Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
Cours Or & Argent
Stornoway Reports Positive Renard 65 Diamond Valuation Result
Published : April 11, 2013
( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Carats | Dollar | Report |

MONTREAL, QUEBEC--(Marketwired - April 11, 2013) - Stornoway Diamond Corporation (News - Market indicators) is pleased to provide the results of an independent valuation on the Renard 65 bulk sample diamonds recently recovered at the Renard Diamond Project in north-central Quebec. The valuation was undertaken in Antwerp, Belgium by WWW International Diamond Consultants ("WWW") utilizing their March 2013 price book. Highlights are as follows:

  • An average price of US$250 per carat on the total Renard 65 parcel of 997 carats.
  • A diamond price model for Renard 65 of US$180 per carat, with a "High" sensitivity of US$203 per carat and a "Minimum" sensitivity of US$169 carat.
  • Valuations of US$8,500 per carat and US$5,900 per carat on the two largest stones of 9.77 carats (G colour) and 6.40 carats (F colour) respectively.

Matt Manson, President and CEO commented "This new valuation work has confirmed a high quality diamond population at Renard 65 that we anticipate will now allow the addition of a substantial quantity of new, open-pit resources to the project's mine plan. Two features of this work stand out. Firstly, the two large stones in the sample, previously announced by Stornoway, have been confirmed by WWW as amongst the most valuable stones recovered at the project to date. Their large impact in the parcel valuation has been tempered, appropriately, in the recommended base case price model, but their presence confirms a key characteristic of the Renard Project: upside value potential in large gems. Secondly, the WWW work has determined that Renard 65 possesses a diamond population with a different, and generally better, assortment of qualities than is seen in the other Renard kimberlite pipes. This has prompted a re-evaluation of the valuation models used in the project generally, which have previously been based on the assumption that Renard exhibits a single diamond population sampled by multiple pipes. The consequences of these findings for the project are significant, and positive."

Renard 65 and the Renard Mine Plan

The Renard 65 bulk sample was undertaken with a view to the potential conversion of material that is currently classified as an Inferred Mineral Resource to an Indicated Mineral Resource and, if warranted, to a Mineral Reserve. Within the larger Renard Mineral Resource inventory, Renard 65 contains an Inferred Mineral Resource of 3.7 million carats (representing 12.9 million tonnes at an average grade of 29 carats per hundred tonnes) to a depth of 290m, with an exploration potential estimated at between 6.8 and 13.7 million carats (29.5 to 41.6 million tonnes at between 23 and 33 cpht) from 290m to 775m in depth. As outlined in November 2011 Feasibility Study and subsequent Optimization Study, the Renard mine plan currently contemplates the mining of a 17.9 million carat Mineral Reserve from Renard 2, 3 and 4 from a combined open pit and underground mine at a processing rate of 6000 tonnes per day. Consistent with Canadian disclosure standards, this mine plan does not include the mining and processing of any of the project's Inferred Mineral Resources. The addition of new open-pit resources at Renard 65 is expected to allow an increase in processing capacity to 7000 tonnes per day and the extension of the project's reserve life.

The reader is cautioned that mineral resources that are not mineral reserves do not have demonstrated economic viability. In addition, the potential quantity and grade of any exploration target is conceptual in nature, and it is uncertain if further exploration will result in it being delineated as a mineral resource

Diamond Market Survey

The Renard 65 valuation exercise has also afforded an opportunity to calibrate the value of the Renard 2, 3 and 4 diamond parcels in the current market against the May 2011 price assumptions that were used in the November 2011 Feasibility Study and subsequent Optimization Study. Over this period the diamond market has experienced a high degree of price volatility, including a sustained period of weakness in 2012. However, the market has recovered in the first quarter of 2013 and WWW have reported that prices for Renard-specific diamond assortments are currently within 7% to 8% of May 2011 levels.

