VANCOUVER,
BRITISH COLUMBIA--(Marketwire - March 31, 2010) - Imperial Metals
Corporation (TSX:III) reports operating income of $24.8 million for its
fiscal year ended 2009, close to the level achieved in 2008 ($25.4
million). Non cash losses on derivative instruments pushed overall
results into negative territory with a net loss of $0.39 per share for
2009 compared to net income of $1.83 per share in 2008 when falling
metal prices had the reverse effect on derivative instrument
accounting. Adjusted net income, a better reflection of overall
results, was $1.16 per share in 2009 compared to $1.71 in 2008.
---------------------------------------------------------------------------- For the Years Ended 2009 2008 ---------------------------------------------------------------------------- (expressed in thousands of dollars, except share amounts) Total Revenues $201,137 $229,745 Net (Loss) Income $(12,759) $59,617 Net (Loss) Income per share $(0.39) $1.83 Diluted (Loss) Income per share $(0.39) $1.83 Adjusted Net Income (2) $37,525 $55,468 Adjusted Net Income per share (2) $1.16 $1.71 Working Capital (3) $28,054 $54,211 Total Assets $373,071 $384,901 Total Long Term Debt (including current portion) $2,656 $4,648 Cash dividends declared per common share $0.00 $0.00 Cash Flow (1) $54,552 $76,334 Cash Flow per share (1) $1.68 $2.35 ---------------------------------------------------------------------------- (1) Cash flow and cash flow per share are measures used by the Company to evaluate its performance however, they are not terms recognized under generally accepted accounting principles. Cash flow is defined as cash flow from operations before the net change in non-cash working capital balances and cash flow per share is the same measure divided by the weighted average number of common shares outstanding during the period. (2) Adjusted net income is calculated by removing the gains or losses, net of related income taxes, resulting from mark to market revaluation of copper and foreign exchange hedging not related to the current period, removing the unrealized share based compensation expense, net of taxes, removing writedown of mineral properties, net of taxes, and removing adjustment to depletion on units-of-production assets, net of taxes. (3) Defined as current assets less current liabilities. The Company believes these measures are useful to investors because they are included in the measures that are used by management in assessing the financial performance of the Company.
Revenues were $201.1 million in 2009
compared to $229.7 million in 2008. The decrease is the result of lower
sales volumes on lower copper prices. The London Metals Exchange cash
settlement copper price per pound averaged US$2.34 in 2009 compared to
US$3.15 in 2008. The US Dollar compared to the CDN Dollar averaged
about 7% higher in 2009 than in 2008. In CDN Dollar terms the average
copper price in 2009 was 20% less than the 2008 average copper price.
Revenue in the fourth quarter of 2009 was increased by a positive $4.1
million revenue revaluation due to increasing copper prices compared to
a negative $27.1 million revenue revaluation in the fourth quarter of
2008 when copper prices fell sharply. Positive revenue revaluations are
the result of the copper price on the settlement date and/or the
current period balance sheet date being higher than when the revenue
was initially recorded or the copper price at the last balance sheet
date.
Operating income decreased slightly to $24.8 million from $25.4 million
in 2008. In 2009 lower depletion and depreciation expense was offset by
higher share based compensation expense with the total equal to that of
2008 for these two expense items. The 2008 operating income was after a
mineral property writedown of $16.2 million and foreign exchange gains
of $5.6 million versus a $7.4 million foreign exchange loss in 2009.
Net loss for the year ended December 31, 2009 was $12.8 million ($0.39
per share) compared to net income of $59.6 million ($1.83 per share) in
2008. The decrease was primarily due to the change in realized and
unrealized gains and losses on derivative instruments of a net loss of
$42.7 million in 2009 versus a gain, net of provisions for loss on
counterparty default, of $56.2 million in 2008.
Cash flow decreased to $54.6 million in 2009 from $76.3 million in
2008. The $21.7 million decrease is primarily the result of increased
cash income taxes. Cash flow is a measure used by the Company to
evaluate its performance, however, it is not a term recognized under
generally accepted accounting principles. Cash flow is defined as cash
flow from operations before the net change in non-cash working capital
balances. The Company believes cash flow is useful to investors and it
is one of the measures used by management to assess the financial
performance of the Company.
Capital expenditures were $26.7 million, down from $46.7 million in
2008 as the Company reduced capital expenditures in response to lower
cash flow. Expenditures in 2009 were financed by cash flow from the
Mount Polley and Huckleberry mines.
