Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
Cours Or & Argent

Sphinx Resources

Publié le 28 novembre 2007

Expands Interest in Matagami Camp

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Zinc |

Marketwire

 
 
Donner Metals Ltd.
TSX VENTURE:DON
FRANKFURT:D4M
Other Recent News

November 28, 2007
Donner Expands Interest in Matagami Camp
VANCOUVER, BRITISH COLUMBIA--(Marketwire - Nov. 28, 2007) - Harvey Keats, Chief Executive Officer of Donner Metals Ltd. (TSX VENTURE:DON)(FRANKFURT:D4M), announces that Donner has entered into an agreement with Xstrata Canada Corporation - Xstrata Zinc Canada Division (Xstrata Zinc), whereby Xstrata Zinc has agreed to contribute additional mineral claims in the Matagami Camp to the existing Donner-Xstrata Zinc Option and Joint Venture Agreement ('OJVA').

Under the amendment agreement, all claims held by Xstrata Zinc in the Matagami Camp are now part of the OJVA, with the exception of the mineral claims covering the Perseverance deposits now under development by Xstrata Zinc. Included in the agreement are 1) mineral claims around past producers and existing infrastructure, 2) known mineralization at Orchan West, 3) the mineral claims between the original Mattagami Lake deposit and Perseverance (7 Kilometres), 4) the mineral claims around the Phelps Dodge deposit and other Phelps Dodge-Xstrata Zinc mineral claims and 5) several new other strategic blocks of claims acquired over the entire OJVA area.

As a result of the additions under the amendment agreement and staking since Donner entered into the OJVA in June 2006, the Matagami Project has grown from 2,065 mineral claims covering 477 square kilometres to 3,350 mineral claims covering 841 square kilometres.

Donner and Xstrata Zinc intend to apply the innovative exploration techniques that resulted in the recent significant discoveries at Bracemac and McLeod to the new areas of the OJVA. For example, Donner and Xstrata Zinc believe that Orchan West and Phelps Dodge both have potential for further exploration. Each has potential for additional sulphide development along strike as well as in vertically stacked mineralization similar to the mineralization discovered at Bracemac. A partial summary of previous exploration drilling at Orchan West and Phelps Dodge is provided in the attached tables.

Further, a significant area of strong exploration potential has been added along key mineralized/altered corridors between the historical deposits and Xstrata Zinc's Perseverance Deposit.

Pursuant to the terms of the revised OJVA, Donner has the option to earn a 50% participating Joint Venture interest in the Matagami Project by incurring a total of $20 million of expenditures on exploration and related work on or before May 31, 2011. Donner has made a firm expenditure commitment of $12 million (an increase of the committed portion of expenditures of $2 million), of which approximately $8 million has now been incurred. Donner has also agreed to contribute additional expenditures totaling up to $5 million towards establishing inferred resources on new discoveries, an increase of $2 million from the original agreement.

Upon the expenditure of $20 million by Donner, five separate joint ventures will be formed, covering the property and the area of interest. In each of the five joint venture areas, Xstrata Zinc has the option to earn back a 15% interest in such area by incurring up to $20 million on a feasibility study.

Xstrata Zinc has a 100% interest in all claims subject to the OJVA with the exception of 309 Phelps Dodge - Xstrata Zinc claims in which Phelps Dodge has 25.89% participating interest and 9 mineral claims covering the Phelps Dodge deposit which are subject to a 15% net carried interest.

ON BEHALF OF THE BOARD OF DONNER METALS LTD.