Table 1: Summary of Parcel Valuations1
Kimberlite Sample Size (Carats) Average of Independent Valuations (May 2011)2 WWW Valuation(May 2011)3 Average of Independent Valuations (Mar 2013)2 WWW Valuation(Mar 2013)3 Price Change Due to Market
Renard 2 1,581 $173 $195 $161 $180 -7%
Renard 3 2,752 $171 $190 $157 $173 -8%
Renard 4 2,674 $100 $107 $93 $100 -7%
Renard 65 997 n/a n/a n/a $250 n/a

Notes

  1. All prices in US$/carat. Samples utilizing a +1 DTC sieve size cut-off.
  2. Based on the average of 5 independent diamantaire valuations, as established in the May 2011 open market valuation exercise. This average is adjusted into March 2013 terms based on the application of the relative price changes seen by WWW over this period.
  3. Based on WWW alone. In each case WWW's own valuation was higher than the average of the five valuations.

Renard Diamond Price Models

The May 2011 valuation exercise utilized valuations by 5 independent valuators, including WWW, from which diamond price models were derived for mine planning purposes. At that time, the diamond samples from each kimberlite pipe were interpreted by Stornoway to have similar characteristics and represented a single diamond population. This interpretation led to the recommendation that employing a single diamond price model, derived from combining the Renard 2 and Renard 3 datasets, would be the most appropriate method for establishing diamond price estimates for the Renard project.

The determination that the Renard 65 kimberlite has a markedly different assortment of diamond qualities than the other kimberlite pipes has led WWW to recommend that individual price models for each pipe now be considered, and that the small differences in diamond quality and size distribution that can be observed in the diamond samples be treated as real. This has the effect of increasing the base case diamond price model for Renard 2 and decreasing the diamond price models for Renard 3 and Renard 4. The Renard kimberlites can now be said to exhibit similar, but different, diamond populations meriting individual consideration for pricing and valuation modeling. This is consistent with what is seen in most other diamond mines in the world that are based on a cluster of individual kimberlite pipes. Since Renard 2 contains 83% of the current Mineral Reserve at Renard, this adjustment to individual valuation models is expected to yield a net positive impact on project value.

Table 2: Diamond Price Models1
  WWW Price Models (May 2011)
Utilizing Common Value and Size Distribution Models
WWW Price Models (Mar 2013)
Utilizing Independent Value and Size Distribution Models
Kimberlite Base
Case
Model
Sensitivities Base
Case
Model
Sensitivities
High Minimum High Minimum
Renard 2 $182 $236 $163 $190 $214 $151
Renard 3 $182 $205 $153 $151 $185 $141
Renard 4 $112
($164)2
$185 $105 $104
($150)2
$168 $98
Renard 65 n/a n/a n/a $180 $203 $169

Notes

  1. All prices in US$/carat. Samples utilizing a +1 DTC sieve size cut-off.
  2. Should the Renard 4 diamond population prove to have a diamond population with a size distribution equal to the average of Renard 2 and 3, WWW have estimated that a base case diamond price model of $164 per carat would apply based on May 2011 pricing and $150 per carat based on March 2013 pricing.

For purposes of comparison, updated diamond price models based on the same assumptions used in May 2011 have been estimated by WWW as US$166 per carat for Renard 2 and 3 (with a High sensitivity of US$183 and a Minimum sensitivity of US$155) and US$150 for Renard 4 (with a High sensitivity of US$168 and a Minimum sensitivity of US$140), consistent with recent market price movements.

In the case of Renard 4, independent studies on diamond breakage and poor plant performance during the processing of the bulk sample have previously indicated that the size distribution of the Renard 4 diamond sample has been artificially modified during recovery. Should this prove to have been the case, a higher diamond price estimate for the Renard 4 kimberlite might still be expected.

Large Diamonds in Exploration Samples at Renard

Since its discovery in 2001, a characteristic of the Renard Diamond Project has been the incidence of large, high quality diamonds that have been recovered at each stage of exploration sampling. The most celebrated of these was a Renard 65 white octahedral gem of at least 4 carats discovered embedded in drill core in 2003. To date approximately 8,000 carats have been recovered from the Renard 2, 3, 4 and 65 kimberlite pipes, including 17 stones weighing 5 carats or more with a combined weight of 123.32 carats (see picture on our website http://tinyurl.com/cudp9e8). These include a 15.46 carat top light brown "makeable" gem from Renard 2, a 10.15 carat white octahedral gem from Renard 3, and the 9.77 carat white octahedral gem from Renard 65. In the latest WWW valuation the average value of these 17 stones is US$3,100 per carat. Six stones have values in excess of US$4,000 per carat. The WWW base case valuation models for the Renard project assume an average price of, variously, US$1,900 to US$2,200 per carat for stones between 5 and 10 carats in size. A substantial increase in revenue will be achieved for the Renard Project should large diamonds continue to be recovered upon commercial production on the same basis as has been achieved in the sampling performed to date.

