Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
Cours Or & Argent

Primero Mining Corp

Publié le 20 juillet 2015

Primero Provides Exploration Update; Expects to Replace Full-Year Production With Drilling ...

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Cobalt | Copper | G Mexico | Precious Metals | Primero |

Primero Provides Exploration Update; Expects to Replace Full-Year Production With Drilling From First Half of 2015

TORONTO, ON--(Marketwired - July 20, 2015) - Primero Mining Corp. ("Primero" or the "Company") (TSX:P.TO) (PPP) today provided an update on its recent exploration activities at the Black Fox Complex, located near Timmins, Ontario, Canada, and at the San Dimas mine located in Durango, Mexico. Based on the success of its exploration activities to date, the Company expects to replace its estimated full-year production with the results of exploration drilling from the first half of 2015. Additionally, the Company has approved US$6.1 million in capital expenditures to advance a ramp to access the Deep Central Zone at Black Fox.

Highlights:

  • Black Fox Deep Central Zone Expanded: Results from the Deep Central Zone including 16.1 grams per tonne ("g/t") gold over 8.8 metres (520-L482-01), 11.0 g/t gold over 10.0 metres (520-L482-52) and 9.0 g/t gold over 11.7 metres (520-EX401-24) have expanded the known width of the high-grade mineralization.
  • Grey Fox Continues to Grow: Highlights include 9.4 g/t gold over 12.9 metres (GF15-1019) near-surface at Contact Zone, 18.8 g/t gold over 6.0 metres (GF14-975) at Grey Fox South, and 3.3 g/t gold over 39.0 metres (GF15-1011) at Gibson South.
  • Black Fox Ramp to Deep Central Zone Approved: Based on its exploration success in the Deep Central Zone, the Company has approved capital expenditures of US$6.1 million to advance the access ramp to this area by late 2015.
  • San Dimas' Jessica Vein Extended to 300 metres: Highlights include 47.2 g/t gold and 5,994 g/t silver over 4.6 metres (SJE15_007), 59.3 g/t gold and 7,992 g/t silver over 2.3 metres (SJE15_017) and 61.3 g/t gold and 8,795 g/t silver over 1.1 metres (SJ15_040)
  • Ventanas Scoping Study Commenced: Based on its exploration success at the Ventanas property in Mexico, the Company has commenced an internal scoping study to determine the viability of producing 500 to 1,000 tonnes per day of ore feed, which is not subject to the silver purchase agreement with Silver Wheaton Corp., for the San Dimas mill.

"Our 2015 exploration program has been very successful so far," commented Joseph F. Conway, Chief Executive Officer. "Exploration drilling during the first half of 2015 is expected to have already replaced our estimated full-year production at both Black Fox and San Dimas. Drilling at the Black Fox mine has expanded the mineralization in the Deep Central Zone and importantly indicates that mineralization is continuous between the current production level and at least 800 metres below surface. Exploration has been focused on delineating mineralization between the current 560 metre production level, which has an average grade of approximately 6.0 grams per tonne, and the Deep Central Zone with higher-grade mineralization extending to 800 metres, currently with an average grade of approximately 8.5 grams per tonne. As we continue to drill deeper at Black Fox we are encountering higher average grades and wider continuity, which is very promising for the future of the mine. In addition, drilling at San Dimas continues to expand the recently discovered Jessica vein and also delineate other high-grade veins such as Victoria and Perez."

BLACK FOX - CANADA

Expanding the High-Grade Deep Central Zone


Today Primero announced drilling results through the end of May 2015 from the Black Fox mine. These results indicate that the Company has expanded the high-grade mineralization in the Deep Central Zone between the 600 metre level and the 800 metre level. This area remains open along strike and down dip and is expected to continue to expand with the results of additional drilling.

The Company has also materially in-filled the gap between the current mining level, at 560 metres, and the top of the Deep Central Zone at the 600 metre level. Drilling is focused on delineating the necessary tonnes per level to maximize returns for the ramp construction to this higher grade, more continuous Deep Central Zone, currently estimated at approximately 8.5 g/t.

Based on these exploration results, Primero expects to replace its estimated full-year 2015 production from Black Fox.

Underground exploration drilling results are included in Table 1 with locations identified in Figure 1.

Table 1: Black Fox - Highlighted H1 2015 Underground Exploration Drilling Results

