Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
Cours Or & Argent
Dans la même rubrique

Agnico-Eagle Mines Limited

Publié le 23 juillet 2008

Reports Second Quarter 2008 Results

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Copper | Dollar | Euro | G Mexico | Zinc |

(All amounts expressed in U.S. dollars unless otherwise noted)

AGNICO-EAGLE REPORTS SECOND QUARTER 2008 RESULTS

Toronto (July 23, 2008) � Agnico-Eagle Mines Limited (TSX: AEM / NYSE: AEM) ("Agnico-Eagle" or the �Company�) today reported quarterly net income of $8.3 million, or $0.06 per share for the second quarter of 2008.  This result includes a non-cash foreign currency translation loss of $1.2 million, or $0.01 per share.  Additionally, the non-cash stock option expense totaled $2.6 million, or $0.02 per share in the second quarter.  In the second quarter of 2007, the Company reported net income of $37.8 million, or $0.28 per share.  The reduction in net income was almost entirely due to the 56% decrease in the realized price of zinc, combined with a 7% decrease in zinc sales due to lower production, compared to the second quarter of 2007.  The decline in zinc production during the quarter is due to the focus of mining on the lower mine at LaRonde where the ore is more gold/copper rich and has lower zinc grades.

Second quarter 2008 cash provided by operating activities increased to $92.8 million from $79.8 million in the second quarter of 2007, largely due changes in working capital.

Second quarter 2008 highlights include:

  • Strong Operating Results � good metal output and cost control contributed to solid operating earnings and strong cash flow at LaRonde from 59,452 ounces of gold
  • Low Costs - Low total cash costs per ounce  at LaRonde of $113.  Excellent cost control at LaRonde with C$68 minesite costs per tonne 
  • Progress On Gold Production Growth � new Goldex mine is now operating and approaching commercial production.  Kittila gold mine project preparing to open in the fourth quarter 2008 
  • Expanding Gold Deposits � preliminary exploration results demonstrate the potential to continue to grow the gold deposits at Kittila, Pinos Altos and Meadowbank.  Scoping studies are underway on potential expansions at these sites and also on the recently opened Goldex mine 
  • Health and Safety Excellence � the LaRonde team won the Quebec mine rescue competition for an unprecedented 4th year in a row

Payable gold production  in the second quarter of 2008 was 59,452 ounces (67,757 ounces including 8,305 ounces poured at Goldex during its commissioning) at total cash costs per ounce of $113.  This compares with payable gold production of 56,392 ounces, at total cash costs per ounce of minus $699, in the second quarter of 2007.  The increase in production was largely due to higher gold grades mined at LaRonde.  However, the total cash costs were significantly higher in the 2008 period as a result of much lower prices realized for zinc, combined with lower zinc grades mined at LaRonde. 

For the full year, gold production from LaRonde, Goldex and Kittila is now forecast to total 300,000 ounces to 320,000 ounces.  While LaRonde is operating slightly ahead of plan, the production ramp-up at Goldex has been slower than expected due to the slower than expected commissioning of the production hoist.  Also, delays in exotic piping delivery and some mechanical and electrical installations in the Kittila mill are expected to push start-up to the fourth quarter rather than September, as previously projected.

�Strong operational results were achieved once again this quarter from our LaRonde operation where gold output is ahead of forecast and operating costs are on budget.  With the new Goldex mine expected to reach commercial production in the third quarter and our new Kittila mine expected to open in the fourth quarter, we anticipate seeing improving financial results over the next several quarters�, said Sean Boyd, Vice-Chairman and Chief Executive Officer.  �However, the Company is not immune to the cost pressures being experienced throughout the mining industry.  The continued strength of the Canadian dollar and the Euro, combined with cost pressures for contract services, fuel, steel, cement and reagents are leading to higher estimates for capital and operating costs at our mines.  A normal course review is underway with revised estimates to be provided before year end�, added Mr. Boyd.

