Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
Cours Or & Argent

Sphinx Resources

Publié le 07 juin 2007

Bracemac Yields Additional Results With New Mineralization Identified

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Copper | Zinc |
Marketwire
 
 
Donner Metals Ltd.
TSX VENTURE:DONStock QuoteStock Chart
FRANKFURT:D4M
Other Recent News

June 6, 2007
Donner Metals Ltd.: Bracemac Yields Additional Results With New Mineralization Identified at the Productive Key Tuffite Horizon Below the Bracemac Zones
VANCOUVER, BRITISH COLUMBIA--(CCNMatthews - June 6, 2007) - Mr. Harvey Keats, Chief Executive Officer of Donner Metals Ltd. (TSX VENTURE:DON)(FRANKFURT:D4M), announces new results from the Bracemac Area on the Matagami Project, Quebec, and a new discovery of massive sulphide at the Key Tuffite Horizon below the Upper Bracemac/Bracemac Zones.

In the Upper Bracemac Zone, BRC-07-35 intersected two massive sulphide intervals grading 36.70% zinc and 0.05% copper over 0.65 metres and 10.70% zinc and 0.41% copper over 2.8 metres. BRC-07-39 intersected 3.5 metres grading 9.02% zinc and 0.56% copper. The intersections are 60 and 103 metres vertically below surface respectively.

Additionally, a drill test below the Bracemac Zones intersected the first indication of significant mineralization at the Key Tuffite horizon where BRC-07-38 intersected mineralized Key Tuffite over 2.6 metres, including a massive and semi-massive interval that graded 11.41% zinc and 0.26% copper over 1.3 metres, 230 metres below surface.

Reported results show a continued trend of mineralization towards surface in the Upper Bracemac Zone while delineation of the Bracemac Zone suggests an elongate trend that extends down-dip and down-plunge. Drilling is continuing where practical during break-up.

The intersection of massive sulphides at the Key Tuffite Horizon below Bracemac and Upper Bracemac is significant because it is a positive indicator of vertically stacked mineralizing activity at three levels, including the Key Tuffite horizon that hosts the majority of the deposits in the Matagami Camp. It is important to note that vertically stacked horizons can be exploited by single development infrastructure, providing a significant savings in development costs.

The Company's strategy is to explore for and discover Zinc - Copper deposits in the Matagami Camp and to leverage existing processing facilities within a known and well-established cost structure for developing VMS deposits. Donner's exploration objective is to investigate multiple stratigraphic horizons with potential for VMS mineralization including the prolific Key Tuffite horizon throughout the Matagami Camp. Donner has discovered new mineralization at the Bracemac and Upper Bracemac levels and now reports an additional discovery in the Key Tuffite immediately below the Bracemac Zone discoveries.

Work completed since the last press release (April 3, 2007) includes the completion of seven drill holes and one hole deepening in the Bracemac area leading up to break-up which has limited access to planned drill collar locations. A total of 20,500 metres have been drilled of the planned 45,000 metre drill program. Three drills are active on the Matagami property with two drills active at Bracemac and one drill active at McLeod where results will be forthcoming.

Bracemac Area

Delineation continues on both of the new discoveries in the Bracemac and Upper Bracemac Zones, as well as an investigation of the Key Tuffite in the Bracemac area. Break-up has limited access to some planned drill set-ups and these holes will be drilled once surface conditions improve.

The sulphide intersections in diamond drill hole BRC-07-35 and BRC-07-39 continue to expand the Upper Bracemac Zone that extends 125 metres along plunge, trending towards surface, with a lateral extent of 50 to 60 metres. Drill hole BRC-07-35 was drilled 35 metres up-dip and to the east of drill hole BRC-07-31 that intersected 12.13% zinc and 0.7% copper over 9.3 metres. Drill hole BRC-07-39 was drilled 50 metres east and up-dip from drill hole BRC-07-30 that intersected 10.08% zinc, 0.49% copper over 2.3 metres and 25 metres down-dip of BRC 07-31 described above. BRC-07-33 was drilled 50 metres due east of BRC-07-31 and BRC-07-37 was drilled a further 100 metres due east of BRC-07-33.

In the Bracemac Zone, drill hole BRC-07-36 intersected 0.91% copper over 4.75 metres. This hole was drilled 60 metres to the west and down-dip of BRC-07-32 that returned 1.98% copper and 2.99% zinc over 21.25 metres. All of the drill holes designed to test the Upper Bracemac Zone also tested the up-dip portion of the Bracemac Zone where the extent of mineralization is now limited. The Bracemac Zone remains open down-dip, and down-plunge as well as to the east and west of known mineralization. Presently, the Bracemac Zone extends over approximately 200 metres in the plunge extent and between 20 and 100 metres in the lateral extent.