         
Hole From
(m)
To
(m)
Core Length
(m)
Gold Grade
(g/t)
520-EX38-E 265.1 267.2 2.1 14.1
520-EX44-E 334.0 336.0 2.0 15.6
 and 340.0 344.0 4.0 15.8
520-EX401-24 330.3 342.0 11.7 9.0
520-EX401-32 325.0 328.1 3.1 6.4
520-EX401-46 360.5 364.0 3.5 5.3
520-L401-31 316.8 320.3 3.5 16.3
520-L401-38 327.3 329.5 2.2 18.9
520-L401-48 326.0 327.8 1.9 8.5
 and 332.8 337.5 4.8 6.3
520-L401-57 346.7 349.0 2.3 7.7
520-L482-01 312.2 314.3 2.1 7.1
 and 319.6 321.0 1.4 23.3
 and 325.5 334.3 8.8 16.1
520-L482-02 317.4 321.4 4.0 9.6
520-L482-03 315.6 319.4 3.8 8.0
 and 327.9 331.6 3.7 12.1
520-L482-09 301.5 304.5 3.0 9.6
 and 307.1 312.8 5.6 7.4
520-L482-10 298.9 307.4 8.5 9.5
520-L482-16 318.1 322.2 4.1 9.0
520-L482-20 306.5 308.2 1.6 6.7
 and 311.2 315.0 3.8 13.9
 and 318.3 322.6 4.3 6.5
520-L482-21 309.3 314.6 5.3 7.5
 and 320.2 321.2 1.0 10.8
520-L482-40 304.5 306.4 1.9 17.2
520-L482-45 332.5 334.5 2.0 17.0
520-L482-49 330.3 337.0 6.7 10.4
520-L482-50 328.8 338.0 9.2 5.8
520-L482-51 344.0 350.4 6.4 8.1
520-L482-52 337.6 339.2 1.6 5.8
 and 347.0 357.0 10.0 11.0
520-L482-56 343.0 348.9 5.9 6.5
530-L406-45 181.0 185.0 4.0 17.8
560-L430-05 51.9 54.2 2.3 11.9
560-L430-07 50.0 53.1 3.1 9.0
560-L430-08 45.3 52.1 6.8 7.7
560-L430-09 32.0 35.1 3.1 12.1
 and 45.0 48.2 3.2 20.0
560-L430-11 34.1 37.0 2.9 10.4
560-L430-14 49.0 53.0 4.0 9.4
560-L430-25 30.0 34.0 4.0 5.9
560-L430-26 91.1 97.9 6.8 5.5
580-L392-03 123.0 135.3 12.3 6.9
580-L392-04A 90.0 93.0 3.0 9.4
 and 96.5 98.5 2.0 16.3
 and 110.0 117.9 7.9 7.9
 and 121.5 132.0 10.5 9.7
580-L392-07 90.6 93.7 3.1 7.1
 and 102.0 105.3 3.3 5.3
 and 121.7 124.0 2.3 20.3
580-L392-08 114.0 118.0 4.0 7.9
580-L392-13 76.3 80.9 4.6 10.3

*All assays are capped at 30 g/t gold, average gold grades over core length widths.

Access Ramp to Deep Central Zone Approved

The Company has approved an additional capital expenditure of US$6.1 million in 2015 to advance the ramp down to the 640 metre level in order to commence mining the Deep Central Zone in 2016.

Drilling during the first half of 2015 has effectively removed the gap in mineralization between the current production level at 560 metres and the Deep Central Zone. It is anticipated that mineralized material will be encountered during the ramp's development that should reduce the associated capital costs.

The Deep Central Zone is currently estimated to contain approximately 160,000 ounces of gold resources with an average grade of 8.5 g/t. The Deep Central Zone remains open along strike and down dip and will continue to be a focus of the Company's 2015 exploration program. Additionally the ramp will provide access points for new drill pads to drill below the 800 meter level.

Grey Fox Mineralization Continues to Expand

Primero also announced drilling results from the first half of 2015 from its Grey Fox property, located approximately 4 kilometres south-east of the Black Fox mine. The Grey Fox property contains a number of mineralized zones (Contact, 147, Grey Fox South, Whisky Jack, Gibson, and Gibson South Zones), all within close proximity to each other. These zones have the potential to become additional sources of ore for the Company and are within trucking distance of the Black Fox mill facility.

Exploration drilling continues to infill and expand the Contact Zone and Grey Fox South areas of the Grey Fox property. Results have also confirmed that the previously identified Whiskey Jack Zone is the continuation of the Contact Zone to the north, increasing the length of the Contact Zone by approximately 200 metres. Drilling has also extended the Grey Fox South Zone to the north and positive correlation of the drilling with the 2010 airborne magnetometer survey has led to the identification of several additional target zones to the east. These will be tested as part of the remaining 2015 exploration program. Highlights from Grey Fox South include 18.8 g/t gold over 6.0 metres (GF14-975).

Drilling at the Gibson South Zone, located approximately 600 metres west of the Contact Zone and south of the historic Gibson Decline, has returned results including 3.3 g/t gold over 39.0 metres (GF15-1011). The Gibson Decline was used in 1989 to extract an 8,000 tonne bulk sample with an average grade of 27.4 g/t.

Highlights of Grey Fox exploration drill results are included in Table 2 with locations identified in Figure 2.

