Hathor
Drills 15.0 Metres Grading 10.02% U3O8
Hathor Exploration
Limited (TSX-V: HAT) is pleased to announce further U3O8
assay results for uranium mineralization encountered in diamond drill holes
completed on the Roughrider Zone at the Midwest NorthEast property, northern
Saskatchewan.
Highlights from these
newly-reported, high-grade U3O8 assayed core intervals*
(using a 0.05% U3O8 cutoff grade) listed in Tables 1 and
2 include:
·
15 m grading 10.02% U3O8,
including 2 m at 43.85% U3O8, in drill hole MWNE-08-20
·
9 m grading 10.06% U3O8,
including 3 m at 22.72% U3O8, and
5 m grading 3.58%
U3O8, including 1.5 m at 10.85% U3O8, in
drill hole MWNE-08-21
·
9.5 m grading 2.60% U3O8,
including 2 m at 10.39% U3O8, in drill hole MWNE-08-28
*All intersections are downhole thickness, true
thickness is yet to be determined
This winter, Hathor
completed 10,654 metres of diamond drilling in 29 NQ-sized, vertical and angled
diamond drill holes on its 90%- owned Midwest NE property. Terra Ventures Inc.
(TSX-V: TAS) owns a 10-per-cent production carried interest in the Midwest
NorthEast property.
The Roughrider Zone was discovered
in February, 2008 and results for discovery hole MWNE-08-12 were released in
Hathor’s news releases dated March 3 and April 25, 2008. For drill hole
location map, please visit Hathor’s website at: www.hathor.ca.
High-grade uranium
mineralization encountered in these drill holes occurs in basement rocks that
are a heterogeneous mix of variably clay-altered to clay-replaced pelitic
gneiss, graphitic pelitic gneiss, granitic pegmatite and microgranite. Vertical
depth to the unconformity is approximately 200 metres. It is important to note
that that the newest exploration model for Roughrider Zone uranium
mineralization indicates that the primary drill target, being where the
principal cross-cutting uranium-bearing structures intersect the unconformity,
has NOT YET BEEN TESTED. This new
target, sits to the northeast of the Roughrider Zone discovery hole and has
been defined by detailed resistivity and gravity surveys completed after this
year’s drill program.
A summer drill program
comprised of 15 holes is expected to begin in mid-June and will further test
the Roughrider Zone and other drill targets on the Midwest NE property.
Table 1: Mineralized
intersections* from the 2008 winter drill program are:
Drill
|
From
|
To
|
Interval
|
U3O8
|
Hole
|
(m)
|
(m)
|
(m)
|
(wt%)
|
|
|
|
|
|
MWNE-08-12
|
242.0
|
245.3
|
3.3
|
1.16
|
MWNE-08-12
|
250.6
|
256
|
5.4
|
2.07
|
MWNE-08-12
|
261.5
|
273.4
|
11.9
|
5.29
|
MWNE-08-12
|
278.0
|
281.0
|
3.0
|
0.06
|
MWNE-08-12
|
284.0
|
287.0
|
3.0
|
0.21
|
|
|
|
|
|
MWNE-08-16
|
216.6
|
218.8
|
2.2
|
0.62
|
MWNE-08-16
|
228.2
|
235.6
|
7.4
|
1.55
|
|
|
|
|
|
MWNE-08-17
|
219.0
|
222.5
|
3.5
|
0.49
|
|
|
|
|
|
MWNE-08-18
|
189.0
|
192.0
|
3.0
|
0.50
|
MWNE-08-18
|
205.0
|
206.0
|
1.0
|
0.12
|
MWNE-08-18
|
234.3
|
234.9
|
0.6
|
9.55
|
including
|
234.5
|
234.7
|
0.2
|
16.20
|
|
|
|
|
|
MWNE-08-19
|
240.0
|
241.0
|
1.0
|
0.32
|
MWNE-08-19
|
243.9
|
246.0
|
2.1
|
4.11
|
MWNE-08-19
|
283.0
|
285.0
|
2.0
|
0.44
|
|
|
|
|
|
MWNE-08-20
|
249.5
|
264.5
|
15.0
|
10.02
|
including
|
257.0
|
259.0
|
2.0
|
43.85
|
|
|
|
|
|
MWNE-08-21
|
241.0
|
250.0
|
9.0
|
10.06
|
including
|
245.5
|
248.5
|
3.0
|
22.72
|
MWNE-08-21
|
252.5
|
256.5
|
4.0
|
0.86
|
including
|
252.5
|
254.0
|
1.5
|
1.87
|
MWNE-08-21
|
259.5
|
264.5
|
5.0
|
3.58
|
including
|
262.5
|
264.0
|
1.5
|
10.85
|
|
|
|
|
|
MWNE-08-22
|
232.0
|
234.5
|
2.5
|
0.27
|
MWNE-08-22
|
240.5
|
241.0
|
0.5
|
0.16
|
MWNE-08-22
|
242.5
|
249.0
|
6.5
|
2.27
|
including
|
244.0
|
244.5
|
1.5
|
6.94
|
|
|
|
|
|
MWNE-08-23
|
232.5
|
233.5
|
1.0
|
0.72
|
MWNE-08-23
|
236.5
|
237.5
|
1.0
|
0.14
|
MWNE-08-23
|
243.5
|
245.0
|
1.5
|
2.48
|
MWNE-08-23
|
266.0
|
266.5
|
0.5
|
2.07
|
MWNE-08-23
|
279.5
|
281.5
|
2.0
|
0.26
|
MWNE-08-23
|
284.5
|
285.5
|
1.0
|
0.36
|
|
|
|
|
|
MWNE-08-24
|
253.0
|
257.0
|
4.0
|
1.10
|
MWNE-08-24
|
260.0
|
264.5
|
4.5
|
0.64
|
MWNE-08-24
|
268.0
|
271.5
|
3.5
|
0.77
|
MWNE-08-24
|
324.0
|
330.0
|
6.0
|
0.11
|
|
|
|
|
|
MWNE-08-26
|
245.0
|
246.5
|
1.5
|
0.25
|
MWNE-08-26
|
248.5
|
251.0
|
2.5
|
1.32
|
MWNE-08-26
|
257.0
|
261.0
|
4.0
|
0.41
|
MWNE-08-26
|
267.5
|
271.0
|
3.5
|
0.66
|
|
|
|
|
|
MWNE-08-28
|
218.0
|
227.5
|
9.5
|
2.60
|
including
|
219.5
|
221.5
|
2.0
|
10.39
|
MWNE-08-28
|
230.0
|
230.5
|
0.5
|
0.16
|
MWNE-08-28
|
241.0
|
242.0
|
1.0
|
0.25
|
|
*All intersections are downhole thickness, true thickness is yet to be determined.