The Company is undertaking its annual life of mine planning exercise based on its most recently published mineral reserves (February 2008).  The results are expected to be released in the fourth quarter of 2008.  At current currency exchange rates and considering industry-wide cost escalation, capital expenditures over the 2008 to 2010 period could be approximately 40% over the estimates provided in Agnico-Eagle�s press release of December 10, 2007.  Of this potential increase, approximately 40% would be attributable to the difference in currently prevailing exchange rates, versus the three year trailing average rates that were used in the 2007 forecast.  The other 60% would be due to increases in fuel, steel, cement, chemical reagents, engineering and contractor costs, as experienced industry wide. 

The Company is also studying several internal growth opportunities that could add further value to the asset base through increases to the gold production profile.  These include scoping studies on the large underground gold resource below Meadowbank�s Goose Island pit, the potential for expansion of the Pinos Altos reserves at depth and to the west of the Santo Nino pit, the 0.4 million ounce gold inferred resource at the Creston Mascota deposit (near Pinos Altos), and the deep underground mineralization at Kittila, which is currently being delineated.  Each of these deposits remains open for further expansion.  Additionally, the Company is already examining options to increase the production rate at its new Goldex mine.

�With several of our key gold deposits increasing in size, additional production growth is possible beginning in 2010.  The internal growth opportunities, combined with a conservative and measured approach to acquisitions will allow us to  steadily build per share value while maintaining a low political risk profile� said Mr. Boyd.

For the first six months of 2008, net income was $37.3 million, or $0.26 per share versus $62.7 million, or $0.49 per share, in the first six months of 2007.  The decrease was largely due to 35% lower zinc prices between the comparative periods.

For the first six months of 2008, cash provided by operating activities was $146.6 million, up from $135.9 million in the first half of 2007.  The increase was largely due to changes in working capital.

Conference Call Tomorrow

The Company will host its quarterly conference call on Thursday, July 24, 2008 at 11:00 a.m. (E.D.T.).  Management will review the Company�s financial results for the second quarter 2008 and provide an update of its exploration and development activities.

Via Webcast:
A live audio webcast of the call will be available on the Company�s website homepage at www.agnico-eagle.com

Via Telephone:
For those preferring to listen by telephone, please dial 416-644-3415 or Toll Free 1-800-732-9307.  To ensure your participation, please call approximately five minutes prior to the scheduled start of the call. 

Replay archive:
Please dial the toll-free access number 1-877-289-8525, passcode 21276635#.
The conference call will be replayed from Thursday, July 24, 2008 at 1:30 PM (E.D.T.) to Thursday, July 31, 2008 11:59 PM (E.D.T.). 

The webcast along with presentation slides will be archived for 180 days on the website.

LaRonde Mine - Strong Production and Cost Control Performance Continues

The LaRonde mill processed an average of 7,281 tonnes of ore per day in the second quarter of 2008, compared with an average of 7,470 tonnes per day in the second quarter of 2007.  LaRonde has now been operating at an average of more than 7,300 tonnes per day for more than four and a half years, continuing to demonstrate the reliability of this world class mine.

Minesite costs per tonne were C$68 in the second quarter.  These costs are slightly lower than the C$71 per tonne experienced in the second quarter of 2007, largely due to the benefit of the accelerated lateral development which was completed over the past year.

For the first six months of 2008, the minesite costs per tonne were on plan at C$66, as compared to the first six months of 2007 when the minesite costs per tonne were $67.  The slightly lower cost is largely due to the benefit of the accelerated lateral development, as discussed above.  

On a per ounce basis, net of byproduct credits, LaRonde�s total cash costs per ounce remained very low by industry standards, at $113 in the second quarter.  This compares with the results of the second quarter of 2007 when total cash costs per ounce were minus $699.  The increase in total cash costs is due to much lower byproduct revenues resulting mainly from lower realized prices, and payable production, for zinc.  Zinc production was lower due to the ongoing transition to the lower mine where the gold/copper grades are higher and the zinc/silver grades tend to be lower.