A significant mineralized interval at the Key Tuffite was discovered by BRC-07-38 that intersected 11.41% zinc and 0.26% copper at a vertical depth of 230 metres. This intersection occurs immediately below mineralization in the Bracemac zones and is open in all directions. In addition, BRC-86-4 EXT-W was drilled to test the Key Tuffite at a vertical depth of 900 metres and intersected weak mineralization at the targeted horizon.

West Camp

Three reconnaissance holes were drilled 50 kilometers west of Matagami to test Mag and EM (VTEM) geophysical anomalies in an area with geological potential to contain Matagami-type VMS Mineralization. Two of the three holes intersected weakly mineralized graphitic sediments (pyrite and pyrrhotite) within a sequence of felsic volcanic rocks. The third hole intersected weakly mineralized felsic volcanic rocks (pyrrhotite).

About the Matagami Project

The Matagami Project has an area of mutual interest of 4,737 square kilometres and presently includes 2,138 mineral claims covering 499 square kilometres. Taking advantage of Xstrata Zinc's extensive historical database, Donner and Xstrata Zinc Canada (Xstrata Zinc) are using a combination of 3D data integration, innovative advanced technologies, new concepts and diamond drilling to explore for new deposits in this prolific mining camp.

The Matagami Mining Camp is a world-class mining district, with 18 known VMS deposits, including 10 past producers of varying sizes, including the giant Matagami Deposit (25.64 million tonnes of 8.2% Zn, 0.56% Cu, 20.91 g/t Ag and 0.41 g/t Au) discovered in 1957 and mined from 1963 to 1988. The area is host to historical production of 8.6 billion pounds of Zn and 853 million pounds of Cu and has established infrastructure including the town of Matagami, a railway, a paved road, and a 2,350 t/day mill owned by Xstrata Zinc.

Throughout the Camp, mineralization occurs as bedded and pinnacle sulphides at the Key Tuffite (e.g. Matagami and Bell Allard Deposits) as well as vertical cone-shaped sulphide bodies hosted within the "Alteration Pipe" that occurs immediately below the Key Tuffite (e.g. Perseverance). Multiple, stacked mineralized zones and associated alteration pipes are now demonstrated (e.g. Bracemac). "Alteration Pipes" are identified by two styles of alteration; strong chlorite developed proximal to the hydrothermal vents and "Pipe style" characterized by intense chlorite with quartz stringers and local talc indicating the core of the hydrothermal vent system.

Donner has the option to earn a 50% participating joint venture interest in the Matagami Project by incurring a total of $20 million of expenditures on exploration and related work on or before May 31, 2011. Upon the expenditure of $20 million by Donner, five separate joint ventures will be formed, covering the property and the area of interest. In each of the five joint venture areas, Xstrata Zinc has the option to earn back a 15% interest in such area by incurring up to $20 million on a feasibility study.

Supplementary Information

The field work on the Matagami Project is being carried out by project operator Xstrata Zinc Canada who are responsible for the sampling QAQC and submittal of samples for assay. Assaying of samples reported in this news release was carried out and certified by ALS Chemex-Chimitec, of Val D'Or, Quebec (zinc, copper and silver by atomic absorption, and gold by standard fire assay procedures). Sample preparation was done by ALS Chemex of Val D'Or, Quebec. Robin Adair, VP of Exploration for the Company is the Qualified Person responsible for the technical information in this news release.

ON BEHALF OF THE BOARD OF DONNER METALS LTD.