At December 31, 2009 the Company had $23.9 million (2008-$41.4 million)
in cash and cash equivalents and short term investments, inclusive of
the Company's share of cash and cash equivalents of Huckleberry of
$24.1 million (2008-$18.3 million).
Derivative Instruments
The Company has not hedged gold or silver, only copper and the CDN/US
Dollar exchange rate. During 2009 the Company recorded losses of $42.7
million on derivative instruments, primarily for copper, compared to
gains of $84.5 million in 2008. These gains and losses result from the
mark to market valuation of the derivative instruments based on changes
in the price of copper and the CDN/US Dollar exchange rate. These
amounts include realized gains of $19.7 million in 2009 and $40.3
million in 2008. The rapid decline in the price of copper during the
latter part of 2008 resulted in large unrealized gains being recorded
by the Company however these gains were reversed in 2009 with the
recovery of the copper price. The Company does not use hedge accounting
therefore accounting rules require that derivative instruments be
recorded at fair value on each balance sheet date, with the adjustment
resulting from the revaluation being charged to the statement of income
as a gain or loss.
The Company utilizes a variety of instruments for hedging including the
purchase of puts, forward sales and the use of min/max zero cost
collars. Imperial's income or loss from derivative instruments may be
very volatile from period to period as a result of changes in the
copper price and exchange rates compared to the copper price and
exchange rate at the time when these contracts were entered into and
the type and length of time to maturity of the contracts.
During the year ended December 31, 2008 a portion of the Company's
derivative instruments were with Lehman Brothers Commodity Services
Inc. ("LBCS"), a subsidiary of Lehman Brothers Holdings Inc.
("Lehman"). Both Lehman and LBCS have filed for bankruptcy
protection. As a result of the bankruptcy filing of LBCS and Lehman,
the uncertainty regarding the timing of, and the ultimate recovery of
the LBCS derivatives, the Company has made a provision $28.3 million
for the full amount of the LBCS derivatives.
Hedges for Mount Polley cover about 50% of copper settlements through
the first quarter of 2011 via min/max zero cost collars. Hedges for
Huckleberry include puts and forwards extending out to the second
quarter of 2011 covering about 70% of copper settlements in the period.
At December 31, 2009 the Company has unrealized losses on its
derivative instruments. This represents an decrease in fair value of
the derivative instruments from the dates of purchase to December 31,
2009 due to the decline in the price of copper in the last half of
2008. Refer to Note 13 to the audited consolidated financial statements
for the year ended December 31, 2009 for further details.
The Company has granted security to certain hedge counterparties to
cover potential losses in excess of the credit facilities granted by
the counterparties. At December 31, 2009 the Company had $2.6 million
on deposit with counterparties.
General
In US Dollars, copper prices were 25% lower in 2009 than in 2008,
averaging about US$2.34/lb compared to US$3.15/lb in 2008. The US
Dollar declined against the CDN Dollar during 2009 ending the year
weaker however the US Dollar averaged higher against the CDN Dollar
during 2009 than during 2008. Factoring in the increase in the average
exchange rate the price of copper averaged CDN$2.67/lb in 2009, about
20% less than the 2008 average of CDN$3.36/lb. The copper price
averaged US$3.01/lb or CDN$3.18/lb in the last quarter of 2009.
Mount Polley
--------------------------------------------------------------------------- Annual Production For the Years Ended December 31 2009 2008 2007 --------------------------------------------------------------------------- Ore milled (tonnes) 7,045,737 6,848,983 6,444,112 Ore milled per calendar day (tonnes) 19,303 18,713 17,655 Grade % - Copper 0.371 0.552 0.461 Grade g/t - Gold 0.322 0.306 0.242 Recovery % - Copper 58.80 72.41 78.66 Recovery % - Gold 67.70 69.71 69.34 Copper produced (lbs) 33,860,500 60,305,759 51,506,144 Gold produced (oz) 49,412 47,001 34,833 Silver produced (oz) 202,992 522,340 370,731 ---------------------------------------------------------------------------
The majority of mill feed in 2009 was
supplied by the Springer pit, which will continue to supply the bulk of
the mill feed at Mount Polley. In 2009 the Southeast and Wight also
provided a portion of mill feed.