Table 2: Ten highest individual drill core interval U3O8 assay results:
Drill
|
From
|
To
|
Interval
|
U3O8
|
Hole
|
(m)
|
(m)
|
(m)
|
(wt%)
|
MWNE-08-16
|
229.7
|
229.9
|
0.2
|
21.6
|
MWNE-08-20
|
257.0
|
257.5
|
0.5
|
55.8
|
MWNE-08-20
|
257.5
|
258.0
|
0.5
|
57.5
|
MWNE-08-20
|
258.0
|
258.5
|
0.5
|
44.8
|
MWNE-08-20
|
260.5
|
261.0
|
0.5
|
31.6
|
MWNE-08-20
|
262.0
|
262.5
|
0.5
|
20.1
|
MWNE-08-20
|
262.5
|
263.0
|
0.5
|
24.1
|
MWNE-08-21
|
243.5
|
244.0
|
0.5
|
28.1
|
MWNE-08-21
|
245.5
|
246.0
|
0.5
|
59.1
|
MWNE-08-21
|
246.0
|
246.5
|
0.5
|
42.0
|
Drill holes MWNE-08-13, MWNE-08-15,
and MWNE-08-29 were drilled away from the Roughrider Zone and did not intersect
uranium mineralization. Drill holes MWNE-08-14, MWNE-08-25, and MWNE-08-27 did
not intersect uranium mineralization and are interpreted to either have
under-cut or over-cut the mineralized zone.
All samples were analyzed
for U3O8 at the Geoanalytical Laboratories of the
Saskatchewan Research Council (SRC). The facilities used for the analysis
operate in accordance with ISO/IEC 17025:2005 (CAN-P-4E). The samples were
analyzed using ISO/IEC 17025:2005-accredited U3O8 method.
Laboratory method quality control included the insertion of certified reference
materials applicable for the ranges of mineralization encountered. Repeat
analyses were performed on every 25th sample. All repeat samples had
good reproducibility. All samples are being analyzed for a suite of other
elements including nickel, cobalt, copper and lead.
Benjamin Ainsworth., P.Eng., a qualified person as
defined by National Instrument 43-101, has reviewed and approved the technical
disclosure contained in this news release.
Hathor's Midwest
NorthEast project is located in Saskatchewan's
Athabasca basin, immediately adjacent to the Midwest
property of AREVA Resources Canada Inc., Denison Mines Corp. and OURD Canada
Co. Ltd. There, subject to regulatory approvals, mine site construction is
slated to begin in mid-2009 and open-pit mining of a shallow (depth of about
200 metres) orebody is planned for early 2010. Points North Landing, a regional
service centre to the region, is located about eight kilometres from Hathor's
Midwest Northeast property and the modern, AREVA-operated McClean
Lake uranium mill
facilities, are located approximately 10 kilometres to the east.
Hathor continues to
aggressively advance its portfolio of Athabasca
region uranium exploration projects. This area accounts for approximately 25
per cent of the world's annual mine production of uranium. All of this
production comes from unconformity-style uranium ore deposits, the highest-grade
uranium ore deposits in the world.
For more information on
Hathor, please visit the company's website: www.hathor.ca
or contact Stephen Stanley at 604-684-6707 or Tony
Nunziata at 403-560-7040.
Hathor Exploration
Limited
Stephen G. Stanley,
Director
The TSX Venture Exchange
has not reviewed and does not accept responsibility for the adequacy or
accuracy of the content of this news release
Cheers,
Natasha
Dutra, Office Manager
Hathor Exploration Limited
Suite 1910 -
925 West Georgia St.
Vancouver, BC V6C 3L2
T 604-684-6707
F 604-684-9277
www.hathor.ca