Table 2: Grey Fox - H1 2015 Exploration Drilling Results

           
Hole From
(m)
To
(m)
Core Length
(m)
Gold Grade
(g/t)
Zone
GF14-919 17.0 21.0 4.0 4.2 Contact
GF14-946 31.0 40.0 9.0 1.2 Contact
 and 178.0 187.0 9.0 4.5  
GF14-954 60.1 73.0 12.9 1.5 Contact
GF14-957 82.0 86.0 4.0 7.3 Contact
 and 110.0 113.0 3.0 9.0  
GF14-958 91.0 95.0 4.0 16.1 Contact
GF14-963 259.0 261.0 2.0 7.2 Contact
 and 311.0 320.0 9.0 5.2  
GF14-968 174.0 176.0 2.0 13.5 Contact
GF14-971 89.5 98.3 8.8 2.0 Contact
GF14-973 183.0 186.0 3.0 18.6 Contact
GF14-975 38.5 44.5 6.0 18.8 Grey Fox South
GF14-976 136.0 142.0 6.0 2.6 Contact
 and 341.0 344.0 3.0 19.7  
GF14-985 88.0 89.0 1.0 22.7 Grey Fox South
 and 142.0 155.0 13.0 4.6  
 and 209.0 219.0 10.0 4.0  
GF14-987 52.0 58.0 6.0 3.9 Contact
 and 122.0 125.0 3.0 6.3  
 and 135.0 138.0 3.0 5.2  
GF14-991 131.4 135.0 3.6 13.0 Contact
GF14-996 57.0 63.0 6.0 3.1 Grey Fox South
 and 203.8 206.0 2.3 22.3  
GF14-998 55.0 63.4 8.4 3.6 Contact
 and 68.0 91.0 23.0 2.9  
 and 153.0 164.0 11.0 6.4  
GF14-1000 288.0 290.0 2.0 15.5 Grey Fox South
GF15-1011 172.0 211.0 39.0 3.3 Gibson South
 including 202.0 205.9 3.9 14.3  
 and 288.0 302.0 14.0 2.8  
GF15-1014 105.0 113.0 8.0 8.7 Gibson South
 and 217.0 221.0 4.0 9.0  
GF15-1018 45.0 47.0 2.0 5.9 Gibson South
 and 166.0 169.0 3.0 12.1  
GF15-1019 74.0 78.0 4.0 2.4 Contact
 and 98.1 111.0 12.9 9.4  
 and 236.0 239.6 3.6 10.1  
GF15-1041 341.0 352.0 11.0 5.8 Grey Fox South

*All assays are capped at 100 g/t gold, average gold grades over core length widths.

Black Fox Complex drilling was conducted by Norex Drilling supervised by Primero's exploration team. Mr. Gabriel Voicu, P. Geo., Vice President Geology and Exploration, reviewed the technical exploration information in this news release as the Qualified Person ("QP") for the Company for the purposes of National Instrument 43-101 ("NI 43-101"). All samples are 1/2 core and analyses reported herein were performed by the independent laboratories Polymet Labs of Cobalt, Ontario, which is ISO 9001:2000 certified in North America using standard fire assay procedures, AGAT Laboratories of Mississauga, Ontario, which is ISO 9001/IEC17025 certified, Accurassay Laboratories, which is ISO/IEC 17025 certified, ALS Laboratories, which is ISO 9001/IEC17025 certified, SGS Canada Laboratories, which is ISO9001/IEC17025 certified, using fire assay with ICP-OES finish or using gravimetric finish for values generally over 10 g/t gold, or Swastika Laboratories, which is ISO 17025 certified. Intercepts cited do not necessarily represent true widths, however drilling is generally intersecting interpreted mineralized zones at a high angle. Primero's quality control program includes systematic insertion of blanks, standard reference material and duplicates to ensure laboratory accuracy. Generally, in a block of twenty samples one will be a duplicate, one will be a standard and one will be a blank.

SAN DIMAS - MEXICO

High-Grade Jessica Vein Extended to 300 metres

Today Primero announced drilling results through the end of June 2015 from the San Dimas mine. Based on these results, detailed below, the Company also expects to replace its estimated full-year 2015 production.

The discovery of the Jessica vein late in 2014, via exploration drifting, was important for Primero as it proved the continuity of the mineralization under the upper volcanic (rhyolite) capping at San Dimas. The Company continued to develop along, and explore for, the continuation of the high-grade Jessica vein during the first half of 2015. The Jessica vein is now open with drifting along approximately 300 metres of strike length and 30 metres of dip, with an average grade of approximately 10.0 g/t gold and 1,500 g/t silver. Drilling has increased the vein's known extent to approximately 300 metres of strike length and 350 metres of dip, including past minor faulting and remaining open laterally for 1.7 kilometres between two major faults, Limoncito to the west and La Huerta to the east. Drilling highlights include 47.2 g/t gold and 5,994 g/t silver over 4.6 metres (SJE15_007), 59.3 g/t gold and 7,992 g/t silver over 2.3 metres (SJE15_017) and 61.3 g/t gold and 8,795 g/t silver over 1.1 metres (SJ15_040).

The Jessica vein was not included in the Company's year-end 2014 reserve and resource estimation, but has since been included in its 2015 mine plan and is expected to provide approximately 5% of San Dimas' total mill feed in 2015. The Jessica vein will continue to be a key focus of the 2015 exploration program.