For the first six months of 2008, LaRonde�s total cash costs per ounce were minus $123, as compared to the first half of 2007 when the total cash costs per ounce were minus $490.  The higher costs were largely due to lower byproduct revenues, as discussed above.

Additionally, commercial lead concentrate from the new mill circuit was produced for the first time in May.

Cash Position Remains Strong, Despite Large Investments in Gold Growth; Advanced Negotiations on Larger Bank Facility

Cash and cash equivalents decreased to approximately $150.0 million at June 30, 2008 from the March 31, 2008 balance of $294.4 million.  As expected, all of the Company�s operating cash flow and a portion of its existing cash balances were reinvested in its gold growth projects.  During the quarter, Agnico-Eagle added $92.8 million of cash provided by operating activities.  Capital expenditures in the quarter totaled $266.6 million, including $67.2 million on the construction of Meadowbank, $18.7 million on Goldex, $66.7 million at Kittila, $10.6 million on the LaRonde Extension, $72.6 million at Pinos Altos and $20.5 million at Lapa.

In addition, during the second quarter, a $50 million strategic investment was made in Gold Eagle Mines Ltd.   Also, in the second quarter, the Company drew $75 million under its credit facility to help fund its growth investments.

To help maintain a conservative financial profile and superior liquidity, the Company is in advanced negotiations regarding the possibility of increasing the size of its bank credit facilities.  The current facility is $300 million with only $75 million drawn at June 30, 2008.

New Goldex Mine Now Operating; Four More New Gold Mines Under Construction

At the 100% owned Goldex mine in northwestern Quebec, proven and probable reserves are 1.6 million ounces of gold (23.1 million tonnes grading 2.2 grams per tonne).  Current reserves are estimated to be sufficient for a nine year mine life with expected annual production averaging 175,000 ounces.  With a large additional resource, the mine remains open for expansion.  Please see the table titled �Detailed Mineral Reserve and Resource Data � December 31, 2007� later in this press release for further detail.

The initial ore was fed into the Goldex mill in the third week of April and commercial production (70% capacity for 30 consecutive days) is expected to be declared in the third quarter.  Approximately 8,300 ounces of gold were poured during the second quarter.  The full production rate of 6,900 tonnes per day is expected by the fourth quarter 2008. 

A total of 38,659 metres of production drilling, representing 0.9 million tonnes of ore, were completed during the second quarter.  According to plan, a total of 1.4 million tonnes have been drilled so far in 2008.  Approximately 130,000 tonnes of ore are broken underground.   

Largely due to the slower than expected commissioning of the production hoist, the underground operation at Goldex has been slower to ramp-up than previously expected.  As a result, 2008 production at Goldex is now expected to total 60,000 ounces to 70,000 ounces rather than the previously expected 90,000 ounces. 

Construction commenced at the 100% owned Kittila mine project in northern Finland in the second quarter of 2006.  The project is expected to produce an average of 150,000 ounces of gold per year over its estimated mine life of 13 years.  Initial start-up is expected in the fourth quarter.  Kittila has probable gold reserves of 3.0 million ounces (18.2 million tonnes grading 5.1 grams per tonne). 

During the second quarter, an amended environmental permit was received.  Kittila now has all the necessary permits to construct and operate the mine.

Pit blasts in ore began in May.  At June 30, 2008, the ore stockpiles totaled 62,000 tonnes with average grade of 4.7 grams of gold per tonne.

The construction of the processing plant is ongoing.  During the quarter the focus was on electrical, piping and the lining of the autoclave.  The oxygen plant for the autoclave is complete, while  SAG mill installation is nearing completion.

A delay in start-up of Kittila is now anticipated.  This is due to slower than expected progress in the mill as a result of later than anticipated equipment deliveries and installation.  Gold production in 2008 is now expected to be 20,000 ounces to 30,000 ounces rather than the previous estimate of 50,000 ounces.

