Reduced Tulu Kapi Funding Requirements Replacement

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Zinc |

Reduced Tulu Kapi Funding Requirements Replacement

KEFI UPDATE 31 JAN 07

KEFI Minerals plc

27-28 Eastcastle Street London W1W 8DH United Kingdom

Tel: +90 232 381 9431

Fax: +90 232 381 9071

Email: [email protected]

2 June 2016

The following announcement replaces the "Reduced Tulu Kapi funding requirements" announcement released on 2 June 2016 at 07:00 with RNS number 9673Z. The original announcement contained erroneous figures for the "Financing/Insurance/Transaction Costs" and "Cost Overrun Facility" in the column headed "2015 DFS-based Plan" in the table showing net funding requirements. All other information remains unchanged.

KEFI Minerals plc ("KEFI" or the "Company")

REDUCED TULU KAPI FUNDING REQUIREMENTS AND FINANCE COSTS

Flagship project in Ethiopia sees funding requirements reduced further by c. US$13 million to approximately US$130 million and cost of financing lowered by removing large gold stream finance facility

KEFI Minerals (AIM: KEFI), the gold exploration and development company with projects in the Kingdom of Saudi Arabia and the Federal Democratic Republic of Ethiopia, announces that it has further reduced the funding requirements and finance costs for the development of the Tulu Kapi Gold Project. The Company remains on track to execute syndicated financing documentation at the end of Q3-16.

Highlights of the changes include:

  • Net funding requirement reduced from c. US$145 million to c. US$130 million due to further refinements to project contracting arrangements and the project plans;

  • Average cost of finance reduced by removing a large gold stream finance facility - decision taken in consultation with the proposed lead banks and major shareholders at project and Company level; and

  • Updated plan facilitates increased net cash generation - projections at gold price of US$1,250/oz now indicate US$173 million available for debt repayment, reinvestment and dividends in first 3 years of production.

The reduced net funding requirement is summarised below, along with a comparison with the 2015 financing plan, which was based on the 2015 Definitive Feasibility Study ("DFS"):

2016 Plan

10-year open pit mine plan US$M

2015 DFS-based Plan

13-year open pit mine plan US$M

Processing

59.7

72.3

Roads & Power Connection

15.0

17.8

Tailings (TSF) and Water

9.7

8.2

Resettlement/Community Programs

9.2

7.8

EPCM/Processing Indirects

N.A

10.8

Mining

5.4

10.6

Owners' Costs during construction

9.8

7.6

Subtotal

108.8

135.1

Pre-Production Funding/VAT Refunds

(0.9)

(5.5)

Funding for Capital Expenditure

107.9

129.6

Financing/Insurance/Transaction Costs

13.8

5.4

Cost Overrun Facility

15.0

10.0

Total Funding Requirement

136.7

145.0

Spent before Financial Completion

c. 5.0

0

p.1 of 4

Net Funding Requirement

131.7

145.0

The DFS was prepared from first principles on an owner-mining basis to ensure input costs are fully understood, and showed funding for capital expenditure of US$176 million. The figures in the table above show the 2015 DFS-based plan figures reduced after adjustment for project-contractor arrangements (see announcement dated 17 August 2015). The net funding requirement has, until recently, stood at c. US$145 million after provisions for financing costs and cost-overrun facilities, and is now c. US$130 million.

The reduced cost of financing is due to the replacement of large gold stream finance with alternative capital sources. To date KEFI has been focusing on arrangements for project contracting, debt facilities and project equity, the combination of which has reduced the anticipated remaining funding requirement from the initial DFS-based owner-operated figure of c. US$176 million to c. US$15 million of residual funding requirements, details of which are set out below:

2016

Finance Plan US$M

2015

Finance Plan US$M

Funding Sources:

Proposed Senior Secured Debt

85

65

Cost Overrun Debt Facility

10

15

Project Equity Capital

20

15-20

Funding Sources to date

115

95-100

Residual Funding Sources to be Optimised in H2-16

Mezzanine Facility (ranks as equity in security)