Highlights from underground exploration drilling of the Jessica vein are included in Table 3 with locations shown in Figure 3.

Perez and Victoria Veins Expanded

Another key exploration target on the 22,500 hectare San Dimas property is the Perez vein, discovered in late 2013 and located in the Sinaloa Graben Block. Previously released results including 7.4 g/t gold and 528 g/t silver over 11.9 metres (LYR13_002) and 12.0 g/t gold and 2,109 g/t silver over 3.2 metres (LYR13_009)1 gave geologists confidence the Perez vein could be an important discovery for the Company.

Drilling from surface in the first half of 2015 has intersected a second ore-shoot of the Perez vein, approximately 350 metres east of the ore-shoot discovered in late 2013. Drilling results from Perez include 5.6 g/t gold and 369 g/t silver over 5.4 metres (PE15_026), and 11.3 g/t gold and 2,803 g/t silver over 2.2 metres (PE15_048). The Company continues to advance development towards the Perez vein from the Central Block in order to further explore the vein via underground drilling, with initial mining access planned in mid-2017.

Delineation drilling also continued to define the Victoria vein with mineralized intercepts including 86.4 g/t gold and 2,179 g/t silver over 2.5 metres (VIC15-340A), and 16.5 g/t gold and 984 g/t silver over 6.1 metres (VIC15-347). The Victoria vein is an important contributor to current and future ore supply at San Dimas and hosted 2014 year-end reserves of 168,000 ounces of gold and 7.9 million ounces of silver with average grades of 9.1 g/t gold and 428 g/t silver.

Highlights from underground exploration drilling of the Perez and Victoria veins are included in Table 3 with locations shown in Figures 4 and 5 respectively.

Table 3: San Dimas - Highlighted H1 2015 Exploration Drilling Results

             
Hole From
(m)
To
(m)
Estimated True Width (m) Gold Grade
(g/t)
Silver Grade
(g/t)
Vein
SJE15_006 121.2 128.6 4.5 4.4 1,353 Jessica
SJE15_007 132.6 139.4 4.6 47.2 5,994 Jessica
SJE15_008 76.6 78.6 1.8 12.1 1,888 Jessica
SJE15_010 82.9 84.5 1.4 9.0 1,453 Jessica
SJE15_012 155.3 155.9 0.3 71.6 12,078 Jessica
SJE15_016A 181.3 191.5 7.2 6.3 1,294 Jessica
SJE15_017 76.3 78.8 2.3 59.3 7,992 Jessica
SJE15_023 144.2 147.2 2.7 5.8 1,346 Jessica
SJE15_029 156.0 161.0 3.0 3.6 988 Jessica
 and 172.6 175.3 2.5 5.4 1,459  
SJE15_034 118.3 120.8 2.1 10.3 1,527 Jessica
SJE15_037 143.8 146.4 2.4 26.5 3,519 Jessica
SJE15_040 139.5 141.2 1.1 61.3 8,795 Jessica
SJE15_041 114.9 116.8 1.5 38.7 4,958 Jessica
PE15_026 203.7 210.8 5.4 5.6 369 Perez
PE15_029 211.9 220.1 6.2 2.6 481 Perez
PE15_030 166.6 168.0 1.3 10.5 1,146 Perez
PE15_033 226.6 230.1 1.3 10.2 1,709 Perez
PE15_036 241.6 242.7 0.5 20.3 6,282 Perez
 and 247.7 253.2 3.6 3.5 421  
 and 266.1 267.8 1.3 13.0 2,381  
PE15_038 202.0 213.3 7.5 2.3 201 Perez
PE15_044 210.4 213.2 1.4 11.7 1,856 Perez
 and 222.1 234.5 8.9 2.2 376  
PE15_048 223.4 228.2 2.2 11.3 2,803 Perez
 and 236.1 239.4 2.6 6.3 986  
PE15_052 217.9 222.7 3.9 6.3 841 Perez
VIC15_336 192.6 194.9 2.0 11.3 615 Victoria
VIC15_340A 224.0 227.1 2.5 86.4 2,179 Victoria
 including 225.0 225.5 0.4 183.0 3,832  
VIC15_342 265.7 268.2 1.5 41.5 72 Victoria
VIC15_343 248.8 252.4 2.3 5.2 174 Victoria
VIC15_347 133.3 140.1 6.1 16.5 984 Victoria
VIC15_348 132.9 134.5 1.1 14.7 827 Victoria
       

Promising High-Grade Channel Sample Results from Ventanas

The Company's Ventanas property is located in the southern part of the San Dimas district, 32 kilometres south of the productive San Dimas mine, along the western flank of the Sierra Madre Occidental mountain range in Durango State, Mexico. The Ventanas concessions cover approximately 3,470 hectares and contain 17 old mine workings.