Considering the growth in reserves and resources to date, the Company has begun to contemplate future increases to the production rate and also methods to access the deeper mineralization at Kittila.  An exploration update, with the main focus on Kittila, is expected this quarter. 
 
At the 100% owned Lapa mine project in northwestern Quebec, the final phase of construction commenced in the second quarter of 2006.  Proven and probable gold reserves of 1.1 million ounces (3.8 million tonnes grading 8.9 grams per tonne) are expected to support estimated annual production of 125,000 ounces per year over an anticipated mine life of seven years. 

Lateral and vertical raise development is well underway with a lateral advance of more than 1,800 metres, and raise development of 1,385 metres completed during the second quarter.  Construction of the surface service facilities is proceeding well.  Initial production from Lapa is expected to begin in mid-2009.

At the 100% owned LaRonde mine in northwestern Quebec, construction commenced in the second quarter of 2006 on the new infrastructure to access the deep ore (the LaRonde Extension).  Proven and probable reserves of 5.0 million ounces (34.9 million tonnes grading 4.4 grams per tonne) are expected to support a mine life through 2021.  Annual gold production is anticipated to average 340,000 ounces over the remaining 14 year mine life, with the LaRonde Extension beginning production in 2011. 

During the second quarter, sinking of the internal shaft for the Extension began.  As planned, approximately 80 metres of advance was achieved.  Also, the fresh air intake at Level 218 and the exhaust raise excavation were started during the period.

At the 100% owned Pinos Altos mine project in northern Mexico, the property has probable gold reserves of 2.5 million ounces (24.7 million tonnes grading 3.2 grams per tonne).  Additionally, the property contains a large silver reserve of over 73.1 million ounces (from the same 24.7 million tonnes grading 92.2 grams per tonne).  The project was approved for construction in August 2007.  Average annual production is expected to be approximately 190,000 ounces of gold over an estimated 12 year mine life with start-up expected in the third quarter of 2009.

A new land and royalty agreement was finalized with the Pinos Altos landowner in May 2008. 

Project construction is underway.  Open pit stripping has commenced and had achieved the planned rate of 25,000 tonnes per day by the end of the second quarter.  Construction of the processing plant is expected to begin in September.

The construction of a 2,800 metre underground exploration ramp commenced in March 2007 and has advanced approximately 1,400 metres.  Additionally, the development of the production decline has advanced approximately 650 metres.

Three surface exploration drills and two underground exploration drills are currently operating at Pinos Altos.  Preliminary results of this program are planned to be released in the third quarter.  Based on the results obtained to date, there is good potential for expanding reserves at depth and along strike to the west of the Santo Nino pit.

Exploration drilling also continues on the Creston/Mascota area.  This region, approximately 10 kilometres northwest of the main Santo Nino deposit at Pinos Altos, currently has an inferred gold resource of 7.7 million tonnes grading 1.4 grams per tonne gold and 16.2 grams per tonne silver.   The resource could possibly be processed via heap leach although a milling option is also being contemplated.  Baseline engineering, community and environmental work has commenced. An initial scoping study, on what could be a stand-alone mining operation, is expected to be completed by the end of 2008.

Agnico-Eagle�s 100% owned Meadowbank project in Nunavut has probable gold reserves of 3.5 million ounces (29.3 million tonnes grading 3.7 grams per tonne).  With a large additional gold resource, the project remains open for expansion.  Initial gold production is anticipated in the first quarter 2010.  Annual gold production is currently estimated to average 360,000 ounces over the estimated nine year life of the mine. 

The final amended water License B was approved and received during the second quarter 2008.  Subsequently, the final water License A was approved and received.  Meadowbank now has all the necessary permits to operate the mine.

The all-weather road from the deep-water port at Baker Lake to the Meadowbank project site was also completed in the second quarter of 2008. 

Construction of the permanent camp facilities is underway and approximately 290 beds are now available. 