5-10

35-40

Equity, at Project or Company level

15 less 5-10

Of Mezzannine Facility

= 5-10 Equity

45-50 less 35-40 of Mezzanine Facility

= 5-10 Equity

Net Funding Requirement

130

145

The mezzanine facility was, until recently, intended to be a US$35-40 million gold stream arrangement. KEFI is now considering either a much smaller gold stream facility or a subordinated convertible note proposal, made possible by the reduced funding needs and the planned increase in senior secured debt. The refined plan has enhanced the project's economic robustness. Formal appointment of the full syndicate is in progress, other than optimisation of the sources of the residual funding requirement of US$15 million for which decisions will be made during Q3-16 as the project continues to de-risk. The focus is balancing the minimisation of equity dilution versus the minimisation of risk and cost for shareholders.

The impact of the reduced funding requirements and finance costs on project economics is as follows:

Open Pit Only

Refined Mine Plan 10-year L-O-M (contract-mining)

2015 DFS-based 13-year L-O-M (contract-mining)

Waste:ore ratio

7.4:1.0

7.4:1.0

Processing rate

1.5Mtpa

1.2Mtpa

Total ore processed

15.4Mt

15.4Mt

Average head grade

2.1g/t gold

2.1g/t gold

Gold recoveries

93%

93%

Annual steady-state gold production

115,000 ounces

95,000 ounces

Total LOM gold production

980,000 ounces

961,000 ounces

Net Funding Requirement

c. US$130M

c. US$145M

All-in Sustaining Costs

US$746/oz

US$779/oz

All-in Costs (incl. initial capex)

US$869/oz

US$906/oz

Average annual operating cash flow

US$58M p.a.

US$44M p.a.

Geared After-tax NPV (8%) at start construction

US$153M

US$120M

Geared IRR

45%

37%

Payback

2-3 years

3-4 years

Note: The above metrics assume a gold price of US$1,250/oz. Life of Mine ("LOM") includes the planned open pit only.

Mr Harry Anagnostaras-Adams, Executive Chairman, said: "Right from the start our strategy has been to make the Tulu Kapi project an economically robust proposition. With the support of our project contractors, lead banks and major shareholders at the project and parent-company level, we continue to refine the project and keep the costs under control. We look forward to updating the shareholders and the wider market as we continue making progress and at the Company's Annual General Meeting at the end of June."

ENQUIRIES

KEFI Minerals plc

Harry Anagnostaras-Adams (Executive Chairman)

+357 99457843

John Leach (Finance Director)

+357 99208130

SP Angel Corporate Finance LLP (Nominated Adviser)

Ewan Leggat, Jeff Keating

+44 20 3470 0470

Brandon Hill Capital Ltd (Joint Broker)

Oliver Stansfield, Alex Walker, Jonathan Evans

+44 20 7936 5200

Beaufort Securities Ltd (Joint Broker)

Elliot Hance

+44 20 7382 8300

Luther Pendragon Ltd (Financial PR)

Harry Chathli, Claire Norbury, Ana Ribeiro

+44 20 7618 9100

Further information can be viewed on KEFI's website at www.kefi-minerals.com

NOTES TO EDITOR

KEFI Minerals plc

KEFI is the operator of two advanced gold development projects within the highly prospective Arabian- Nubian Shield, with an attributable 1.93Moz (100% of Tulu Kapi's 1.72Moz and 40% of Jibal Qutman's 0.73Moz) gold Mineral Resources (JORC 2012) plus significant resource growth potential. KEFI targets that production at these projects generates cash flows for further exploration and expansion as warranted, recoupment of development costs and, when appropriate, dividends to shareholders.

KEFI Minerals in Ethiopia

The Tulu Kapi gold project in Western Ethiopia is being rapidly progressed towards development, with the Mining Licence granted in April 2015.