"We are very interested in the strategic value that the Ventanas property could provide Primero," stated Mr. Ernest Mast, President and C.O.O. "The Company is very encouraged by the exploration and channel sampling results from this property, located 32 kilometres south of the San Dimas mine. We have commenced an internal scoping study to assess the potential economics of the property as it provides an opportunity for additional ore feed that is not covered by the silver purchase agreement with Silver Wheaton."

Primero continued its exploration program at Ventanas during the first half of 2015, including ramp and tunnel rehabilitation and channel sampling of the Mala Noche vein. The results continue to demonstrate significant exploration potential and the Company has initiated an internal scoping study to determine the economic viability of Ventanas becoming 500 to 1,000 tonnes per day of ore feed for the San Dimas mill. The project economics will be driven by optimizing hauling costs and crushing ore at the Ventanas site. The Ventanas property is not subject to the silver purchase agreement, so all precious metals produced from Ventanas will be sold into the spot markets. The Company currently estimates it could be processing Ventanas ore at the San Dimas mill within the next three years.

The Company is focused on rehabilitating the old workings located in the Mala Noche vein (Mala Noche and San Pedro ore shoots). Channel sampling during the first half of 2015 from the Mala Noche ore shoot (Level 10) returned an average of 2.8 g/t gold and 270 g/t silver, resulting in 6.8 g/t gold equivalent (using US$1,200 per ounce of gold and US$18 per ounce of silver) along 112 metres of open workings.

Channel sampling from the San Pedro ore shoot returned an average of 2.3 g/t gold and 274 g/t silver, resulting in 6.4 g/t gold equivalent (using US$1,200 per ounce of gold and US$18 per ounce of silver) along 140 metres of open workings.

Figures 7, 8 and 9 show the locations of the Mala Noche (Level 10) and San Pedro ore shoot channel sample results.

Drilling at San Dimas and Ventanas was conducted by Primero's exploration team. Mr. Gabriel Voicu, P. Geo., Vice President Geology and Exploration, reviewed the technical exploration information in this news release as the Qualified Person ("QP") for the purposes of NI 43-101 for the Company. All drill-hole samples are 1/2 core and analyses reported herein were performed in the ISO certified independent laboratory SGS Servicios Minerales in Durango Mexico, using fire assay with atomic absorption finish or gravimetric finish for values over 10 g/t gold. Intercepts cited represent true widths and drilling is generally intersecting interpreted mineralized zones at a high angle. Primero's quality control program includes systematic insertion of blanks, standard reference material and 5% of rejects are re-assayed to ensure laboratory accuracy. Generally, in a block of twenty samples one will be a standard and one will be a blank.

(1) Refer to the Company's news release dated December 4, 2013 and titles "Primero discovers another new high grade vein at San Dimas and intersects new mineralization at Cerro del Gallo", as filed on the Company's website and on SEDAR at www.sedar.com.

About Primero

Primero Mining Corp. is a Canadian-based precious metals producer that owns 100% of the San Dimas gold-silver mine and the Cerro del Gallo gold-silver-copper development project in Mexico and 100% of the Black Fox mine and adjoining properties in the Township of Black River‐Matheson near Timmins, Ontario, Canada. Primero offers immediate exposure to un-hedged, below average cash cost gold production with a substantial resource base in politically stable jurisdictions. The Company is focused on becoming a leading intermediate gold producer by building a portfolio of high quality, low cost precious metals assets in the Americas.

Primero's website is www.primeromining.com.

TECHNICAL INFORMATION AND QUALIFIED PERSON NOTES
The scientific and technical information regarding exploration results contained herein is based on information prepared by or under the supervision of Mr. Gabriel Voicu P.Geo., Vice President, Geology and Exploration, of Primero and a QP for the purposes of National Instrument 43-101 ("NI 43-101"). Mr. Voicu has reviewed and approved the contents of this news release.

CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION
This news release contains "forward-looking statements", within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities legislation, concerning the business and operations of Primero Mining Corp. and its consolidated subsidiaries (collectively, "Primero" or the "Company"). All statements, other than statements of historical fact, are forward-looking statements. Generally, forward-looking statements can be identified by the use of forward-looking terminology such as "plans", "expect", "is expected", "in order to", "is focused on" (a future event), "estimates", "forecasts", "intends", "anticipates", "believes" or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", or the negative connotation thereof.

Forward-looking statements include, but are not limited to, statements regarding the Company's estimation of mineral reserves and resources and the realization of mineral reserve estimates (including all assumptions), the ability to identify new resources and convert resources into reserves and resources, the ability to access or find ore below the current mining level, the timing, nature and success of exploration activities, the ability to replace its estimated 2015 full-year production, the ability to process Ventanas' ore within the next three years, and intentions to becoming an intermediate gold producer. The assumptions made by the Company in preparing the forward-looking information contained in this news release, which may prove to be incorrect, include, but are not limited to: the expectations and beliefs of management; the specific assumptions set forth above in this news release; that there are no significant disruptions affecting operations; that the Company does not change its development and exploration plans; that prices for gold and silver remain consistent with the Company's expectations; that the Company identifies new mineralization and extensions of existing mineralization, that the Company's current estimates of mineral reserves, mineral resources, mineral grades and mineral recovery are accurate, the discovery of additional ounces close to infrastructure and that mine development progresses as planned.

