Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
Cours Or & Argent

Selwyn Resources Ltd.

Publié le 24 septembre 2009

Expands XY High-Grade Mineral Potential

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Zinc |
Selwyn Resources News Releases - September 24, 2009 - News Release - Selwyn Resources Expands XY High-Grade Mineral Potential
Can't read this email?
September 24, 2009

News Release

Selwyn Resources Expands XY High-Grade Mineral Potential

Vancouver, BC, September 24, 2009 � Selwyn Resources Ltd. (SWN..TSX-V) is pleased to provide an update on 2009 drilling activities in the XY area of the Selwyn Project. Two drill holes were completed as part of the geotechnical drilling program. The location of the drill holes can be found on drill plan maps available at www.selwynresources.com. Drilling has resumed to follow up on these results and to test additional targets in the XY Central deposit area.

Highlights

  • XYC-181 intersected 5.73 metres true thickness at a shallow depth grading 14.20% zinc and 3.74% lead, including 1.72 metres grading 28.66% zinc and 7.54% lead.

Geotechnical Drilling

The 2009 geotechnical drilling, in vicinity of the XY Central high-grade underground deposit, was undertaken to provide rock structure data pertinent to the design for an advanced exploration decline that would provide access for drilling the known mineralization, as well as the exploration targets deep in the core of the Synclinal Structure hosting the XY area deposits. The proposed decline and lateral drifts will provide a cost effective platform for testing these deep exploration targets. A total of two diamond drill holes were completed along the trace of the decline for a total of 695.70 metres.

Although the geotechnical drill holes were not designed to intersect the zinc-lead bearing Active Member, drill hole XYC-181 intersected a fault bounded 5.73 metres true thickness of Active Member approximately 70 metres southeast of the northwest edge of the 2009 mineral resource estimate block model (see February 29, 2009 news release). The location of this fault zone along the lower contact of the Active Member suggests that it is possible this drill hole did not fully test the mineral potential in this area because there was Active Member broken-up within the entire fault zone.

The mineralization in XYC-181 is consistent with results from two previous drill holes, XYC-142 and XYC-145; both located approximately 140 metres to the southeast from XYC-181. These two drill holes intersected similar widths and grade of well mineralized zinc-lead Active Member. XYC-142 intersected 14.25 metres true thickness of Active Member grading 10.03% zinc and 2.75% lead including 1.79 metres grading 44.90% zinc and 10.42% lead (October 30, 2006). XYC-145 intersected 11.96 metres true thickness of Active Member grading 8.76% zinc and 2.64% lead including 3.58 metres grading 20.84% zinc and 6.06% lead (January 10, 2007 news release). The assay results from the XYC-181 are presented in Table 1. Additional drilling in the vicinity of XYC-142, XYC-145, and XYC-181 is in progress.

Table 1

Drill Hole From
(m)
To
(m)
Thickness
(m)
Pb
(%)
Zn
(%)
Pb+Zn
(%)
True Thickness
(m)
 XYC-181  206.00 215.30 9.30  3.74 14.20 17.94 5.73
 Including  206.00  208.80 2.80  7.54  28.66  36.20  1.72
 Including  213.30  215.30 2.00   3.26  14.04  17.31  1.23

 The intercept in XYC-181 is significant because it means the NI 43-101 compliant underground high-grade mineral resource at XY Central deposit (January 29, 2009 news release) remains open for expansion in a northwesterly direction towards the newly discovered NI 43-101 compliant underground high-grade mineral resource at the XY West deposit (see February 29, 2009 news release).

The January 2008, NI 43-101 compliant underground high-grade mineral resource at XY Central was done by Independent Qualified Person, Cliff Pearson, P.Geo., and Non-Independent Qualified Person, John J. O�Donnell, P.Geo. (see January 29, 2008 news release). This study yielded an Indicated mineral resource in the high-grade underground deposit of 10,738,000 tonnes grading 10.38% zinc and 4.41% lead and an Inferred mineral resource of 2,849,000 tonnes grading 10.86% zinc and 4.41% lead. The February 2009 NI 43-101 compliant mineral resource estimate saw no changes in the XY Central area, but did provide a mineral resource estimate for the XY West deposit. This study was done by Non-Independent Qualified Person John J. O�Donnell, P.Geo. (see February 26, 2009 news release) and yielded an Inferred mineral resource of 1,917,600 tonnes grading 7.70% zinc and 2.45% lead. The XY West deposit remains open for expansion of its mineral potential.