Harvey Keats, Chief Executive Officer


Orchan West - Historical Drill Results
--------------------------------------------------------------------------
                                                                      True
                                                                     Thick-
                                           Core                       ness
                                            len-                      Esti-
           Sec-                             gth                       mate
           tion   Lens     From       To   (met-             g/t  g/t (met-
Hole #     #         #  (metres) (metres)   res) % Zn % Cu    Ag   Au  res)
--------------------------------------------------------------------------
--------------------------------------------------------------------------
OR-91-13D  5180 E    1  1143.18  1146.69   3.51  9.62 0.33  5.86 0.11  2.0
--------------------------------------------------------------------------
OR-90-13   5150 E    1  1181.56  1193.60  12.04 14.34 1.02 18.11 0.37  5.0
--------------------------------------------------------------------------
OR-91-13C  5120 E    1  1179.91  1215.91  36.00 18.33 2.07 39.04 0.44  8.0
--------------------------------------------------------------------------
OR-91-15F  5090 E    1  1184.09  1189.66   5.57 18.85 1.00 17.64 0.28  4.0
--------------------------------------------------------------------------
OR-91-15B  5075 E    1  1198.26  1207.98   9.72  9.12 2.53 24.66 0.42  5.0
--------------------------------------------------------------------------
OR-91-15B  5075 E   1A  1289.12  1304.85  15.73 10.82 1.36 11.32 0.86  7.0
--------------------------------------------------------------------------
OR-91-15E  5060 E    1  1157.90  1164.18   6.28 14.34 3.22 59.15 0.67  4.0
--------------------------------------------------------------------------
OR-91-15G  5030 E    1  1191.07  1204.23  13.16 15.66 0.88 11.56 0.43  5.0
--------------------------------------------------------------------------
OR-96-26A  5000 E    2  1141.87  1149.55   7.68 14.00 2.64 18.23 0.31  6.0
--------------------------------------------------------------------------
OR-91-17   4970 E    2  1102.40  1107.70   5.30  7.01 4.05 88.51 0.81    ?
--------------------------------------------------------------------------
OR-91-17   4955 E    2  1140.01  1147.24   7.23 22.16 1.89 22.88 0.48  6.0
--------------------------------------------------------------------------
OR-96-22 D 4940 E    2  1172.47  1197.19  24.72 23.48 1.02 22.76 0.49 17.0
--------------------------------------------------------------------------
OR-96-22 E 4940 E    2  1151.66  1180.09  28.43 20.35 2.66 49.94 0.73 22.0
--------------------------------------------------------------------------
OR-96-22B  4910 E    2  1167.11  1173.24   6.13 14.17 1.63 37.70 0.62  5.0
--------------------------------------------------------------------------

Note 1: Lens 1 - mineralization at the Key Tuffite Horizon
Note 2: Lens 1A and 2 - mineralized spires in the alteration pipe
        crosscutting the Key Tuffite Horizon


