Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
Cours Or & Argent

REDSTONE RESOURCES LIMITED

Publié le 30 juillet 2015

Drilling Preparations Underway at Tollu Project

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Copper | K Street |

Drilling Preparations Underway at Tollu Project

Microsoft Word - Draft 20150728_RDS_ASX_Preparation for Drilling Final.doc


30 July 2015
Company Announcements Office
Australian Stock Exchange Limited
20 Bridge Street
SYDNEY NSW 2000
Electronic Lodgement

$1.0 Million R&D Rebate Received

Drilling Preparations Underway at Tollu

Highlights and Key Activities Underway:

./ $1.0 Million R&D Rebate received
./ Programme of Works lodged
./ Native Vegetation Clearing Permit lodged
./ Drill contractor tendering process underway
./ Drilling activities planned to commence September 2015, pending receipt of heritage clearances and DMP approvals
./ Programme includes resource definition drilling targeting near surface oxide potential
./ Programme also includes potential to significantly expand global exploration target
./ Maiden copper JORC Resource for 100% owned Tollu Project is a priority outcome
Further to the ASX announcement of 9 June 2015, Redstone Resources Limited (ASX: RDS) ("Redstone" or the "Company") is pleased to advise that it has received a Research and Development tax offset of approximately $1.0 million from the Australian Tax Office (the "R&D Rebate"). Funds from the R&D Rebate will make a significant contribution to the Company's capital requirements over the next 12 months, which include drilling and exploration activities on the Company's 100% owned Tollu Copper Project (the "Project").
Subsequent to receipt of the R&D Rebate, the Company is now pleased to provide an update on the upcoming 2015 work programmes for the Project. Key activities undertaken to date include lodging the Programme of Works and Native Vegetation Clearing Permit for a staged drilling programme. This programme includes a targeted deep diamond drilling programme proposed to commence in September
2015. The extent of exploration activities undertaken in this campaign depends on the level of any further funding received.

Redstone Resources Limited ABN 42 090 169 154 www.redstone.com.au

60 Havelock Street, West Perth WA 6005 Tel: 08 9328 2552 Fax: 08 9328 2660 Email: [email protected]

ASX: RDS


Aim of the Programme
The initial works programme is aimed to achieve a maiden JORC resource and further develop our exploration techniques by:

1. Infill Reverse Circulation (RC) drilling programme - Targeting near surface hydrothermal copper (oxide and sulphide) mineralisation. The main activity will be concentrated on the known higher- grade zones at the Chatsworth, Main Reef and Eastern Reef prospects within the Tollu Project. A key outcome of this programme is to confirm the continuity of mineralisation and to deliver a maiden JORC resource, the size of which will depend on the amount of any further funding received.

2. Diamond (NQ) drilling programme - Targeting deeper high grade hydrothermal copper mineralisation. There is also an opportunity to significantly expand the size of the conceptual exploration target that presently exists at Tollu.

Redstone aims to complete the fieldwork component of this programme by October 2015.
Indicative Timetable
Redstone anticipates its planned activities to follow the indicative timetable below, however is mindful that a number of items are outside of its control, and hence this indicative timetable may be subject to change:

Milestone

July

2015

August

2015

September

2015

October

2015

POW Submitted

Native Vegetation Clearing Permit Submitted

Additional Funding

Drilling Contracts Tender & Award

DMP Approval

Native Vegetation Clearing Permit Approval

Heritage Clearance Approval

Drilling Programme

Redstone Resources Limited ABN 42 090 169 154 www.redstone.com.au

60 Havelock Street, West Perth WA 6005 Tel: 08 9328 2552 Fax: 08 9328 2660 Email: [email protected]

ASX: RDS


Tollu Project (Redstone 100%)
Redstone's 100% owned Tollu Project is located in the southeast portion of the West Musgrave region of Western Australia (Figure 1). The project is approximately 20km south east of the Blackstone Community on Company's 100% owned tenement E69/2450 (Figure 2).
The Tollu Project consists of a large swarm of hydrothermal copper rich quartz veins in a mineralised system covering an area at least 5km2. Malachite rich gossans associated with quartz veins are exposed at surface and form part of a dilatational system between two major structures within the Tollu Fault Zone.
The Tollu Project has a conceptual exploration target (the "Target") of 22 to 33 million tonnes of mineralisation at a conceptual grade range of 0.9 - 1.3% Cu. The initial focus is on the Chatsworth Prospect, the Eastern Reef Prospect, the Main Reef Prospect and the Dawyck Prospects.
The potential quantity and grade of the Target is conceptual in nature. It is important to note that there has been insufficient exploration to estimate a Mineral Resource and it is uncertain if further exploration will result in the estimation of a Mineral Resource.