The new target area between the underground high-grade mineral resources of XY Central and XY West deposits is approximately 500 metres in length, by 200 metres in width and 6 metres in true thickness. The possible quantity and grade of this mineral potential in the new target area is conceptual in nature, as there has been insufficient drilling to define a mineral resource and it is uncertain if additional exploration will result in any of this potential being realized as a mineral resource. However, one reason to be very confident about additional drilling in this new target area is that a historic drill hole successfully completed by a former operator intersected 3.05 metres of well mineralized zinc-lead Active Member in XYC-095; which graded 6.30% zinc and 1.90% lead. This historic drill hole is located 400 metres northwest of XYC-181 and the Active Member in both drill holes remains open for expansion in this area.

Recent modeling of Selwyn�s detailed 3D geological model, including XYC-181, reveals that the NI 43-101 compliant mineral resources for both the underground high-grade deposits at XY Central and at XY West remain open in all directions for expansion. Although these mineralizing systems are bounded by fault structures that commonly offset the zinc-lead mineralized Active Member, the new intersection in XYC-181 confirms the accuracy of the detailed 3D geological model that is being used to define extensions to the known mineralization.

The Selwyn Project exploration program is being reviewed by Vice President Exploration, Mr. Jason Dunning, M.Sc.., P.Geo. The onsite activities for the Selwyn Project are directed by Exploration Manager, John J. O�Donnell, P.Geo. Both Mr. Dunning and Mr. O�Donnell are Qualified Persons within the meaning of National Instrument 43-101. All assay data has been through internal validation of quality assurance and quality control. Selwyn has established a sampling and assay control program with blind insertion of assay blanks, standards and duplicates for the Selwyn Project; however, it should be noted that there is also a quality control and quality assurance program in place at ACME Analytical Laboratories Ltd. (�ACME�) that includes blanks, duplicates and standards. At ACME, silver and base metal analyses are conducted by a 23-element, four-acid digestion, ore-grade ICP-AES technique.

Selwyn�s focus is the exploration of its properties that make up the Selwyn Project in the Yukon, which hosts large tonnages of zinc-lead mineralization. The known deposits have the potential for the large scale production, and provide a secure supply of zinc and lead to meet the future needs of the zinc market in Asia and beyond.

This press release contains forward-looking statements concerning mineralization at the Selwyn Project. These forward- looking statements are based on assumptions and judgments of management regarding future events or results that may prove to be inaccurate as a result of exploration and other risk factors beyond Selwyn�s control. As a result, actual results may differ materially from the expected results. Additional drilling is required to confirm the potential of the new discovery areas and expansions of the current resource areas and the extension of the higher grade deep mineralization to depth. There is no assurance that such additional drilling will expand mineral resources or that the resources being defined can be developed as an economically attractive mine, and there are many uncertainties associated with permitting and other factors that could delay such development.

 

-30-


For more information contact:
Dr. Harlan Meade, President and CEO
Jasmin TamDoo, Manager of Investor Communications
Telephone: (604) 801-7240
Toll-free: 1-888-989-9188
Facsimile: (604) 689-8355
info@selwynresources.com
www.selwynresources.com


Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Copyright � 2009 Selwyn Resources Ltd.

 

. <

Selwyn Resources Ltd.

PRODUCTEUR
CODE : SWN.V
ISIN : CA81662B1040
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Selwyn Res. est une société développant des projet miniers de zinc et de plomb basée au Canada.

Selwyn Res. détient divers projets d'exploration au Canada et au Mexique.

Son principal projet en production est SCOTIA MINE - au Canada, ses principaux projets en développement sont SELWYN / HOWARD PASS et HOWARD'S PASS au Canada et ses principaux projets en exploration sont GETTY DEPOSIT au Canada et VINATA au Mexique.

Selwyn Res. est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 4,7 millions CA$ (3,5 millions US$, 3,2 millions €).

La valeur de son action a atteint son plus bas niveau récent le 21 novembre 2008 à 0,04 CA$, et son plus haut niveau récent le 11 mars 2011 à 4,88 CA$.