Phelps Dodge - Historical Drill Results
--------------------------------------------------------------------------
                                                                      True
                                 Core                            Thickness
                               length                             Estimate
Hole #         From       To  (metres)  % Zn  % Cu g/t Ag g/t Au   (metres)
--------------------------------------------------------------------------
--------------------------------------------------------------------------
121G-01       52.58     57.3     4.72  10.14  1.38  32.80     NA         ?
--------------------------------------------------------------------------
121G-01       62.33    74.52    12.19   3.19  0.54  15.85     NA         ?
--------------------------------------------------------------------------
121G-02       92.05     95.1     3.05  21.32  0.71  37.15     NA         ?
--------------------------------------------------------------------------
121G-03       77.72    79.55     1.83  12.25  0.05  59.31     NA         ?
--------------------------------------------------------------------------
121G-03      105.92   108.97     3.05   9.70  0.23  27.28     NA         ?
--------------------------------------------------------------------------
121G-04       97.54   105.16     7.62   8.87  0.40  13.71     NA         ?
--------------------------------------------------------------------------
121G-05      106.68   123.44    16.76   3.78  0.53  25.58     NA         ?
--------------------------------------------------------------------------
121G-08      178.61   186.23     7.62   5.37  1.22  16.73     NA         ?
--------------------------------------------------------------------------
121G-10      170.99   175.56     4.57   4.26  0.15  10.74     NA         ?
--------------------------------------------------------------------------
121G-15      171.30   175.87     4.57   4.83  1.09  12.22     NA         ?
--------------------------------------------------------------------------
121G-15      181.97   186.54     4.57   6.08  1.03   7.77     NA         ?
--------------------------------------------------------------------------
121G-16      259.38   263.35     3.97   7.25  0.56  21.74     NA         ?
--------------------------------------------------------------------------
121G-16      270.97   292.30    21.33   4.43  1.41  17.32     NA         ?
--------------------------------------------------------------------------
121G-17      246.28   251.16     4.88   4.79  1.14  12.16     NA         ?
--------------------------------------------------------------------------
121G-17      252.83   261.21     8.38   0.07  5.70   9.29     NA         ?
--------------------------------------------------------------------------
121G-18      249.94   275.84    25.90   1.20  0.01   3.18     NA         ?
--------------------------------------------------------------------------
121G-18      270.66   271.27     0.61   9.64  0.15   9.60     NA         ?
--------------------------------------------------------------------------
121G-18      272.80   275.84     3.04   8.88  0.13  29.31     NA         ?
--------------------------------------------------------------------------
121G-18      280.42   283.46     3.04   0.14  1.75   9.60     NA         ?
--------------------------------------------------------------------------
121G-20      248.41   256.03     7.62   6.19  1.38  15.69     NA         ?
--------------------------------------------------------------------------
121G-20      259.08   265.18      6.1   0.04  2.59   6.17     NA         ?
--------------------------------------------------------------------------
121G-23      336.19   349.91    13.72   8.98  1.52  17.88     NA         ?
--------------------------------------------------------------------------
121G-23      354.48   365.76    11.28   0.06  2.70  14.24     NA         ?
--------------------------------------------------------------------------
121G-25      354.18   370.94    16.76   7.46  0.92  19.73     NA         ?
--------------------------------------------------------------------------
121G-26      224.94   234.70     9.76   5.23  0.45  33.63     NA         ?
--------------------------------------------------------------------------
121G-27      215.19   225.48    10.29   5.91  1.13  20.14     NA         ?
--------------------------------------------------------------------------
121G-28      335.58   348.08    12.50   7.65  0.95  16.99     NA         ?
--------------------------------------------------------------------------
121G-29      218.85   222.73     3.88   4.32  1.76  24.45     NA         ?
--------------------------------------------------------------------------
121G-31      203.61   209.49     5.88   2.45  0.54  14.54     NA         ?
--------------------------------------------------------------------------
121G-31      213.82   221.35     7.53   1.85  1.31  45.95     NA         ?
--------------------------------------------------------------------------
121G-31      229.36   234.39     5.03   7.11  1.42  27.37     NA         ?
--------------------------------------------------------------------------
121G-34      502.31   514.50    12.19   7.80  0.15   7.41     NA         ?
--------------------------------------------------------------------------
121G-37      298.55   307.70     9.15   2.66  2.05  40.84     NA         ?
--------------------------------------------------------------------------
121G-39      437.39   442.87     5.48   5.14  0.24  14.25     NA         ?
--------------------------------------------------------------------------
121G-42      415.29   418.80     3.51  10.10  0.68  19.01     NA         ?
--------------------------------------------------------------------------
121G-42      420.32   427.94     7.62   0.07  1.68  17.02     NA         ?
--------------------------------------------------------------------------
PD1-76-01     53.34    60.20     6.86   5.12  1.50  27.59     NA         ?
--------------------------------------------------------------------------
PD1-76-01     70.10    74.68     4.58   2.77  0.53  12.91     NA         ?
--------------------------------------------------------------------------
PD1-76-02      50.6    54.41     3.81   3.55  0.67  28.95     NA         ?
--------------------------------------------------------------------------
PD1-76-02     60.20    70.10      9.9   5.22  0.75  13.03     NA         ?
--------------------------------------------------------------------------
PD1-76-02     71.02    76.20     5.18   2.45  1.05  14.93     NA         ?
--------------------------------------------------------------------------
PD1-76-03     59.59    79.25    19.66   4.71  1.26  29.32     NA         ?
--------------------------------------------------------------------------
PD1-76-04     62.94    76.20    13.26   4.28  0.71  16.40     NA         ?
--------------------------------------------------------------------------
 



The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.

CONTACT INFORMATION:

Donner Metals Ltd.
Harvey Keats
Chief Executive Officer
(604) 683-0564 or Toll Free: 1-800-909-8311
Fax: (604) 602-9311
Email: donner@bed-rock.com
Website: www.donnermetals.com

INDUSTRY: Manufacturing and Production - Mining and Metals

Footer

Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Sphinx Resources

EXPLORATEUR
CODE : SFX.V
ISIN : CA8484221012
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Sphinx est une société développant des projet miniers de zinc et de cuivre basée au Canada.

Sphinx est en développement de projets de zinc, de cuivre, d'argent et d'or au Canada.

Son principal projet en développement est PD1 au Canada et ses principaux projets en exploration sont SOUTH VOISEY BAY, WEST RAGLAN et MATAGAMI au Canada.

Sphinx est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 838 700 CA$ (670 585 US$, 638 839 €).

La valeur de son action a atteint son plus haut niveau récent le 26 août 2016 à 0,14 CA$, et son plus bas niveau récent le 06 décembre 2022 à 0,01 CA$.