About the Renard Diamond Project

The Renard Diamond Project is located approximately 250 km north of the Cree community of Mistissini and 350 km north of Chibougamau in the James Bay region of north-central Québec. In November 2011, Stornoway released the results of a Feasibility Study at Renard, followed by an Optimization Study in January 2013, which highlighted the potential of the project to become a significant producer of high value rough diamonds over a long mine life. Probable Mineral Reserves as defined under National Instrument ("NI") 43-101 stand at 17.9 million carats, with a further 17.5 million carats classified as Inferred Mineral Resources, and 23.5 to 48.5 million carats classified as non-resource exploration upside. All kimberlites remain open at depth. Pre-production capital cost stands at an estimated C$752 million, with a life of mine operating cost of C$57.63/tonne giving a 67% operating margin over an initial 11 year mine life. Readers are referred to the technical report dated December 29th, 2011 in respect of the November 2011 Feasibility Study for the Renard Diamond Project, and the technical report dated February 28th, 2013 in respect of the January 2013 Optimization Study, for further details and assumptions relating to the project.

About Stornoway Diamond Corporation

Stornoway is a leading Canadian diamond exploration and development company listed on the Toronto Stock Exchange under the symbol SWY and headquartered in Montreal. Our flagship asset is the 100% owned Renard Diamond Project, on track to becoming Québec's first diamond mine. Stornoway is a growth oriented company with a world class asset, in one of the world's best mining jurisdictions, in one of the world's great mining businesses.

On behalf of the Board

STORNOWAY DIAMOND CORPORATION

Matt Manson, President and Chief Executive Officer

This press release contains "forward-looking information" within the meaning of Canadian securities legislation and "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995. This information and these statements, referred to herein as "forward-looking statements", are made as of the date of this press release and the Company does not intend, and does not assume any obligation, to update these forward-looking statements, except as required by law.

Forward-looking statements relate to future events or future performance and reflect current expectations or beliefs regarding future events and include, but are not limited to, statements with respect to: (i) the amount of mineral resources and exploration targets; (ii) the amount of future production over any period; (iii) net present value and internal rates of return of the mining operation; (iv) assumptions relating to recovered grade, average ore recovery, internal dilution, mining dilution and other mining parameters set out in the Feasibility Study or the Optimization Study; (v) assumptions relating to gross revenues, operating cash flow and other revenue metrics set out in the Feasibility Study or the Optimization Study; (vi) mine expansion potential and expected mine life; (vii) expected time frames for completion of permitting and regulatory approvals and making a production decision; (viii) the expected time frames for the construction of a mining grade road by Stornoway and completion generally of the Route 167 extension and the financial obligations or costs incurred by Stornoway in connection with such road extension; (ix) future exploration plans; (x) future market prices for rough diamonds; and (xi) sources of and anticipated financing requirements. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as "expects", "anticipates", "plans", "projects", "estimates", "assumes", "intends", "strategy", "goals", "objectives" or variations thereof or stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, or the negative of any of these terms and similar expressions) are not statements of historical fact and may be forward-looking statements.

Forward-looking statements are made based upon certain assumptions by Stornoway or its consultants and other important factors that, if untrue, could cause the actual results, performances or achievements of Stornoway to be materially different from future results, performances or achievements expressed or implied by such statements. Such statements and information are based on numerous assumptions regarding present and future business strategies and the environment in which Stornoway will operate in the future, including the price of diamonds, anticipated costs and Stornoway's ability to achieve its goals. Certain important factors that could cause actual results, performances or achievements to differ materially from those in the forward-looking statements include, but are not limited to: (i) estimated approval date of the Environmental and Social Impact Assessment; (ii) required capital investment and estimated workforce requirements; (iii) estimates of net present value and internal rates of return; (iv) receipt of regulatory approvals on acceptable terms within commonly experienced time frames; (v) the assumption that a production decision will be made, and that decision will be positive; (vi) anticipated timelines for the commencement of mine production; (vii) anticipated timelines related to the construction of a mining grade road by Stornoway and completion generally of the Route 167 extension and the impact on the development schedule at Renard; (viii) anticipated timelines for community consultations and the impact of those consultations on the regulatory approval process; (ix) market prices for rough diamonds and the potential impact on the Renard Project's value; and (x) future exploration plans and objectives.