Selwyn Res. possède 3 940 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Selwyn Resources Ltd.
25/02/2008Zinc Markets, the perfect storm ?
Financements de Selwyn Resources Ltd.
13/01/2012Announces $4 Million Flow-Through Share Financing
24/08/2011Announces US$30 Million Bond Financing for ScoZinc Mine Rest...
09/06/2011Completes $12,784,500 Special Warrant Offering
01/06/2011Announces Closing of the Second Tranche of its Special Warra...
27/05/2011Announces Closing of the First Tranche of Its Special Warran...
17/06/2010Announces up to $3 Million Non-brokered Flow-through and Uni...
24/12/2009 Announces Up to $1,000,000 Non-brokered Flow-through Financ...
16/09/2009Increase Up to $7,092,000 Non-brokered Share Financing
08/09/2009Up to $6 Million Non-brokered Share Financing
14/05/2009Closing of $250,000 Non-brokered Flow-through Financing
23/10/2007Announces Closing of $3,150,000 Non-brokered Flow-Through Fi...
Attributions d'options de Selwyn Resources Ltd.
15/08/2009Grants Stock Options
Nominations de Selwyn Resources Ltd.
22/04/2013Announces Resignation of A. Jay Collins as a Director
12/03/2013Announces Appointment of New Manager of Investor Communicati...
24/09/2012Appoints Directors to Its Board
24/02/2011Expands Management Team
07/07/2009Appointment of Korea Zinc Representative to Board
Projets de Selwyn Resources Ltd.
14/06/2013New Mine Plan for ScoZinc Project Filed on SEDAR
11/06/2013Announces Updated ScoZinc Mine Plan
04/06/2013Announces Completion of Sale of Selwyn Project
20/04/2013to Hold Vote on Sale of Selwyn Project Only on April 22, 201...
22/08/2012s Revised Mine Development Plan for the Selwyn Project
23/05/2012Receives Approval for ScoZinc Mine Expansion
11/05/2012=E2??s Assays Confirm High-Grade Mineralization at Don Conne...
30/04/2012Chihong Receives Howard=E2??s Pass Mine Access Road Licence
16/04/2012Drilling in Don Connector Confirms Thick Zinc-Lead Mineraliz...
17/02/2012Acquires Surface Rights for Expansion at ScoZinc Mine
11/10/2011Receives Environmental Approval for ScoZinc Mine
19/09/2011New High-Grade Discovery Mineralization Extends XY West to t...
06/09/2011Significantly Expands XY West Deposit
16/08/2011Deep Drilling at Don Deposit Defines New Mineral Potential i...
11/08/2011Mobilizes Drills to ScoZinc Mine
06/07/2011Supreme Court of Yukon Dismisses Liard First Nation Applicat...
07/06/2011Don Deposit - Significant Potential at Depth Confirmed
01/06/2011Announces Completion of Acquisition of ScoZinc Limited
25/04/2011Chihong Receives B Water License: Project Update
04/04/2011Successfully Completes Winter Mobilization of Mining Equipme...
01/04/2011(Scotia Mine -)Announces Equity Financing of Up to $15 Million for Scotia M...
16/03/2011Commences Winter Mobilization of Mining Equipment
22/02/2011(Scotia Mine -)Signs Binding Agreement to Acquire ScoZinc Limited
15/02/2011(Selwyn / Howard Pass)Intercepts Thick High-Grade Mineralization in XY Central Dep...
07/10/2009(Vinata)Announces the Commencement of Drilling on Vinata Property
24/09/2009(Howard's Pass)Expands XY High-Grade Mineral Potential
13/08/2009(Vinata)Receives Regulatory Approval of Vinata Property Acquisition
29/01/2008Announces 2008 Mineral Resources and Expanded High-Grade Und...
15/01/2008Don East Deposit Continues to Expand Mineral Potential
10/01/2008Infill Drilling Confirms Higher-Grade XY Open Pit
04/09/2007 Announces Significant Step-out on High-grade in Don Valley
Communiqués de Presse de Selwyn Resources Ltd.
25/08/2015Selwyn Announces Board Changes and Grant of Stock Options
19/02/2015Selwyn Announces Grant of Incentive Stock Options
17/01/2015Selwyn Announces Failure of Scotian to Close ScoZinc Sale Tr...
30/12/2014IIROC Trading Resumption - SWN
30/12/2014Selwyn Announces Further Extension to Closing of Sale of Sco...
22/12/2014IIROC Trading Halt - SWN
24/11/2014IIROC Trading Resumption - SWN
21/11/2014Selwyn Announces Extension to Closing of Sale of ScoZinc
18/11/2014IIROC Trading Halt - NSP; SWN
29/10/2014Selwyn Announces Annual General and Special Meeting Results
10/09/2014Selwyn Res Ltd. IIROC Trading Resumption - SWN
10/09/2014Selwyn Announces Definitive Agreement for the Sale of ScoZin...
10/09/2014IIROC Trading Halt - SWN
02/06/2014Selwyn Appoints Victor Lazarovici Chairman of the Board
18/06/2013Announces Annual General and Special Meeting Results
12/06/2013Announces Repayment of Waterton Loan Facility
07/06/2013Addresses Statements Made in Dissident Circular
23/05/2013Important Notice
21/05/2013Announces Closing Date for the Sale of Selwyn Project and Pr...
13/05/2013Announces Satisfaction of Additional Closing Conditions for ...
29/04/2013Announces Date of Annual and Special Meeting