Pre-stripping of the Portage pit is underway, with the waste used in road construction and stockpiled for dyke construction.  Construction of the processing plant, power plant and service buildings are underway.

Agnico-Eagle is currently in the early stages of examining the underground mining potential at the southern end of the Meadowbank deposit, specifically below the Goose Island and Goose South deposits.  Currently three drills are operating.  The gold-bearing mineralization has been encountered to a depth of 500 metres and an exploration update on this project is expected later this year.

About Agnico-Eagle

Agnico-Eagle is a long established Canadian gold producer with operations located in Quebec and exploration and development activities in Canada, Finland, Mexico and the United States.  Agnico-Eagle's LaRonde Mine is Canada's largest gold deposit in terms of reserves.  The Company has full exposure to higher gold prices consistent with its policy of no forward gold sales.  It has paid a cash dividend for 26 consecutive years.

THIS PRESS RELEASE CONTAINS FINANCIAL STATEMENTS.  CLICK HERE TO VIEW ORIGINAL PDF VERSION OF THIS RELEASE.


For further information:
David Smith; VP, Investor Relations
(416) 947-1212

Renmark Financial Communications Inc.
John Boidman : jboidman@renmarkfinancial.com
Jen Power : jpower@renmarkfinancial.com
Media � Eva Jura : ejura@renmarkfinancial.com
Tel. : (514) 939-3989
Fax : (514) 939-3717
www.renmarkfinancial.com

Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Agnico-Eagle Mines Limited

PRODUCTEUR
CODE : AEM.TO
ISIN : CA0084741085
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Agnico Eagle Mines est une société de production minière d'or basée au Canada.

Agnico Eagle Mines est productrice d'or, d'argent, de cuivre, de plomb et de zinc au Canada, au Mexique et en Finlande, en développement de projets d'argent, de cuivre, d'or, de plomb et de zinc au Canada, et détient divers projets d'exploration au Canada.

Ses principaux projets en production sont LARONDE, LARONDE (EL COCO) MINE, MEADOWBANK et LARONDE EXTENSION au Canada, PINOS ALTOS au Mexique et KITTILA en Finlande, ses principaux projets en développement sont LAPA, GOLDEX et LARONDE au Canada et ses principaux projets en exploration sont BOUSQUET MINE, JOUTEL, NIGHTHAWK, GERMAN PROPERTY, MOUNTJOY PROPERTY, THORNLOE, REID, NW DELORO, CARR - WILKIE, WHITNEY TISDALE, WARK, EASTER DOME, MELIADINE, ELLISON, BOUSQUET AND ELLISON, COLOMAC MINE, CABALLO BLANCO PROPERTY et VICTORY LAKE au Canada et MORELOS SUR au Mexique.

Agnico Eagle Mines est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 24,1 milliards CA$ (17,8 milliards US$, 16,0 milliards €).

La valeur de son action a atteint son plus bas niveau récent le 29 octobre 1999 à 10,10 CA$, et son plus haut niveau récent le 06 septembre 2024 à 104,31 CA$.