By their very nature, forward-looking statements involve inherent risks and uncertainties, both general and specific, and risks exist that estimates, forecasts, projections and other forward-looking statements will not be achieved or that assumptions do not reflect future experience. We caution readers not to place undue reliance on these forward-looking statements as a number of important risk factors could cause the actual outcomes to differ materially from the beliefs, plans, objectives, expectations, anticipations, estimates, assumptions and intentions expressed in such forward-looking statements. These risk factors may be generally stated as the risk that the assumptions and estimates expressed above do not occur, including the assumption in many forward-looking statements that other forward-looking statements will be correct, but specifically include, without limitation, (i) risks relating to variations in the grade, kimberlite lithologies and country rock content within the material identified as mineral resources from that predicted; (ii) variations in rates of recovery and breakage; (iii) the greater uncertainty of exploration targets; (iv) developments in world diamond markets; (v) slower increases in diamond valuations than assumed; (vi) risks relating to fluctuations in the Canadian dollar and other currencies relative to the US dollar; (vii) increases in the costs of proposed capital and operating expenditures; (viii) increases in financing costs or adverse changes to the terms of available financing if any; (ix) tax rates or royalties being greater than assumed; (x) results of exploration in areas of potential expansion of resources; (xi) changes in development or mining plans due to changes in other factors or exploration results of Stornoway; (xii) changes in project parameters as plans continue to be refined; (xiii) risks relating to receipt of regulatory approvals or the implementation of the existing Impact and Benefits Agreement with aboriginal communities; (xiv) the effects of competition in the markets in which Stornoway operates; (xv) operational and infrastructure risks; (xvi) technical, environmental, permitting and execution risk relating to the construction by Stornoway of a mining grade road forming part of the Route 167 extension, (xvii) the additional risks described in Stornoway's most recently filed Annual Information Form, annual and interim MD&A, and Stornoway's anticipation of and success in managing the foregoing risks. Stornoway cautions that the foregoing list of factors that may affect future results is not exhaustive.

When relying on our forward-looking statements to make decisions with respect to Stornoway, investors and others should carefully consider the foregoing factors and other uncertainties and potential events. Stornoway does not undertake to update any forward-looking statement, whether written or oral, that may be made from time to time by Stornoway or on our behalf, except as required by law.



Stornoway Diamond Corporation
Matt Manson
President and CEO
416-304-1026
or
Stornoway Diamond Corporation
Nick Thomas
Manager Investor Relations
604-983-7754 or Toll Free: 1-877-331-2232
info@stornowaydiamonds.com
or
Stornoway Diamond Corporation
M. Ghislain Poirier
Vice-president Affaires publiques
418-780-3938
gpoirier@stornowaydiamonds.com
www.stornowaydiamonds.com
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Stornoway Diamond Corporation

EN DÉVELOPPEMENT
CODE : SWY.TO
ISIN : CA86222Q8065
CUSIP : 86222Q806
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Stornoway Diamond est une société d’exploration minière d'or et de cuivre basée au Canada.

Stornoway Diamond est en développement de projets d'or, de cuivre, de diamants et de nickel au Canada, et détient divers projets d'exploration au Botswana et au Canada.

Son principal projet en développement est RENARD (FOXTROT) au Canada et ses principaux projets en exploration sont RAVEN, CHURCHILL, KINGORA, LDG, DARING LAKE, JEWEL, STARFISH, WALES ISLAND, SCEPTRE AND TIARA, HAMMER, QILALUGAQ, PORTAGE MINE, MELVILLE PENIN. et MELVILLE PENINSULA (AVIAT PROJECT) au Canada.

Stornoway Diamond est cotée au Canada. Sa capitalisation boursière aujourd'hui est 16,6 millions CA$ (12,6 millions US$, 11,4 millions €).

La valeur de son action a atteint son plus haut niveau récent le 14 mai 2004 à 9,80 CA$, et son plus bas niveau récent le 06 septembre 2019 à 0,01 CA$.