Harvey Keats, Chief Executive Officer


Bracemac
---------------------------------------------------------------------------
            UTM              Zone                Core
       Location     Angle/   name -            length
DDH      NAD 83 direction Mineral                (met-    %     %  g/t  g/t
(Depth) Zone 18   (True N)   Type   From     To   res)   Cu    Zn   Ag   Au
---------------------------------------------------------------------------
---------------------------------------------------------------------------
BRC-
 86-                                                     Trace Pyrite and
 4 EXT-               -90                                Chalcopyrite at
 W                degrees/                               the KT No
(496m)  307182E,      000                                Significant
(ii)   5505970N   degrees      KT 920.70  921.5          Assays
---------------------------------------------------------------------------
BRC-                  -50
 07-              degrees/
 33     307387E,      018
(229m) 5505842N   degrees     UBZ  111.8  112.3  0.50  0.24  2.19  3.5 0.01
---------------------------------------------------------------------------
BRC-
 07-                  -50
 34               degrees/
(464-   307140E,      027
.5m)   5505854N   degrees      BZ 395.00 396.00  1.00  0.03  1.64  1.5 0.01
---------------------------------------------------------------------------
BRC-                  -50
 07-              degrees/
 35     307380E,      018
(157m) 5505875N   degrees  UBZ-MS  78.65  79.30  0.65  0.05 36.70 54.2 0.04
---------------------------------------------------------------------------
                           UBZ-MS  87.70  90.50   2.8  0.41 10.70 37.6 0.28
---------------------------------------------------------------------------
BRC-                  -69
 07-              degrees/
 36     307184E,     0.14
(814m) 5505829N   degrees   BZ-MS 372.25 377.00  4.75  0.91  0.58    9 0.06
---------------------------------------------------------------------------
                            BFW-S  427.0 434.00  7.00  0.11  1.85    4 0.02
---------------------------------------------------------------------------
BRC-                  -45
 07-              degrees/
 37     307280E,      027                                No Significant
(542m)  550510N   degrees                                Results
---------------------------------------------------------------------------
BRC-                  -45
 07-              degrees/
 38     307587E,      027   KT-MS+
(557m) 5505756N   degrees      SM  392.4  393.7   1.3  0.26 11.41 27.1 0.02
---------------------------------------------------------------------------
                including      MS  392.4  392.9   0.5  0.36 24.70 44.0 0.01
---------------------------------------------------------------------------
BRC-                  -45
 07-              degrees/
 39     307355E,      018
(295m) 5505865N   degrees  UBZ-MS  119.6  123.1   3.5  0.56  9.02 26.7 0.21
---------------------------------------------------------------------------

Zone: UBZ equals Upper Bracemac Zone, BZ (formerly "UT") equals Bracemac
      Zone, BFW equals Bracemac Zone Footwall, KT equals Key Tuffite, KTFW
      equals Key Tuffite Footwall.
Mineral Type: MS equals massive sulphides, SM equals semi-massive sulphides
              and S equals stringer sulphides, D equals disseminated
              sulphides.
Pipe equals Intense chlorite and talc alteration, +/- sulphide stringers.
(ii) - hole deepened to test KT drilled to test the Upper Bracemac and
       Bracemac Zones only.

True lengths (true widths) are anticipated to be 80% to 90% of the core
lengths.


West Flank
---------------------------------------------------------------------------
            UTM                                  Core
       Location     Angle/                     length
DDH      NAD 83 direction                        (met-    %     %  g/t  g/t
(Depth) Zone 18   (True N)   Zone   From     To   res)   Cu    Zn   Ag   Au
---------------------------------------------------------------------------
---------------------------------------------------------------------------
STH-
 01-                  -60
 07-              degrees/
 1      256327E,      010                                No significant
(268m) 5519154N   degrees                                results
---------------------------------------------------------------------------
---------------------------------------------------------------------------
STH-
 02-                  -45
 07-              degrees/
 1      256857E,      350                                No significant
(201m) 5518943N   degrees                                results
---------------------------------------------------------------------------
---------------------------------------------------------------------------
STH-
 03-                  -60
 07-              degrees/
 1      256553E,      015                                No significant
(250m) 5519872N   degrees                                results
---------------------------------------------------------------------------
 



The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.

CONTACT INFORMATION:

Donner Metals Ltd.
Harvey Keats
Chief Executive Officer
(604) 683-0564 or Toll Free: 1-800-909-8311
Fax: (604) 602-9311
Email: donner@bed-rock.com
Website: www.donnermetals.com

INDUSTRY: Manufacturing and Production - Mining and Metals

Footer

Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Sphinx Resources

EXPLORATEUR
CODE : SFX.V
ISIN : CA8484221012
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Sphinx est une société développant des projet miniers de zinc et de cuivre basée au Canada.

Sphinx est en développement de projets de zinc, de cuivre, d'argent et d'or au Canada.

Son principal projet en développement est PD1 au Canada et ses principaux projets en exploration sont SOUTH VOISEY BAY, WEST RAGLAN et MATAGAMI au Canada.

Sphinx est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 838 700 CA$ (670 585 US$, 638 839 €).