Agnico Eagle Mines possède 230 990 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Agnico-Eagle Mines Limited
2008 Annual Report
Annual Report 2007
Financements de Agnico-Eagle Mines Limited
21/01/2015Agnico Eagle announces sale of Probe shares and warrants
26/04/2013Kootenay closes $4.75M Private Placement with Agnico-Eagle M...
16/08/2007Expiry Of Warrants
Nominations de Agnico-Eagle Mines Limited
19/03/2015Agnico Eagle Announces Senior Management Appointments and Pr...
Rapports Financiers de Agnico-Eagle Mines Limited
01/05/2014Agnico Eagle reports first quarter 2014 operating and financ...
13/02/2014Agnico Eagle reports fourth quarter and full year 2013 resul...
23/10/2013Agnico Eagle reports third quarter 2013 results - Strong ope...
24/07/2013Agnico Eagle reports second quarter 2013 results - Significa...
12/10/2011AGNICO-EAGLE PROVIDES THIRD QUARTER OPERATING UPDATE; ANNOUN...
12/10/2011Provides Third Quarter Operating Update; Announces Expanded ...
27/07/2011(angl) reports second quarter 2011 results; Provides explora...
07/07/2011AGNICO-EAGLE PROVIDES NOTICE OF RELEASE FOR SECOND QUARTER 2...
02/05/2011Reports First Quarter 2011 Results
17/02/2011Reports Fourth Quarter and Full Year 2010 Results; New Mines...
23/07/2008Reports Second Quarter 2008 Results
02/04/2008Provides notice of release of first quarter 2008 results; Se...
20/02/2008Reports Record Fourth Quarter 2007 Results
25/10/2007Reports Strong Third Quarter 2007 Results and Steady Progres...
01/10/2007Provides Notice of Release Of Third Quarter 2007 Results
04/07/2007Provides notice of release of second quarter 2007 results
Projets de Agnico-Eagle Mines Limited
21/09/2015Agnico Eagle provides Mexican exploration update - El Barque...
28/11/2014Agnico Eagle completes acquisition of Cayden Resources Inc.
29/10/2014Gold miner Agnico earnings miss but raises output forecasts
29/10/2014Canada gold miner Agnico Eagle Mines reports loss on one-off...
05/12/2011(Goldex)files new technical report on Goldex confirming reclassifica...
27/07/2011(Goldex)(angl) reports second quarter 2011 results; Provides explora...
28/06/2011AGNICO-EAGLE PROVIDES AN UPDATE ON ITS NUNAVUT OPERATIONS IN...
29/04/2011(Kittila)Announces Expanded Mineralization at Kittila, Goldex and Mel...
13/03/2011(Meadowbank)reports fire at its kitchen facilities at its Meadowbank min...
30/04/2010(Meadowbank)reports Q1 2010 results; Record quarterly revenue and gold p...
20/02/2009(Meliadine)43-101 Mivon technical report
16/12/2008(Pinos Altos)completes purchase of surface rights at Pinos Altos; Funded ...
17/11/2008(Kittila)hosts analyst and investor tour at Kittila gold mine in nort...
15/02/2008(Pinos Altos)'s gold reserves and resources at record levels; gold zones ...
05/06/2006(Lapa)to build Kittila gold mine in Finland and complete construct...
Communiqués de Presse de Agnico-Eagle Mines Limited
28/07/2016Agnico beats 2Q profit forecasts
27/07/2016Mid-Year 2016 Exploration Update: Expansion of Whale Tail an...
27/07/2016Mid-Year 2016 Exploration Update: Expansion of Whale Tail an...
27/07/2016Mid-Year 2016 Exploration Update: Expansion of Whale Tail an...
27/07/2016Mid-Year 2016 Exploration Update: Expansion of Whale Tail an...
27/07/2016Mid-Year 2016 Exploration Update: Expansion of Whale Tail an...
27/07/2016Mid-Year 2016 Exploration Update: Expansion of Whale Tail an...
27/07/2016Mid-Year 2016 Exploration Update: Expansion of Whale Tail an...
27/07/2016Mid-Year 2016 Exploration Update: Expansion of Whale Tail an...
27/07/2016Mid-Year 2016 Exploration Update: Expansion of Whale Tail an...