Sphinx possède 83 870 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de Sphinx Resources
08/08/2013Announces Second Closing of Private Placement
08/08/2013=3A Donner Metals announces closing of private placement
09/07/2013=3A Financing Update
24/06/2013Announces Financing
14/11/2012Announces Closing of C$1,439,000 Final Tranche Private Place...
28/02/2012Increases Private Placement Financing
27/02/2012Announces C$10,000,000 Private Placement Financing
27/10/2011Announces C$2,440,000 of Private Placement Financings
27/07/2011$3 Million Private Placement
25/07/2011Funds Received, Private Placement Closed
13/07/2011Financing News
15/02/2010Additional Private Placement Closings
16/11/2009Private Placements close
14/05/2009Non-Brokered Financing
07/01/2008 $3.2 Million Private Placement Closed
17/12/2007 Private Placement Increased to $3.2 Million
07/12/2007 $2.0 Million Private Placement
Projets de Sphinx Resources
10/12/2013Donner Metals Acquires Option on Valmond Gold Property from ...
30/10/2013(Matagami)Matagami Exploration Joint Ventures Update
03/09/2013=3A Donner Forfeits Interest in Bracemac=2DMcLeod
13/08/2013=3A Donner Metals Bracemac=2DMcLeod Interest
13/08/2013Bracemac-McLeod Interest
31/07/2013=3A Donner Metals Mineralization Extended=2C New Copper Zone...
12/07/2013=3A Donner Metals Update on Production at Bracemac=2DMcLeod
12/07/2013Update on Bracemac-McLeod Production
22/05/2013More High-Grade at McLeod Deep
16/05/2013Production has started!
16/05/2013Production Commences at Bracemac-McLeod
01/11/2012Development and Exploration Update
05/09/2012Bracemac-Mcleod Continues on Target
06/07/2012Provides Exploration Drilling Update
06/07/2012=3A Higher Production at Bracemac=2DMcLeod
05/07/2012Higher Production at Bracemac-McLeod
22/02/2012(Matagami)Ltd=2E: New Drilling Continues to Demonstrate Potential of M...
16/01/2012Ltd=2E: Bracemac-McLeod Mine Development Continues to Track ...
25/10/2011Ltd=2E: Bracemac-McLeod Mine Development Tracking On Budget ...
26/04/2011(Matagami)Completes Earn-In on the Matagami Project
06/03/2011(Matagami)Bracemac-McLeod Ramp Moves Past 660 Metres
10/02/2011(Pd1) Matagami Project Advances as the PD1 Deposit Moves to Feasi...
12/07/2010(Matagami)Drilling Extends McLeod Deep Discovery
07/03/2010(Matagami)Bracemac-McLeod Update
16/02/2010(Matagami)McLeod Deep Discovery Expanded-7.50 Metres Grading 10.27% Zi...
23/11/2009(Matagami)Expanded Winter Drill Progam Initiated at Matagami
01/10/2009(Matagami)Bracemac-McLeod Feasibility Advances as Exploration Continue...
15/07/2009(Matagami) BRACEMAC-MCLEOD advances to feasibility
05/06/2009(Matagami)on BNN and Matagami Project Details
25/05/2009(Matagami)Drilling to Resume at Matagami; Scoping Study Nears Completi...
26/02/2009(Matagami)BRACEMAC-MCLEOD NI 43-101 INDICATED RESOURCE: 3,623,000 TONN...
26/02/2009(Matagami)UPDATED BRACEMAC-MCLEOD NI 43-101
11/02/2009(Matagami)featured on Minesite.com
26/01/2009(Matagami)NI43-101 Resource
23/01/2009(Matagami)INITIAL BRACEMAC-MCLEOD NI43-101 INDICATED RESOURCE
12/11/2008(Matagami)Assays Return High-Grade Zincand Copper from the McLeod Disc...
05/09/2008Provides Initial Results From a Single Drill Hole Program on...
27/05/2008(Matagami)Four New High GradeIntersections at Bracemac/McLeod Includin...
09/05/2008(Matagami)13.47% Zinc, 2.33% Copper Over 6.95 Metres Intersected at Br...
11/04/2008High Grade Discovered Between Bracemac and McLeod
03/03/2008New High Grade Intersections Expand Zones at Bracemac and Mc...
09/01/2008 Drilling Intersects 9.48% Zinc and 2.81% Copper Over 6.00
Communiqués de Presse de Sphinx Resources
30/12/2013Announces Completion of Share Consolidation
13/12/2013Announces Results From AnnualGeneral and Special Meeting and...
14/11/2013Annual and Special General Meeting
18/07/2013Announces Closing of C$2,807,010 Placement
08/07/2013=3A Copper Stream with Sandstorm Amended