Daily mill through put in the fourth quarter 2009 averaged 19,303
tonnes per day up significantly from the 18,467 tonnes per day achieved
in the fourth quarter 2008. This trend of increasing through put
continues into January 2010, with an average of 20,652 tonnes per day
compared with 13,411 tonnes per day achieved in January 2009. Mild
weather conditions along with upgrades to materials handling systems
have facilitated this significant increase in winter through put.
In January 2010, 120,000 tonnes was delivered to the mill from the
Southeast pit. This ore graded 0.24% copper and 0.47 grams per tonne
gold. This higher gold grade material along with excellent winter
through put enabled production of over 5,000 ounces gold. Copper
production for January 2010 was 2.7 million pounds.
Pond zone pit began delivering ore to the mill with 35,000 tonnes
delivered in January 2010.
Exploration in 2009 focused on the Junction, Springer, Boundary, Pond
and Southeast zones. Drilling returned significant intervals of
copper/gold mineralization at all of the zones.
Junction zone lies northwest of the Springer pit and the drill program
followed up on anomalies from trenching and other surveys which had
revealed erratic low grade mineralization. Systematic drilling of the
area has discovered several areas of significant mineralization,
including some near surface intercepts.
Drilling at Boundary zone was designed to confirm high grade
copper/gold mineralization. Highlights include drill hole ND09-92 which
intersected 8.9 metres grading 1.50% copper and 0.90 g/t gold starting
at 177.4 metres below surface and 37.3 metres grading 2.08% copper and
1.13 g/t gold starting at 260.2 metres. Drill hole WB09-254, a flat
hole, was drilled to the Boundary zone drilling, from the west wall of
the Wight pit, encountered significant mineralization including an
intercept of 16.6 metres grading 2.29% copper and 1.58 g/t gold
starting at 473.4 metres from the collar. Exploration at the Boundary
zone in 2010 will include driving a 500 metre underground ramp from the
Wight pit to the Boundary zone, intersecting it at approximately 250
metres below surface. Further exploration and delineation drilling of
the zone will be completed from the underground development.
Exploration drilling resumed in late January 2010. A 11 line Titan
geophysical survey completed at Mount Polley in the fall of 2009 will
be used to guide exploration drilling in the coming season where
possible.
Mount Polley exploration expenditures were $5.4 million in 2009
compared to $3.2 million in 2008. With the expanded land base, ongoing
exploration at Mount Polley focused on identification of additional
mineralized zones and expansion of identified zones. Drilling in 2009
tested seven zones on the property and provided further encouraging
results. Drilling in 2009 included 127 diamond drill holes totaling
42,115 metres compared to 63 diamond drill holes totaling 19,440 metres
in 2008.
Huckleberry
The financial results of Huckleberry continue to have a significant
impact on Imperial's results. Imperial's share of Huckleberry's net
loss in 2009 was $10.6 million compared to net income of $8.3 million
in 2008. Huckleberry's net income declined due to higher losses on
derivative instruments.
---------------------------------------------------------------------------- Annual Production (50% allocable to Imperial) For the Years Ended December 31 2009 2008 2007 ---------------------------------------------------------------------------- Ore milled (tonnes) 6,133,700 6,031,300 6,477,600 Ore milled per calendar day (tonnes) 16,805 16,479 17,747 Grade % - Copper 0.377 0.316 0.442 Grade % - Molybdenum 0.006 0.006 0.013 Recovery % - Copper 90.20 88.5 87.4 Recovery % - Molybdenum 1.87 23.2 8.1 Copper produced (lbs) 45,931,532 37,219,000 55,145,000 Gold produced (oz) 3,482 3,058 5,847 Silver produced (oz) 266,940 245,781 212,735 Molybdenum produced (lbs) 14,467 187,798 304,224 ----------------------------------------------------------------------------
All
mill feed continues to come from the Main Zone Extension and the
current mine plan provides for mill operations until August 2012. In
2009, Huckleberry completed an exploration program focused on drilling
the Main Zone Stirrup target; a prism of rock which had not been
adequately tested between the backfilled Main Zone pit and the
currently producing Main Zone Saddle pit. The goal of this program was
to ensure that all resources in the target area were adequately defined
to allow economic evaluation.
In addition, drilling tested the lateral and depth extent of the
resource below the Main pit. Of particular significance is DDH90ST-F
which intersected 0.38% copper and 0.010% molybdenum over 486 metres
from 12 to 498 metres. Since exploration began nearly 47 years ago,
this is the longest intersection of continuous mineralization reported
from Huckleberry. In 2010, a mine plan that includes mining of the
resource below the Main Zone pit will be investigated.