Stornoway Diamond possède 828 659 968 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Stornoway Diamond Corporation
10/04/2019Stornoway Diamond halts open pit operations at Quebec mine
15/11/2018Stornoway Diamond shares down on $37 million loss, departure...
Rapports annuels de Stornoway Diamond Corporation
LAUNCHES 2008 ONLINE ANNUAL REPORT: Posts Presentation from ...
Financements de Stornoway Diamond Corporation
11/07/2016Stornoway Receives C$82.72 Million from Warrant Exercise
31/03/2016Stornoway Announces Funding Of Third Tranche Of Stream Finan...
01/10/2015Stornoway Announces Funding of Second Tranche of Stream Fina...
13/11/2013Announces Increase To Bought Flow-Through Financing
19/04/2012Closes Private Placement of Units
08/03/2012Announces Bought Deal Equity Financing
01/08/2011Announces Financing Agreements With Québec For the Route 167...
29/05/2009Announces Closing of Flow-Through Financing
14/11/2008Announces Closing of Financings
05/11/2008Increases Previously Announced Private Placement
04/11/2008Announces Flow-Through Financing
01/08/2008Closes $22 Million Private Placement and Redeems Convertible...
28/07/2008Announces $22 Million Private Placement To Close Within 21 D...
16/07/2008ARRANGES $22 MILLION PRIVATE PLACEMENT Proceeds To Redeem Co...
Nominations de Stornoway Diamond Corporation
15/08/2013Announces Appointment to Board of Directors
25/06/2013Announcement of Appointment
03/08/2011Announces Changes To The Board Of Directors
20/07/2011Announces New Appointments to the Board of Directors
03/05/2010Announces Appointment Of Chief Operating Officer
01/03/2010Announces Management Appointments
Rapports Financiers de Stornoway Diamond Corporation
10/08/2017Second Quarter Results
27/07/2017Stornoway Announces Second Quarter Release Date
17/05/2016Stornoway Announces Results From Annual General Meeting
10/05/2016Stornoway Announces FY2016 First Quarter Results
05/05/2016Annual General Meeting
15/09/2009First Quarter Financial Results Posted, Matt Manson’s AGM Pr...
Projets de Stornoway Diamond Corporation
15/07/2016(Renard (foxtrot))Stornoway Commences Ore Processing At Renard Diamond Project
28/01/2014Provides Update On Exploration Joint Ventures
10/10/2013To Commence Early Construction Of Renard Mine Airport
03/09/2013First Vehicle Arrives At Renard Project Site Via New Permane...
07/08/2013Provides Update On Exploration Joint Ventures
23/07/2013Announces Updated Renard Mineral Resource Estimate
16/07/2013Receives Federal Government Authorisation For Renard Project
03/06/2013Provides Renard Project Update
14/03/2013Options Non-Core Exploration Projects
14/02/2013Reports Arrival Of Winter Road At Renard Project Site
28/01/2013Reports Optimized Renard Mine Design And Cost Estimates
01/06/2012Exhibiting at the World Resource Investment Conference: Vanc...
27/03/2012Signs Impacts And Benefits Agreement For The Renard Diamond ...
17/02/2012Renard Diamond Project Digital Fly-Through Video
04/01/2012Files NI 43-101 Technical Report For The Renard Feasibility ...
10/12/2011Renard Diamond Project Community Relations Video
03/10/2011Provides Update On Pipeline Projects
25/05/2011(Hammer)Announces Exploration Drill Program at Hammer Property, Nuna...
28/04/2011(Renard (foxtrot))Provides Renard Project Update Feasibility Study on Track fo...
01/04/2011(Renard (foxtrot))Announces Closing Of Agreement To Acquire Remaining 50% Of R...
07/03/2011(Aviat)Announces New Microdiamond Results From the Aviat Project, N...
23/02/2011(Renard (foxtrot))Announces Positive Microdiamond Results from Renard 1
23/02/2011(Renard (foxtrot))annonce des résultats microdiamantifères positifs pour Renar...
10/02/2011(Renard (foxtrot))Shareholders Overwhelmingly Approve Acquisition Of Remaining...