La valeur de son action a atteint son plus haut niveau récent le 26 août 2016 à 0,14 CA$, et son plus bas niveau récent le 06 décembre 2022 à 0,01 CA$.

Sphinx possède 83 870 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de Sphinx Resources
08/08/2013Announces Second Closing of Private Placement
08/08/2013=3A Donner Metals announces closing of private placement
09/07/2013=3A Financing Update
24/06/2013Announces Financing
14/11/2012Announces Closing of C$1,439,000 Final Tranche Private Place...
28/02/2012Increases Private Placement Financing
27/02/2012Announces C$10,000,000 Private Placement Financing
27/10/2011Announces C$2,440,000 of Private Placement Financings
27/07/2011$3 Million Private Placement
25/07/2011Funds Received, Private Placement Closed
13/07/2011Financing News
15/02/2010Additional Private Placement Closings
16/11/2009Private Placements close
14/05/2009Non-Brokered Financing
07/01/2008 $3.2 Million Private Placement Closed
17/12/2007 Private Placement Increased to $3.2 Million
07/12/2007 $2.0 Million Private Placement
Projets de Sphinx Resources
10/12/2013Donner Metals Acquires Option on Valmond Gold Property from ...
30/10/2013(Matagami)Matagami Exploration Joint Ventures Update
03/09/2013=3A Donner Forfeits Interest in Bracemac=2DMcLeod
13/08/2013=3A Donner Metals Bracemac=2DMcLeod Interest
13/08/2013Bracemac-McLeod Interest
31/07/2013=3A Donner Metals Mineralization Extended=2C New Copper Zone...
12/07/2013=3A Donner Metals Update on Production at Bracemac=2DMcLeod
12/07/2013Update on Bracemac-McLeod Production
22/05/2013More High-Grade at McLeod Deep
16/05/2013Production has started!
16/05/2013Production Commences at Bracemac-McLeod
01/11/2012Development and Exploration Update
05/09/2012Bracemac-Mcleod Continues on Target
06/07/2012Provides Exploration Drilling Update
06/07/2012=3A Higher Production at Bracemac=2DMcLeod
05/07/2012Higher Production at Bracemac-McLeod
22/02/2012(Matagami)Ltd=2E: New Drilling Continues to Demonstrate Potential of M...
16/01/2012Ltd=2E: Bracemac-McLeod Mine Development Continues to Track ...
25/10/2011Ltd=2E: Bracemac-McLeod Mine Development Tracking On Budget ...
26/04/2011(Matagami)Completes Earn-In on the Matagami Project
06/03/2011(Matagami)Bracemac-McLeod Ramp Moves Past 660 Metres
10/02/2011(Pd1) Matagami Project Advances as the PD1 Deposit Moves to Feasi...
12/07/2010(Matagami)Drilling Extends McLeod Deep Discovery
07/03/2010(Matagami)Bracemac-McLeod Update
16/02/2010(Matagami)McLeod Deep Discovery Expanded-7.50 Metres Grading 10.27% Zi...
23/11/2009(Matagami)Expanded Winter Drill Progam Initiated at Matagami
01/10/2009(Matagami)Bracemac-McLeod Feasibility Advances as Exploration Continue...
15/07/2009(Matagami) BRACEMAC-MCLEOD advances to feasibility
05/06/2009(Matagami)on BNN and Matagami Project Details
25/05/2009(Matagami)Drilling to Resume at Matagami; Scoping Study Nears Completi...
26/02/2009(Matagami)BRACEMAC-MCLEOD NI 43-101 INDICATED RESOURCE: 3,623,000 TONN...
26/02/2009(Matagami)UPDATED BRACEMAC-MCLEOD NI 43-101
11/02/2009(Matagami)featured on Minesite.com
26/01/2009(Matagami)NI43-101 Resource
23/01/2009(Matagami)INITIAL BRACEMAC-MCLEOD NI43-101 INDICATED RESOURCE
12/11/2008(Matagami)Assays Return High-Grade Zincand Copper from the McLeod Disc...
05/09/2008Provides Initial Results From a Single Drill Hole Program on...
27/05/2008(Matagami)Four New High GradeIntersections at Bracemac/McLeod Includin...
09/05/2008(Matagami)13.47% Zinc, 2.33% Copper Over 6.95 Metres Intersected at Br...
11/04/2008High Grade Discovered Between Bracemac and McLeod
03/03/2008New High Grade Intersections Expand Zones at Bracemac and Mc...
09/01/2008 Drilling Intersects 9.48% Zinc and 2.81% Copper Over 6.00
Communiqués de Presse de Sphinx Resources
30/12/2013Announces Completion of Share Consolidation
13/12/2013Announces Results From AnnualGeneral and Special Meeting and...
14/11/2013Annual and Special General Meeting
18/07/2013Announces Closing of C$2,807,010 Placement