08/07/2013Donner Metals Copper Stream With Sandstorm Amended
14/03/2013Announces Financial Support from Quebec Institutions
15/01/2013Stock Options Granted
01/11/2012Ltd=2E: Increased Upfront Paymen =?ISO-8859-1?Q?t=20From=20S...
22/10/2012Announces Results from Annual General Meeting, Head Office M...
22/10/2012Announces Results from Annual General Meeting, Head Office M...
04/10/2012Underground photos and video updates from Donner Metals
19/09/2012Ltd=2E: Mcleod Zone Extended Up-Dip: Exploration Drilling In...
28/08/2012=3A President's Message
17/04/2012Normand Champigny Appointed President of Donner Metals
23/02/2012Sandstorm Partners With Donner Metals
22/02/2012Ltd=2E: Development to Reach the McLeod Zone a Year Ahead of...
22/02/2012News Release
20/01/2012Join us at at the Vancouver Resource Show and Exploration Ro...
01/09/2011September Video update from Donner Metals
13/07/2011Sandstorm Provides US$25 Million Senior Financing
14/04/2010Definition Drill Program Completed at Bracemac-McLeod
03/02/2010$2,409,930 Financing Closed
30/01/2010Financing Increased
08/09/2009engineering contract and fast-tracked feasibility
24/08/2009Two Near Term Production Stories
22/06/2009Industrial Alliance Features Report on Donner Metals
19/05/2009A "Green Shoot" Rising
14/05/2009Is At The Starting Gate
26/02/2009Hotsheet
18/02/2009positioned for success
09/02/2009featured in Mining Journal
12/12/2008$1,048,000 Financing Closes
04/12/2008 AND XSTRATA ZINC CANADA WIN INTERNATIONAL EXPLORATION AWARD
25/11/2008$1.0 Million Financing
18/11/2008Donner Metals has fast-track potential says Reinhard
31/07/2008 Drilling Continues toDelineate and Expand Mineralization at...
01/08/2008Hotsheet for 7/31/2008
28/05/2008$3 Million Debenture Offering
27/05/2008Hotsheet for 5/27/2008
11/04/2008Hotsheet for 4/11/2008
20/03/2008March Chairman's Letter
05/03/2008Hotsheet for 3/5/2008
01/02/2008Engages Mau Capital to Provide Investor Relations
08/01/2008Hotsheet for 1/8/2008
07/12/2007Chairman's Letter
28/11/2007Expands Interest in Matagami Camp
08/11/2007Join us at the San Francisco Hard Assets Investment Conferen...
22/10/2007 Hotsheet for 10/21/2007
02/08/20076 New Massive Sulphide =?ISO-8859-1?Q?=20Intersections,=20In...
14/06/2007New Zinc-Copper Discover 9.24% Zinc, 0.99% Copper Over 27.95...
07/06/2007Bracemac Yields Additional Results With New Mineralization I...
11/04/2007Copper-Rich Massive Sulphides Intersected in BRC-07-32 in th...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (SFX.V)
0,010+0.00%
TSX-V
CA$ 0,010
06/12 09:30 -
0%
Cours préc. Ouverture
0,010 0,010
Bas haut
0,010 0,010
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,010 -%
Volume var. 1 mois
0 -%
24hGold TrendPower© : -9
Produit
Développe
Recherche Copper - Gold - Nickel - Palladium - Platinum - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 23/01/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
6,88 AU$+0,00%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
8,48 US$+0,83%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,60 GBX+1,88%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,05 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,05 CA$-0,49%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
11,53 CA$+0,52%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,30 CA$+3,39%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,18 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,54 CA$-3,75%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
41,40 US$+0,15%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :
Profitez de la hausse des actions aurifères
  • Inscrivez-vous à notre market briefing minier
    hebdomadaire
  • Recevez nos rapports sur les sociétés qui nous semblent
    présenter les meilleurs potentiels
  • Abonnement GRATUIT, aucune sollicitation
  • Offre limitée, inscrivez-vous maintenant !
Accédez directement au site.