07/02/2011(Renard (foxtrot))Files NI 43-101 Technical Report On The Recently Revised Res...
24/01/2011(Renard (foxtrot))Announces Increased Ni 43-101 Mineral Resource Estimate For ...
14/12/2010(Renard (foxtrot))Stornoway Announces Acquisition Of Remaining 50% Of Renard P...
22/03/2010(Renard (foxtrot))Renard Updated Economic Assessment Teleconference Archive No...
08/12/2009Announces Revised Ni 43-101 Mineral Resource Estimate For Re...
09/03/2009(Renard (foxtrot))Provides Renard Drilling Update: Renard 2 Kimberlite Greatly...
19/02/2009(Aviat)Reports Initial Diamond Results From Aviat 200 Tonne Bulk Sa...
15/12/2008Reports Filing of NI 43-101 Technical Report for Renard Prel...
28/11/2008(Churchill)Reports Diamond Counts From Two Kimberlites At Churchill
24/09/2008(Churchill)And Shear Announce 9 New Kimberlites At Churchill Diamond Pr...
15/09/2008(Churchill)and Shear Announce New Killiq Kimberlite at Churchill Diamon...
08/09/2008(Aviat)Doubles Size of Aviat’s Highly Diamondiferous AV267 Sheet
04/09/2008(Qilalugaq)Discovers New Kimberlite at Qilalugaq
02/07/2008(Churchill)and Shear Announce 2008 Program Underway at the Churchill Di...
27/06/2008(Churchill)And Shear Report Additional High Interest Mineral Dispersion...
15/05/2008(Aviat) Provides Aviat Project Spring Update Increases Project Inte...
28/04/2008(Renard (foxtrot))New Renard Diamond Valuation Results and Pre-Feasibility Upd...
13/03/2008(Aviat)Improves On Diamond Content of Aviat Kimberlites AV1 and AV2...
20/02/2008(Churchill)and Shear Report Additional Diamonds from Kahuna Drilling
31/01/2008(Churchill) and Shear Report High Diamond Counts from Four Kimberlites ...
29/01/2008(Aviat)Reports Diamond Content of 162 Cpht from 20.6 Tonne Aviat Sa...
28/01/2008(Renard (foxtrot))HIGH DIAMOND CONTENT CONFIRMED AT HIBOU DYKE 126 Cpht from 3...
12/12/2007(Melville Peninsula Aviat 1)Third Kimberlite Pipe At Aviat Proves Diamondiferous
14/11/2007(Churchill Project) and Shear Recover a 5.43 Carat Diamond fromChurchill?sKahun...
25/09/2007(Sua Pan (stornoway/motapa Jv))and Motapa Commence Drilling at Sua Pan Project, Botswana
25/07/2007 Commences Pre-Feasibility Study on Renard Diamond Deposit
Communiqués de Presse en Français de Stornoway Diamond Corporation
18/02/2011Les actions regroupées de Stornoway commenceront à se négoci...
Communiqués de Presse de Stornoway Diamond Corporation
29/06/2016Stornoway Reminds Warrantholders Of Upcoming Exercise Deadli...
22/06/2016Stornoway commences plant commissioning at Renard Diamond Pr...
06/06/2016Stornoway Provides Renard Operational Readiness Update
05/05/2016Stornoway Intersects Kimberlite At Adamantin Project
30/03/2016Stornoway Announces Updated Renard Mine Plan and Mineral Res...
14/10/2015Stornoway Files Renard NI 43-101 Technical Report
08/09/2015North Arrow Confirms High Diamond Counts From Pk150 Kimberli...
30/03/2015North Arrow Discovers Three New Kimberlites at the Pikoo Dia...
24/03/2015Stornoway Announces Third Quarter 2015 Results
24/03/2015Stornoway Commences Pre-Stripping at Renard 2-Renard 3 Open ...
11/03/2015Stornoway Announces Third Quarter 2015 Results
26/02/2015North Arrow Reports Initial Diamond Recoveries From First 60...
12/02/2015Stornoway to Attend Upcoming Investor Conferences
11/02/2015North Arrow Drilling Program Underway at Pikoo, Saskatchewan
21/01/2015North Arrow Updates Qilalugaq Project Bulk Sample Processing
16/12/2014Stornoway Announces Second Quarter 2015 Results
15/12/2014Stornoway Announces Second Quarter 2015 Results
17/11/2014Stornoway Completes Field Portion Of 2014 Renard Drill Progr...
17/11/2014Stornoway Completes Field Portion of 2014 Renard Drill Progr...
10/11/2014Stornoway Lists Convertible Debentures
10/11/2014Stornoway Lists Convertible Debentures