Forward-looking statements are subject to known and unknown risks, uncertainties and other important factors that may cause the actual results, performance or achievements of Primero to be materially different from those expressed or implied by such forward-looking statements, including: the ability to achieve planned production levels; the ability to fund exploration and development expenditures and for the expenditures to discover mineralization in minable quantities; possible variations in ore reserves, grade or recovery rates, mine development and operating risks; that there are no significant disruptions affecting operations, whether due to labour disruptions, supply disruptions, damage to or loss of equipment, whether as a result of natural occurrences including flooding, political changes, title issues, intervention by local landowners, loss of permits, or environmental concerns or otherwise; uncertainty of mineral reserves, mineral resources, mineral grades and mineral recovery estimates; uncertainty of future production, delays in completion of the mill expansion, exploration and development plans; mining risks, including unexpected formations and cave-ins, which delay operations or prevent extraction of material; risks associated with foreign operations; governmental and environmental regulation; landowner dissatisfaction and disputes; damage to equipment; and the ability to build a portfolio of precious metals assets in the Americas. Certain of these factors are discussed in greater detail in Primero's registration statement on Form 40-F on file with the U.S. Securities and Exchange Commission, and its most recent Annual Information Form on file with the Canadian provincial securities regulatory authorities and available at www.sedar.com. Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking statements. In addition, although Primero has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.

Forward-looking statements are made as of the date hereof and accordingly are subject to change after such date. Forward-looking statements are provided for the purpose of providing information about management's current expectations and plans and allowing investors and others to get a better understanding of our operating environment. Primero does not undertake to update any forward-looking statements that are included in this document, except in accordance with applicable securities laws.

Image Available: http://www.marketwire.com/library/MwGo/2015/7/19/11G048065/Images/Figure_1_Black_Fox-841737227456.jpg
Image Available: http://www.marketwire.com/library/MwGo/2015/7/19/11G048065/Images/Figure_2_Grey_Fox-1164697612697.jpg
Image Available: http://www.marketwire.com/library/MwGo/2015/7/19/11G048065/Images/Figure_3_Jessica-147105078548.jpg
Image Available: http://www.marketwire.com/library/MwGo/2015/7/19/11G048065/Images/Figure_4_Perez-402755598337.jpg
Image Available: http://www.marketwire.com/library/MwGo/2015/7/19/11G048065/Images/Figure_5_Victoria-1140487206467.jpg
Image Available: http://www.marketwire.com/library/MwGo/2015/7/19/11G048065/Images/Figure_6_Ventanas_Plan_View-1303907618788.jpg
Image Available: http://www.marketwire.com/library/MwGo/2015/7/19/11G048065/Images/Figure_7_Mala_Noche_Cross_Section-803745830148.jpg
Image Available: http://www.marketwire.com/library/MwGo/2015/7/19/11G048065/Images/Figure_8_Mala_Noche-48720651337.jpg
Image Available: http://www.marketwire.com/library/MwGo/2015/7/19/11G048065/Images/Figure_9_San_Pedro-1416369843741.jpg
Attachment Available: http://www.marketwire.com/library/MwGo/2015/7/19/11G048065/PR13-15_Exploration_Update_Final-476996192612.pdf

Lire la suite de l'article sur finance.yahoo.com
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Primero Mining Corp

PRODUCTEUR
CODE : P.TO
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Primero Mining est une société de production minière d'argent et d'or basée au Canada.

Son principal projet en production est SAN DIMAS au Mexique et son principal projet en exploration est VENTANAS au Mexique.

Primero Mining est cotée au Canada. Sa capitalisation boursière aujourd'hui est 59,0 millions CA$ (45,3 millions US$, 37,7 millions €).

La valeur de son action a atteint son plus haut niveau récent le 11 juillet 2014 à 9,05 CA$, et son plus bas niveau récent le 27 octobre 2017 à 0,08 CA$.