KEFI's Definitive Feasibility Study was then completed and the Company is now refining contractual terms for project construction and operation. Latest estimates for annual gold production are c. 100,000oz pa for a 10-year period and All-in Sustaining Costs (including operating, sustaining capital and closure) of approximately US$724/oz to US$752/oz at a gold price range of US$1,000/oz to US$1,400/oz. Tulu Kapi's Ore Reserve estimate totals 15.4Mt at 2.12g/t gold, containing 1.05Moz. The eight core production years of the open pit are estimated to yield an average of 115,000oz pa.

All aspects of the Tulu Kapi (open pit) gold project have been reported in compliance with the JORC Code (2012) and subjected to reviews by appropriate independent experts. These plans now also reflect the agreed construction and operating terms with project contractors, and have been independently reviewed by experts appointed for the project finance syndicate.

A Preliminary Economic Assessment has been published that indicates the economic attractiveness of mining the underground deposit adjacent to the Tulu Kapi open pit, after the start-up of the open pit and after positive cash flows have begun to repay project debts.

At a gold price of US$1,250/oz, the projected cash flows indicate a cash build-up in the first three production years of US$173 million, which would be sufficient to repay all project debts, fund the development of the underground mine and commence paying dividends to shareholders.

KEFI Minerals in the Kingdom of Saudi Arabia

In 2009, KEFI formed G&M in Saudi Arabia with local Saudi partner, Abdul Rahman Saad Al-Rashid & Sons Company Limited ("ARTAR"), to explore for gold and associated metals in the Arabian-Nubian Shield. KEFI has a 40% interest in G&M and is the operating partner. To date, G&M has conducted preliminary regional reconnaissance and has had five exploration licences ("ELs") granted, including Jibal Qutman and the more recently granted Hawiah EL that contains over 6km strike length of outcropping gossans developed on altered and mineralised rocks with all the hallmarks of a copper-gold-zinc VHMS deposit.

At Jibal Qutman, G&M's flagship project, Mineral Resources are estimated to total 28.4Mt at 0.80g/t gold for 733,045 contained ounces. The shallow oxide portion of this resource is being evaluated as a low capital expenditure heap-leach mine development.

ARTAR, on behalf of G&M, holds 24 EL applications that cover an area of approximately 1,484km2. ELs are renewable for up to three years and bestow the exclusive right to explore and to obtain a 30-year exploitation (mining) lease within the area.

The Kingdom of Saudi Arabia has instituted policies to encourage minerals exploration and development, and KEFI Minerals supports this priority by serving as the technical partner within G&M. ARTAR also serves this government policy as the major partner in G&M, which is one of the early movers in the modern resurgence of the Kingdom's minerals sector.

Lire la suite de l'article sur www.publicnow.com

KEFI Minerals Plc.

EXPLORATEUR
CODE : KEFI.L
ISIN : GB00B1HNYB75
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

KEFI est une société d’exploration minière d'or et de cuivre basée au Royaume-Uni.

Son principal projet en exploration est ARTVIN en Turquie.

KEFI est cotée au Royaume-Uni. Sa capitalisation boursière aujourd'hui est 211,6 millions GBX (251,2 millions US$, 226,4 millions €).

La valeur de son action a atteint son plus haut niveau récent le 21 janvier 2011 à 9,85 GBX, et son plus bas niveau récent le 06 septembre 2019 à 0,19 GBX.