Figure 1 - West Musgrave - Location Map Figure 2 - Tollu Project - Location Map

Competent Persons Statement
The information in this announcement that relates to exploration results was authorised by Mr Darryl Mapleson, a Principal Geologist and a full time employee of BM Geological Services, who are engaged as consultant geologists to Redstone Resources Limited. Mr Mapleson is a Fellow of the Australian Institute of Mining and Metallurgy. Mr Mapleson has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration to act as a competent person as defined in the 2012 edition of the "Australasian Code for reporting of Exploration results, Mineral Resources and Ore Reserves". Mr Mapleson consents to the inclusion in the report of the matters based on his information in the form
and context in which it appears.

Redstone Resources Limited ABN 42 090 169 154 www.redstone.com.au

60 Havelock Street, West Perth WA 6005 Tel: 08 9328 2552 Fax: 08 9328 2660 Email: [email protected]

ASX: RDS


ABOUT REDSTONE RESOURCES
Redstone Resources Ltd (ASX: RDS) is a Perth-based company focused on highly prospective copper exploration properties in the West Musgrave region of Western Australia.
Redstone's 100% owned Tollu Project is located in the southeast portion of the West Musgrave region of Western Australia. The Tollu Project consists of a large swarm of hydrothermal copper rich quartz veins in a mineralised system covering an area at least 5km2. Malachite rich gossans associated with quartz veins are exposed at surface and form part of a dilatational system between two major structures within the Tollu Fault Zone.
The Company has also identified the potential for a number of other projects on the Tollu tenement
(E69/2450) in addition to the Tollu Project.

For further information please contact:
Richard Homsany
Chairman
Redstone Resources Limited
+61 8 9328 2552 [email protected]
Andrew Rowell / Warrick Hazeldine Cannings Purple
+61 8 6314 6304 [email protected]

Redstone Resources Limited ABN 42 090 169 154 www.redstone.com.au

60 Havelock Street, West Perth WA 6005 Tel: 08 9328 2552 Fax: 08 9328 2660 Email: [email protected]

Lire la suite de l'article sur www.noodls.com

REDSTONE RESOURCES LIMITED

CODE : RDS.AX
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

REDSTONE RESOURCES Ltd. est une société d’exploration minière basée en Australie.

REDSTONE RESOURCES Ltd. détient divers projets d'exploration au Bresil et en Australie.

Ses principaux projets en exploration sont PONTAL au Bresil et BLACKSTONE RANGE et STRIPEYS en Australie.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Communiqués de Presse de REDSTONE RESOURCES LIMITED
29/07/2016Quarterly Activities and Cashflow Report
01/10/2015Full Year Statutory Accounts
07/09/2015Director Resignation and Appendix 3Z
03/08/2015Quarterly Activities and Cashflow Report
30/07/2015Drilling Preparations Underway at Tollu Project
13/03/2015Consolidated Financial Report For The Half-Year Ended 31 Dec...
30/01/2015Quarterly Activities and Cashflow Report
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
AUSTRALIA (RDS.AX)
0,004+0.00%
AUSTRALIA
AU$ 0,004
10/10 11:00 -
0%
Cours préc. Ouverture
0,004 0,004
Bas haut
0,004 0,004
Année b/h Var. YTD
- -  0,010 -60,00%
52 sem. b/h var. 52 sem.
- -  0,010 -42,86%
Volume var. 1 mois
0 -%
24hGold TrendPower© : -21
Produit
Développe
Recherche
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2024∞%0,010,00
2023-100,00%0,010,00
2022-42,86%0,020,01
20217,69%0,020,01
202062,50%0,060,00
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,24 AU$+0,76%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 +100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,06 US$+1,93%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,57 GBX-4,68%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+18,18%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,26 +6,10%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 +0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
14,59 +0,97%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,31 +3,33%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 -2,38%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
2,20 +4,27%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
42,96 US$+0,23%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :
Sun Res.(Oil)SUR.AX
Released ASX Announcement: Quarterly Activities Report
0,00 AU$+0,00%Trend Power :
Profitez de la hausse des actions aurifères
  • Inscrivez-vous à notre market briefing minier
    hebdomadaire
  • Recevez nos rapports sur les sociétés qui nous semblent
    présenter les meilleurs potentiels
  • Abonnement GRATUIT, aucune sollicitation
  • Offre limitée, inscrivez-vous maintenant !
Accédez directement au site.