Primero Mining possède 190 170 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Primero Mining Corp
02/10/2013Announces Intention to Delist From the Australian Securities...
Financements de Primero Mining Corp
07/08/2012Announces Issuance of Shares to Goldcorp in Payment for Conv...
26/07/2012Announces Repayment of Convertible Note in Shares
Nominations de Primero Mining Corp
08/05/2013Announces Election of Directors
03/04/2012Announces Appointment of H. Maura Lendon as Vice President, ...
11/10/2011Announces Appointment of Renaud Adams as COO
07/03/2011Appoints Vice President of Exploration
Rapports Financiers de Primero Mining Corp
21/02/2013Reports Fourth Quarter and Full Year 2012 Results; Generates...
08/11/2012Amends Financial Statements for Deferred Tax IFRS Transition...
09/04/2012Provides Notice of Release of First Quarter 2012 Results and...
10/08/2011Reports Second Quarter 2011 Results; Earnings Increase on Si...
Hedging de Primero Mining Corp
22/03/2011Purchases Silver Call Options
Projets de Primero Mining Corp
15/10/2012(San Dimas)Announces Expansion of Its San Dimas Mine
03/05/2011(San Dimas)Mill Workers Return to Work
31/03/2011(San Dimas)Announces San Dimas Mill Worker Stoppage
Communiqués de Presse de Primero Mining Corp
06/07/2016Primero Announces Resignation of Eduardo Luna From Its Board...
05/07/2016Primero to Release Second Quarter 2016 Results on August 4, ...
24/06/2016Primero Closes C$51.75 Million Bought Deal Offering
14/06/2016Primero Acquires Large Strategic Mineral Concession at San D...
06/06/2016Primero Announces Cdn$45 Million Bought Deal Financing
02/06/2016Primero Notifies Mexico of an Investment Dispute Under NAFTA
04/05/2016Primero Announces Election of Directors
04/05/2016Primero Mining reports 1Q loss
04/05/2016Primero Reports First Quarter 2016 Financial Results; San Di...
18/04/2016Primero Reports Preliminary Q1 2016 Production Results; Quar...
18/04/2016Primero Amends Phantom Share Unit Plan
04/04/2016Primero to Release First Quarter 2016 Financial Results and ...
02/04/2016Primero Reports a Fatal Plane Crash Close to Its San Dimas M...
18/02/2016Primero Mining reports 4Q loss
25/01/2016Primero Increases Production by 15% and Lowers AISC by 20% i...
22/11/2015Is Mechel OAO (ADR) (MTL) A Good Stock To Buy?
03/11/2015Edited Transcript of P.TO earnings conference call or presen...
03/11/2015Primero Mining reports 3Q loss
03/11/2015Primero Reports Third Quarter 2015 Results; On-Track to Meet...
26/10/2015Primero Continues to Grow Black Fox at Depth and Announces W...
15/10/2015Can The Uptrend Continue for Primero Mining (PPP)?
08/10/2015Primero Announces Appointment of Tamara Brown as Vice Presid...
01/10/2015Primero to Release Third Quarter 2015 Results on November 3,...
31/08/2015Primero Announces Receipt of Mexican Import and Export Permi...
31/08/2015Primero Announces Resignation of Rohan Hazelton From Its Boa...
06/08/2015Primero Announces Receipt of Mexican Import and Export Permi...
05/08/2015Edited Transcript of P.TO earnings conference call or presen...
05/08/2015Primero Mining reports 2Q loss
05/08/2015Primero Reports a Fatal Accident at Its San Dimas Mine
05/08/2015Primero Reports Second Quarter 2015 Results; Strong Operatin...
28/07/2015Primero Provides Exploration Update; Expects to Replace Full...
28/07/2015Primero Reports a Fatal Accident at Its San Dimas Mine
20/07/2015Primero Advises of Delay in Silver Revenue Due to Delay in M...
20/07/2015Primero Provides Exploration Update; Expects to Replace Full...
13/07/2015Primero to Release Second Quarter 2015 Results on August 5, ...
13/07/2015Primero Advises of Delay in Silver Revenue Due to Delay in M...
02/07/2015Primero to Release Second Quarter 2015 Results on August 5, ...
27/03/2015Primero to Release First Quarter 2015 Results and Hold Annua...
27/03/2015to Release First Quarter 2015 Results and Hold Annual Genera...
25/03/2015Primero Reports 2014 Year-End Mineral Reserves and Mineral R...
18/03/2015Primero Reports 2014 Year-End Mineral Reserves and Mineral R...
18/03/2015Reports 2014 Year-End Mineral Reserves and Mineral Resources...
23/02/2015Primero Provides Exploration Update for the Black Fox Comple...
12/02/2015Primero Reports Fourth Quarter and Full-Year 2014 Results; R...
09/02/2015Primero Announces Closing of Offering of US$75 Million 5.75%...
09/02/2015Announces Closing of Offering of US$75 Million 5.75% Convert...
02/02/2015Primero Appoints Mr. Ernest Mast as President and Chief Oper...
20/01/2015Primero Increases Production by 57% in 2014 and Expects a Fu...
13/11/2014Primero Provides San Dimas and Regional Exploration Update; ...
06/11/2014Primero Mining reports 3Q loss
06/11/2014Primero Reports Third Quarter 2014 Results
16/10/2014Primero Announces Management Changes
02/10/2014Primero to Release Third Quarter 2014 Results on November 6,...
22/09/2014Primero Appoints Wendy Kaufman as Chief Financial Officer
19/09/2014Primero Reports Fatality at Its San Dimas Mine
27/02/2014and Brigus announce shareholders vote in favour of acquisiti...