KEFI possède 332 702 973 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de KEFI Minerals Plc.
Annual Report 2007
Financements de KEFI Minerals Plc.
27/07/2016has raised Euro 3.8 million
Rapports Financiers de KEFI Minerals Plc.
11/04/2016FIRST QUARTER 2016 OPERATIONAL UPDATE
31/12/2015Fourth Quarter 2015 Operational Update
19/10/2015Third Quarter 2015 Operational Update
28/09/2015Tulu Kapi Funding Update and Interim Results for the Half-Ye...
Projets de KEFI Minerals Plc.
03/06/2011exploration property sales and final results
Communiqués de Presse de KEFI Minerals Plc.
10/08/2017Reduced Funding Requirement
19/09/2016Investor Briefings
29/07/2016Total Voting Rights
13/07/2016Restructure For Develpment of Tulu Kapi
30/06/2016Result of AGM
07/06/2016Kefi Minerals 2015 Annual Report
07/06/2016Kefi Minerals Notice of AGM
07/06/2016KEFI Minerals Proxy
07/06/2016Appointment of Preferred EPC Contractor
02/06/2016Reduced Tulu Kapi Funding Requirements Replacement
25/04/2016KEFI at UK Investor Show
14/04/2016Electronic Communication
14/04/2016Letter to Shareholders re Electronic Communications
08/04/2016Holding(s) in Company
31/03/2016Total Voting Rights
31/12/2015Happy New Year 2016
30/12/2015Fourth Quarter 2015 Operational Update
14/12/2015Holding(s) in Company
19/10/2015Holding in Company
14/10/2015Appointment of Tulu Kapi Mine Contractor
05/10/2015Progress at Jibal Qutman, Saudi Arabia
28/09/2015Tulu Kapi Funding Update and Interim Results for the Half-Ye...
09/09/2015Update on Tulu Kapi Gold Project Financing
28/08/2015KEFI Presenting at Africa Down Under Conference
17/08/2015Contracting and Financing on Schedule, Tulu Kapi Gold Projec...
27/07/2015Director Dealing
17/07/2015Final Bidding Triggered for Project Contractors, Tulu Kapi G...
03/07/2015Director Share Purchase
01/07/2015Total Voting Rights
01/07/2015Second Quarter 2015 Operational Update
29/06/2015KEFI Presenting At Mining Capital Conference
24/06/2015Completion Of 2015 DFS & Development Funding Plan
19/06/2015New Investment – Kefi Minerals Plc
16/06/2015Conditional Placing to Raise £2.9 Million
16/06/2015Result of AGM
15/06/2015Chairman’s AGM Statement
22/04/2015Tulu Kapi Ore Reserve Statement
20/04/2015UPDATE ON PROJECT FINANCING AND DFS FOR TULU KAPI
13/04/2015KEFI Granted Mining Licence
09/04/2015KEFI - Webinar and UK Investor Show
07/04/2015Exploration Update at Hawiah - Saudi Arabia
01/04/2015First Quarter 2015 Operational Update
23/03/2015Grant of Share Options
18/03/2015Director Share Purchase
17/03/2015Financing Update
16/03/2015Tulu Kapi Update
04/03/2015EXPLORATION UPDATE - SAUDI ARABIA
26/02/2015Update on final tranche of placing
25/02/2015Appointment of Head of Operations
10/02/2015KEFI Presenting at Mining Indaba
10/02/2015Tulu Kapi Resource Update
10/02/2015Quarterly Update
15/10/2014QUARTERLY OPERATIONAL UPDATE
27/03/201427 March 2014 Share Option Scheme Approved
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
LSE (KEFI.L)
0,636+7.80%
LSE
GBX 0,636
16/09 17:28 0,050
7,8%
Cours préc. Ouverture
0,590 0,596
Bas haut
0,570 0,646
Année b/h Var. YTD
0,522 -  0,870 -6,47%
52 sem. b/h var. 52 sem.
0,522 -  0,870 -10,04%
Volume var. 1 mois
60 127 424 11,58%
24hGold TrendPower© : -17
Produit
Développe
Recherche Gold
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2024-0,63%0,920,50
2023-13,51%1,230,49
2022-6,33%1,470,46
2021-58,85%2,470,75
202044,36%2,400,51
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,00 AU$+0,29%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
9,42 US$-0,53%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,64 GBX+7,80%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+10,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,00 CA$-1,96%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
12,48 CA$+0,00%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,34 CA$+1,49%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,18 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,79 CA$-5,29%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
39,64 US$+0,48%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :
Profitez de la hausse des actions aurifères
  • Inscrivez-vous à notre market briefing minier
    hebdomadaire
  • Recevez nos rapports sur les sociétés qui nous semblent
    présenter les meilleurs potentiels
  • Abonnement GRATUIT, aucune sollicitation
  • Offre limitée, inscrivez-vous maintenant !
Accédez directement au site.