22/10/2014Stornoway Announces Results From Annual General Meeting
22/10/2014Stornoway Announces Results From Annual General Meeting
20/10/2014Stornoway Adds Large Diamond Recovery Capacity To Renard Dia...
20/10/2014Stornoway Adds Large Diamond Recovery Capacity to Renard Dia...
23/09/2014North Arrow Identifies New Targets at the Pikoo Diamond Proj...
22/09/2014Stornoway Announces Notice of 2014 Annual Meeting of Shareho...
15/09/2014Stornoway Announces First Quarter 2015 Results
25/08/2014Stornoway Provides Renard Project Update
21/07/2014Stornoway Awards EPCM Contract to SNC-Lavalin Inc.
16/07/2014Stornoway Announces Appointment of Douglas Silver to Board o...
10/07/2014Stornoway Announces Formal Production Decision at Renard
08/07/2014Announces Closing Of Comprehensive Financing Package To Fund...
08/07/2014Stornoway Announces Closing of Comprehensive Financing Packa...
27/06/2014Shareholders Overwhelmingly Approve Resolutions Relating To ...
26/06/2014Stornoway Shareholders Overwhelmingly Approve Resolutions Re...
27/03/2014Stornoway Confirms Negotiations For Project Financing
13/11/2013Announces Flow-Through Financing For Renard Resource Expansi...
05/11/2013Hosts Québec Minister of Natural Resources at Montreal Press...
24/10/2013Announces Results From Annual General Meeting
21/10/2013to Proceed With Liquefied Natural Gas (LNG) Power Plant for ...
02/10/2013Arranges $20M Bridge Facility for Renard Diamond Project
25/06/2013Reports Quebec Strike Action Settled
19/06/2013Provides Renard Mine Road Update
07/05/2013Welcomes Clarity On Future Quebec Mining Taxation
11/04/2013Reports Positive Renard 65 Diamond Valuation Result
27/03/2013Provides Construction Update on the Renard Mine Road
12/03/2013Reports Fatality In Accident On The Winter Road
25/02/2013Completes Renard 65 Diamond Recovery
11/12/2012Recovers High Value 9.78 Carat Stone From Renard 65 Bulk Sam...
29/10/2012Provides Update on the Route 167 Extension
18/10/2012Receives Renard Mining Lease
25/09/2012Annual Summary
11/09/2012Announces Results From Annual General Meeting
06/09/2012Executes Mandate Letter With Lead Arrangers For Renard Proje...
30/08/2012Announces The Successful Completion Of The Final Public Hear...
23/07/2012to Commence Bulk Sampling of Renard 65 Kimberlite
05/07/2012Signs Partnership Accord With Chibougamau And Chapais
04/07/2012Provides Update On Renard Powerline Study
04/07/2012Presentation from the RBC Diamond Conference in London, June...
12/06/2012(Qilalugaq)Reports Initial 26.1 Million Carat Mineral Resource Estimate...
08/06/2012Announces the Successful Completion of Federal Public Consul...
31/05/2012Announces Establishment Of Head Office In Montreal
24/05/2012Video of the Mecheshoo Agreement Signing Ceremony
23/05/2012Announces $28.4m Renard Pre-Development Capital Program
04/05/2012Arranges a $20 Million Unsecured Debt Facility for Renard Di...
22/03/2012Conducts Successful Open Houses in Chibougamau and Mistissin...
03/02/2012Announces Commencement Of Construction Of Route 167 Extensio...
12/01/2012Corporate Video, Social Media, and Upcoming Events
28/12/2011Announces Filing of the Renard Environmental and Social Impa...
07/12/2011Québec Releases Certificate Of Authorization For The Constr
05/12/2011Video Presentation from the 2011 Scotia Capital Mining Confe...
26/10/2011Annual Summary
20/09/2011Provides Renard Project Update
12/09/2011Announces Addition to S&P/TSX SmallCap Index
06/08/2011English Language Media Attention Regarding Route 167 Road Ag...
01/08/2011Announces FinancingAgreements With Québec For Th
11/07/2011Announces Acquisition of "Aeon" Claims in Northern Quebec
13/06/2011Announces 56% Increase in Renard Diamond Price Estimate
27/04/2011Announces 2011 Exploration Program And Budget
