update on Operations
02/02/2009Provides Update on Operations
02/01/2009Provides Update on Operations, Financial Status, and Personn...
14/12/2008Second Default Status Report
01/12/2008First Default Status Report
19/11/2008Announces Late Filing of Interim Financial Statements
22/09/2008Comments on Share Price Decline
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (HRG.TO)FRANKFURT (HRG.F)
1,39+0.72%1,03+0.49%
TORONTO
CA$ 1,39
14/03 14:56 0,010
0,72%
Cours préc. Ouverture
1,38 1,40
Bas haut
1,39 1,40
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  1,39 -%
Volume var. 1 mois
1 900 -%
24hGold TrendPower© : -8
Produit Gold
Développe
Recherche Gold - Silver
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 17/02/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
6,83 AU$-1,30%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 +100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
9,64 US$-5,30%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,63 GBX+0,32%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,29 +4,09%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 +0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
14,50 +0,00%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,33 +0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 +5,56%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,99 -2,93%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
38,96 US$+2,88%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :
Sun Res.(Oil)SUR.AX
Released ASX Announcement: Quarterly Activities Report
0,00 AU$+0,00%Trend Power :
Profil de VanEck Vectors Global Alternative Energy ETF | Articles sur VanEck Vectors Global Alternative Energy ETF | Indicateurs de marché de VanEck Vectors Global Alternative Energy ETF | Projets et ressources de VanEck Vectors Global Alternative Energy ETF | Valorisation de VanEck Vectors Global Alternative Energy ETF | Voir les mines de VanEck Vectors Global Alternative Energy ETF | Présentation de l'entreprise VanEck Vectors Global Alternative Energy ETF | Rapport annuel de VanEck Vectors Global Alternative Energy ETF | Management de VanEck Vectors Global Alternative Energy ETF | Graphique interactif de VanEck Vectors Global Alternative Energy ETF | Graphiques gratuits de VanEck Vectors Global Alternative Energy ETF | VanEck Vectors Global Alternative Energy ETF TORONTO | VanEck Vectors Global Alternative Energy ETF FRANKFURT | VanEck Vectors Global Alternative Energy ETF OTHER OTC
Profitez de la hausse des actions aurifères
  • Inscrivez-vous à notre market briefing minier
    hebdomadaire
  • Recevez nos rapports sur les sociétés qui nous semblent
    présenter les meilleurs potentiels
  • Abonnement GRATUIT, aucune sollicitation
  • Offre limitée, inscrivez-vous maintenant !
Accédez directement au site.