23/04/2013Responds to Press Release from Samara Capital Regarding Purp...
16/04/2013Announces Change of Venue for Annual General and Special Mee...
09/04/2013Announces Receipt of Second $5 Million Purchase Price from C...
18/02/2013Announces New Vice President of Exploration
24/10/2012Grants Stock Options
12/10/2012Announces Changes to its Management
10/10/2012Updated Gays River Deposit Mineral Resource Technical Report...
27/09/2012d Selwyn Project Mineral Resource Technical Report Filed on ...
10/09/2012Announces Changes to its Board
06/09/2012Suspends Strategic Review Process
13/08/2012Announces Updated Mineral Resource For Selwyn Project
19/07/2012Announces Selwyn Chihong Agreement with Kaska Communities
28/05/2012Joint Venture To Evaluate A Smaller Tonnage High-Grade Mine ...
15/05/2012Announces Updated Mineral Resource For XY West Deposit
14/05/2012Announces Special and Annual General Meeting Results
03/05/2012Announces Management Reorganization
18/04/2012Chihong Agreement with Naha Deh=C3=A9 Dene
17/04/2012Progress Update
17/04/2012Announces Closing of Debt Facility
10/04/2012Announces $10 Million Debt Facility
28/03/2012Metallurgical Drilling Further Defines Thick High-Grade Mine...
26/03/2012RETAINS CUTFIELD FREEMAN
12/03/2012Expands Airborne Geophysical Survey for Nova Scotia Properti...
02/02/2012Commissions Airborne Geophysical Survey for Nova Scotia Prop...
13/09/2011ANNOUNCES UPDATED MINERAL RESOURCES FOR SELWYN PROJECT
30/08/2011=?UTF-8?Q?Selwyn=E2=80=99s_ScoZinc_(Restart)_Projec?=t Deliv...
22/08/2011Announces Termination of the Proposed 24 Million Share Offer...
16/08/2011Expands Management Team
19/07/2011Continues To Confirm Don Deposit Mineralization
11/07/2011Announces Acceptance of Prospectus by Regulatory Authorities
07/07/2011Announces Korea Zinc Warrants Exercise
05/07/2011-Drilling on Don Deposit Continues to Confirm Continuity
07/06/2011Don Deposit-Significant Potential at Depth Confirmed
02/06/2011Announces Transamine Shareholding
17/05/2011Announces Pricing and Change to Equity Financing of up to $1...
09/05/2011Closing of the Acquisition of the Assets of ScoZinc Extended...
19/04/2011Expands Management Team
06/04/2011Announces Scotia Mine Mineral Resources
06/04/2011High Grade Drill Results Continue from Don Deposit
01/04/2011Intercepts High-Grade Mineralization in Don Deposit
30/03/2011(Getty Deposit)Announces Getty Deposit Mineral Resources
17/02/2011Exercises Savant Common Share Purchase Warrants
27/01/2011Announces Intention to make a Normal Course Issuer Bid
28/07/2010$650,000 Closing of Second Tranche of Financing
08/07/2010Announces Chihong Approvals for Selwyn Project
16/06/2010 Closes $562,500 Unit Financing
06/05/2010 Enters into Cooperation Agreement with Tulita District Land...
02/03/2010Updates progress on joint venture transaction with Yunnan Ch...
15/12/2009 C$100 Million Joint Venture Transaction With Yunnan Chihong...
15/12/2009Corporate Update Teleconference
29/10/2009Announces Receipt of Class A Land Use Permit from the Sahtu ...
23/10/2009$960,000 Closing of Second Tranche of Financing
30/09/2009$6.132 Million Closing of First Tranche of Financing
21/07/2009Advances the Selwyn Project
03/06/2009$2.25 Million Closing of First Tranche of Unit Financing
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (SWN.V)FRANKFURT (P3Z.F)
1,20+0.00%0,078-1.27%
TSX-V
CA$ 1,20
30/09 15:52 -
0%
Cours préc. Ouverture
1,20 1,20
Bas haut
1,20 1,20
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  1,20 -%
Volume var. 1 mois
400 -%
24hGold TrendPower© : -27
Produit Lead - Zinc
Développe Lead - Zinc
Recherche Lead - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 23/01/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
6,94 AU$-1,14%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
8,41 US$-3,67%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,59 GBX+1,21%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,05 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,06 CA$-0,96%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
11,47 CA$-4,50%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,30 CA$-1,67%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,18 AU$+5,71%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,60 CA$-3,03%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
41,34 US$-1,76%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :
Profitez de la hausse des actions aurifères
  • Inscrivez-vous à notre market briefing minier
    hebdomadaire
  • Recevez nos rapports sur les sociétés qui nous semblent
    présenter les meilleurs potentiels
  • Abonnement GRATUIT, aucune sollicitation
  • Offre limitée, inscrivez-vous maintenant !
Accédez directement au site.