Red Chris
At the Red Chris copper/gold property, Imperial continued with deep
exploration of the East zone. The highlight of the season was hole
RC09-350 which intersected 647.5 metres grading 1.50% copper and 2.68
grams per tonne gold. RC09-350 contains the highest grades returned
from the Red Chris property to date. The 2009 exploration program also
included completion of an airborne magnetic survey covering the bulk of
the project, a 13 line Titan 24 geophysical survey, bobcat diamond
drilling, geologic mapping, in addition to the nine deep drill holes
which totaled 11,528 metres. Two other significant milestones for the
project have been achieved concurrent with the completion of the
successful exploration program. In mid September the provincial and
federal governments announced they had both dedicated funds towards
completion of the Northwest Transmission Line (NTL) which will bring
the BC Hydro grid to within 120 kilometres of the Red Chris project.
The other key event for Red Chris was the Supreme Court of Canada
decision, in January 2010, which confirmed that Red Chris has completed
all of the necessary Environmental Review for development of the
project and may proceed toward development.
Plans for 2010 include an aggressive diamond drilling program estimated
to complete 50,000 metres of drilling, while pursuing the Mines Act
permits which would allow predevelopment clearing to begin this year.
Exploration and geotechnical drilling started in January 2010.
Sterling
At Sterling during 2009 an underground diamond drilling program was
completed which extended the 144 zone gold mineralization to the north,
west and south. High grade gold mineralization was discovered in the
latite dike that divides the 144 zone from its east extension. In
advance of drilling, the north drift of the 144 zone decline was
extended by 187 feet, and a new drill station was excavated at its
face. A total of nine holes were drilled from this station, and were
designed to test the northern extent of the 144 zone. Collectively the
drill results added significantly to the size of the 144 zone.
Extension of the underground development is being completed, that will
include drifting across the 144 zone. The results of the 2009 drilling
and underground development will be incorporated into the geologic
model of the 144 zone and then the gold resource estimate will be
updated, followed by a study to investigate whether the resource is
sufficient to reopen the Sterling gold mine. The site has been
permitted and bonding has been put in place to allow for a restart of
mine operations.
Selkirk Metals Corp.
A business combination with Selkirk Metals Corp. was completed in
November 2009. Selkirk's portfolio of BC early stage and advanced
exploration properties include the Catface and Ruddock Creek projects.
Imperial looks forward to working with the Selkirk team to further
explore and develop these assets. Imperial issued 2.2 million common
shares and paid approximately $2.6 million on closing to complete the
acquisition of 100% of the issued and outstanding shares of Selkirk.
Imperial welcomed Mr. Ted Muraro to the Board of Directors. Mr. Muraro,
a director of Selkirk, has a long and distinguished career of over
forty years in the mineral exploration industry.
Ruddock Creek
During 2009 a Universal Receiver Electromagnetic survey (UREM) was
completed to augment the previous geophysical surveys completed in
previous years including airborne, ground and borehole geophysical
surveys. The known mineralization responds readily to these
electromagnetic surveys in this geological environment which is devoid
of conductive sediments and graphitic units. There were 24.05
kilometres of ground survey completed in two grids. The results, when
incorporated with the known geology, drill hole results and previous
surveys identified specific targets which will be drill tested during
future drilling campaigns.
Catface
An extensive community consultation process with the Ahousaht First
Nation continued following the business combination of Selkirk and
Imperial. As part of the consultation process, the Company maintains an
office in the Ahousaht village and continues to work extensively with
local leadership in support of the project. In October 2009 operations
commenced to rehabilitate the main access road that had been used by
previous logging operations and Falconbridge Limited for exploration
access. Approximately 60% of the proposed rehabilitation was completed
before the end of 2009. The balance of the rehabilitation has now been
completed and construction of an exploration camp is underway. A
diamond drilling program is planned for 2010 to further define and
extend the Cliff zone, which hosts all the resource outlined to date,
to test the Irishman Creek zone, and the area between these two zones.
Further baseline sampling and testing will also be completed in support
of environmental studies and permitting.
Detailed financial information is available in the Company's 2009
Annual Report, available on www.sedar.com and www.imperialmetals.com.
|