14/10/2013Australian Securities Exchange ("ASX") Approves Primero's Re...
14/10/2013.: Australian Securities Exchange ("ASX") Approves Primero's...
08/10/2013to Release Third Quarter 2013 Results on November 6, 2013
19/09/2013(San Dimas)Provides Exploration Update; Drilling Continues to Extend Mi...
18/09/2013Premier discovers high grade polymetallic mineralization at ...
08/08/2013Reports Second Quarter 2013 Results; Record Gold and Silver ...
29/07/2013Provides Cerro Del Gallo Project Update; Appoints Louis Tone...
16/07/2013Klondex Names Mining Executive Renaud Adams to the Board
08/07/2013to Release Second Quarter 2013 Results on August 8, 2013
23/05/2013Announces Closing of Cerro Del Gallo Acquisition
21/05/2013Announces Exploration Results; Alexa Vein Continues and Vict...
08/05/2013Advises Federal Court of Australia Approves Cerro Transactio...
08/05/2013Reports First Quarter 2013 Results; Record Quarterly Product...
30/04/2013Advises Cerro Securityholders Approve Acquisition by Primero
22/04/2013Meets Annual Silver Threshold; to Begin Selling 50% of Silve...
11/04/2013Advises Date for Cerro Transaction Second Court Hearing Resc...
08/04/2013to Release First Quarter 2013 Results and Hold Annual Genera...
26/03/2013Reports 31% Increase in 2012 Year-End Gold Mineral Reserves ...
22/03/2013Confirms Registration of the Cerro Transaction Scheme Bookle...
06/02/2013Announces Fourth Quarter Conference Call Rescheduled to 10:0...
28/01/2013to Release Fourth Quarter and Year End 2012 Financial Result...
23/01/2013Achieves 2012 Guidance and Provides 2013 Outlook
08/11/2012Reports Third Quarter 2012 Results; and Maintains Annual Pro...
11/10/2012Announces Closing of Secondary Offering of Its Common Shares
10/10/2012to Release Third Quarter 2012 Results on November 8, 2012
05/10/2012Announces Positive Advance Tax Ruling
18/09/2012Announces Secondary Offering by Goldcorp Inc.
04/09/2012Announces Mid-Year Reserve and Resource Update; Replacing It...
02/08/2012Reports Record Second Quarter 2012 Results; and Increases 20...
09/07/2012to Release Second Quarter 2012 Results on August 2, 2012
25/06/2012Discovers New High-Grade Vein in West Block
15/05/2012(San Dimas)Files NI 43-101 Technical Report for its San Dimas 2011 Rese...
11/05/2012to Exhibit at New York Hard Assets Investment Conference; An...
03/05/2012(San Dimas)Reports Strong First Quarter 2012 Results; Record San Dimas ...
28/03/2012(San Dimas)Reports Fourth Quarter and Full Year 2011 Results; San Dimas...
28/03/2012Reports 2011 Reserves and Resources and Announces New High-G...
27/02/2012to Provide Corporate Update at the BMO Capital Markets Globa...
07/02/2012to Release Fourth Quarter 2011 Results on March 7, 2012
17/01/2012Reports 2011 Operating Results; Provides 2012 Outlook; and P...
06/10/2011to Release Third Quarter 2011 Results on November 4, 2011
14/09/2011Added to S&P/TSX SmallCap Index
08/09/2011Provides Revised Operating Outlook
29/08/2011Announces Termination of Arrangement Agreement With Northgat...
11/08/2011to Commence Trading on NYSE
13/07/2011Northgate and Primero to Combine and Create a Leading Mid-Ti...
06/07/2011to Release Second Quarter 2011 Results on August 10, 2011
05/07/2011Receives $87 Million VAT Refund
27/06/2011Added to Russell Global Index
06/06/2011to Begin Selling 50% of Silver at Spot
18/05/2011Announces Results of Shareholder Meeting
17/05/2011Reports First Quarter 2011 Results; Maintains 2011 Productio...
24/02/2011Reports Fourth Quarter and Full Year 2010 Results; Fourth Qu...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (P.TO)
0,310+258.82%
TORONTO
Cours préc. Ouverture
Bas haut
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  - -100,00%
Volume var. 1 mois
-100,00%
Produit Gold - Silver
Développe
Recherche Gold - Silver
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 08/06/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
6,69 AU$-0,15%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 +100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
8,41 US$+4,08%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,61 GBX+3,40%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,10 +0,96%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 +0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
13,44 +3,46%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,30 +7,14%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 +2,56%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
2,25 +3,69%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
39,38 US$+0,69%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,10 AU$-4,55%Trend Power :
Sun Res.(Oil)SUR.AX
Released ASX Announcement: Quarterly Activities Report
0,00 AU$+0,00%Trend Power :
Profitez de la hausse des actions aurifères
  • Inscrivez-vous à notre market briefing minier
    hebdomadaire
  • Recevez nos rapports sur les sociétés qui nous semblent
    présenter les meilleurs potentiels
  • Abonnement GRATUIT, aucune sollicitation
  • Offre limitée, inscrivez-vous maintenant !
Accédez directement au site.