08/07/2013=3A Copper Stream with Sandstorm Amended
08/07/2013Donner Metals Copper Stream With Sandstorm Amended
14/03/2013Announces Financial Support from Quebec Institutions
15/01/2013Stock Options Granted
01/11/2012Ltd=2E: Increased Upfront Paymen =?ISO-8859-1?Q?t=20From=20S...
22/10/2012Announces Results from Annual General Meeting, Head Office M...
22/10/2012Announces Results from Annual General Meeting, Head Office M...
04/10/2012Underground photos and video updates from Donner Metals
19/09/2012Ltd=2E: Mcleod Zone Extended Up-Dip: Exploration Drilling In...
28/08/2012=3A President's Message
17/04/2012Normand Champigny Appointed President of Donner Metals
23/02/2012Sandstorm Partners With Donner Metals
22/02/2012Ltd=2E: Development to Reach the McLeod Zone a Year Ahead of...
22/02/2012News Release
20/01/2012Join us at at the Vancouver Resource Show and Exploration Ro...
01/09/2011September Video update from Donner Metals
13/07/2011Sandstorm Provides US$25 Million Senior Financing
14/04/2010Definition Drill Program Completed at Bracemac-McLeod
03/02/2010$2,409,930 Financing Closed
30/01/2010Financing Increased
08/09/2009engineering contract and fast-tracked feasibility
24/08/2009Two Near Term Production Stories
22/06/2009Industrial Alliance Features Report on Donner Metals
19/05/2009A "Green Shoot" Rising
14/05/2009Is At The Starting Gate
26/02/2009Hotsheet
18/02/2009positioned for success
09/02/2009featured in Mining Journal
12/12/2008$1,048,000 Financing Closes
04/12/2008 AND XSTRATA ZINC CANADA WIN INTERNATIONAL EXPLORATION AWARD
25/11/2008$1.0 Million Financing
18/11/2008Donner Metals has fast-track potential says Reinhard
31/07/2008 Drilling Continues toDelineate and Expand Mineralization at...
01/08/2008Hotsheet for 7/31/2008
28/05/2008$3 Million Debenture Offering
27/05/2008Hotsheet for 5/27/2008
11/04/2008Hotsheet for 4/11/2008
20/03/2008March Chairman's Letter
05/03/2008Hotsheet for 3/5/2008
01/02/2008Engages Mau Capital to Provide Investor Relations
08/01/2008Hotsheet for 1/8/2008
07/12/2007Chairman's Letter
28/11/2007Expands Interest in Matagami Camp
08/11/2007Join us at the San Francisco Hard Assets Investment Conferen...
22/10/2007 Hotsheet for 10/21/2007
02/08/20076 New Massive Sulphide =?ISO-8859-1?Q?=20Intersections,=20In...
14/06/2007New Zinc-Copper Discover 9.24% Zinc, 0.99% Copper Over 27.95...
07/06/2007Bracemac Yields Additional Results With New Mineralization I...
11/04/2007Copper-Rich Massive Sulphides Intersected in BRC-07-32 in th...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (SFX.V)
0,010+0.00%
TSX-V
CA$ 0,010
06/12 09:30 -
0%
Cours préc. Ouverture
0,010 0,010
Bas haut
0,010 0,010
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,010 -%
Volume var. 1 mois
0 -%
24hGold TrendPower© : -9
Produit
Développe
Recherche Copper - Gold - Nickel - Palladium - Platinum - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 23/01/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
6,88 AU$+0,00%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
8,48 US$+0,83%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,60 GBX+1,88%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,05 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,05 CA$-0,49%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
11,53 CA$+0,52%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,30 CA$+3,39%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,18 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,54 CA$-3,75%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
41,40 US$+0,15%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :
Profitez de la hausse des actions aurifères
  • Inscrivez-vous à notre market briefing minier
    hebdomadaire
  • Recevez nos rapports sur les sociétés qui nous semblent
    présenter les meilleurs potentiels
  • Abonnement GRATUIT, aucune sollicitation
  • Offre limitée, inscrivez-vous maintenant !
Accédez directement au site.