20/03/2011Welcomes Quebec Budget Announcement of Financing for the Rou...
18/02/2011to Commence Trading on Consolidated Basis at Market Opening ...
07/04/2010Matt Manson on CBC's the Lang and O'Leary Exchange
22/03/2010Reports Updated Renard Preliminary Assessment Pre-Tax NPV In...
08/03/2010Reports Overall Diamond Recovery Of 86.2 CPHT From Notch Sam...
12/02/2010Files Renard “Notice Of Intent”
15/01/2010Upcoming Conferences in Vancouver
28/11/2009Presentation from the Quebec Exploration Conference: the 200...
06/10/2009s Announces Fourfold Tonnage Increase In Renard 2 Following ...
10/08/2009And Shear Option Chesterfield Inlet Claims, Nunavut
30/07/2009(Hammer)Reports Discovery Of Hammer Kimberlite
08/07/2009is now on Twitter
08/06/2009Renard Summer Drill Program Commences
24/01/2009Upcoming Events
15/01/2009Reports 144 Cpht In Large Tonnage Hibou Dyke Sampling
07/01/2009Provides 2009 Exploration Outlook
17/12/2008Provides Corporate Update
14/07/2008Related News
01/05/2008 is Attending the CIM Conference in Edmonton, May 4-6
04/03/2008Additional Diamond Results From Renard 65 and North Anomaly ...
21/01/20083.64 Carat Diamond Recovered from AV2 Kimberlite at Aviat
14/12/2007 Announces Additional Renard Diamond Recovery Results
03/12/2007 And Shear Recover 337 Carats From 356 Tonne Kahuna Bulk Sam...
22/10/2007 Announces Positive Valuation Results From Renard Bulk Sampl...
19/09/2007Yves Harvey Appointed Member of Stornoway Board of Directors
18/09/2007And Shear Confirm High Commercial Diamond Content AtChurchil...
11/09/2007Qilalugaq Diamond Exploration Program Update
06/09/2007Aviat's Eastern Sheet Complex Points To Significant Tonnage
23/08/2007New Kimberlite Pipe Discovered At Aviat
14/08/2007 Reports 2,213 Carats Recovered From Renard 4
01/08/2007Reports an Additional 31 Diamonds Weighing 1.74 Carats from ...
31/07/2007Reports 1,642 Carats Recovered from Renard 2 Including a 15....
17/07/2007and Shear Announce Closing of BHP Billiton Diamond Inc's Int...
10/07/2007Enters Into Agreement with Bayswater to Explore Diamond Targ...
20/06/2007Reports 2,681 Carats Recovered From Renard 3 Including A 10....
17/05/2007Reports an Initial Diamond Content of 150 cpht from Renard 3...
14/05/2007Provides Exploration Update - On Schedule For First Renard D...
14/05/2007Provides Exploration Update
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (SWY.TO)
0,020+100.00%
TORONTO
CA$ 0,020
06/09 17:15 0,010
100%
Cours préc. Ouverture
0,010 0,010
Bas haut
0,010 0,020
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,020 -%
Volume var. 1 mois
15 947 741 -%
24hGold TrendPower© : -33
Produit
Développe Diamonds
Recherche Diamonds - Gold - Uranium
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
6,94 AU$-1,14%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
8,41 US$-3,67%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,59 GBX+1,21%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,05 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,06 CA$-0,96%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
11,47 CA$-4,50%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,30 CA$-1,67%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,18 AU$+5,71%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,60 CA$-3,03%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
41,34 US$-1,76%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :
Profitez de la hausse des actions aurifères
  • Inscrivez-vous à notre market briefing minier
    hebdomadaire
  • Recevez nos rapports sur les sociétés qui nous semblent
    présenter les meilleurs potentiels
  • Abonnement GRATUIT, aucune sollicitation
  • Offre limitée, inscrivez-vous maintenant !
Accédez directement au site.