27/07/2016Mid-Year 2016 Exploration Update: Expansion of Whale Tail an...
27/07/2016Agnico Eagle Reports Second Quarter 2016 Operating and Finan...
27/07/2016Agnico Eagle Reports Second Quarter 2016 Operating and Finan...
27/07/2016Agnico Eagle Reports Second Quarter 2016 Operating and Finan...
27/07/2016Agnico Eagle Reports Second Quarter 2016 Operating and Finan...
27/07/2016Agnico Eagle Reports Second Quarter 2016 Operating and Finan...
27/07/2016Agnico Eagle Reports Second Quarter 2016 Operating and Finan...
27/07/2016Agnico Eagle Reports Second Quarter 2016 Operating and Finan...
27/07/2016Agnico Eagle Reports Second Quarter 2016 Operating and Finan...
27/07/2016Agnico Eagle Reports Second Quarter 2016 Operating and Finan...
27/07/2016Agnico Eagle Reports Second Quarter 2016 Operating and Finan...
27/07/2016How to View Gold Mining Earnings for Barrick, Goldcorp, Kinr...
25/07/2016Agnico Eagle announces additional investment in Belo Sun
20/07/2016Coverage Initiated on Select Canadian Basic Material Stocks ...
23/06/2016Agnico Eagle Provides Notice of Release of Second Quarter 20...
29/04/2016Agnico Eagle Announces Election of Directors
28/04/2016Agnico beats 1Q profit forecasts
28/04/2016Agnico Eagle Reports First Quarter 2016 Operating and Financ...
06/04/2016Agnico Eagle provides notice of release of first quarter 201...
11/02/2016Agnico reports 4Q loss
19/01/2016Today’s Top Gold Miner Is Barrick; Which Will It Be Tomorrow...
15/01/2016Investors Fearlessly Buying These 5 Stocks Amid Sinking Mark...
14/01/2016New ADX Uptrends In These 3 Gold Miners
08/01/20162 Top RBC Gold Stock Picks for Investors Worried About a Cra...
30/12/2015Gold Miner Outlook: Which Stocks Are Worth Their Weight in G...
25/12/2015Striking Gold: Agnico and Goldcorp Offer a Long-Term Upside
24/12/2015Why Have Newmont and Agnico Outperformed?
16/12/2015Five Gold Mining Stocks to Own Now
02/12/2015Do Hedge Funds Love IDEX Corporation (IEX)?
30/11/2015Barclays' Year-In-Review On Gold
27/11/2015Do Hedge Funds Love Allegion PLC (ALLE)?
30/10/2015Agnico Eagle (AEM) Q3 Earnings & Revenues Beat Estimates
30/10/2015Why Growth in Gold Production Is Important for Gold Miners
29/10/2015Edited Transcript of AEM.TO earnings conference call or pres...
28/10/2015Agnico Eagle Reports Record Third Quarter 2015 Gold Producti...
07/10/2015Almadex Minerals Options Gold Project in Mulatos Camp, Mexic...
05/10/20155 Commodity Stocks Marching Higher in October
30/09/2015Agnico Eagle Provides Notice of Release of Third Quarter 201...
04/09/2015Edited Transcript of AEM.TO earnings conference call or pres...
20/08/2015Agnico Eagle Announces 35% Increase in Inferred Resource at ...
19/08/2015Agnico Eagle Announces 35% Increase in Inferred Resource at ...
31/07/2015Edited Transcript of AEM.TO earnings conference call or pres...
29/07/2015Agnico Eagle Reports Second Quarter 2015 Results; Strong Ope...
29/07/2015Agnico Eagle Reports Second Quarter 2015 Results; Strong Ope...
29/07/2015Agnico Eagle Reports Second Quarter 2015 Results; Strong Ope...
29/07/2015Agnico Eagle Reports Second Quarter 2015 Results; Strong Ope...
29/07/2015Agnico Eagle Reports Second Quarter 2015 Results; Strong Ope...
29/07/2015Agnico Eagle Reports Second Quarter 2015 Results; Strong Ope...
29/07/2015Agnico Eagle Reports Second Quarter 2015 Results; Strong Ope...
29/07/2015Agnico Eagle Reports Second Quarter 2015 Results; Strong Ope...
29/07/2015Agnico Eagle Reports Second Quarter 2015 Results; Strong Ope...
29/07/2015Agnico Eagle Reports Second Quarter 2015 Results; Strong Ope...
29/07/2015Agnico Eagle Reports Second Quarter 2015 Results; Strong Ope...
29/07/2015Agnico Eagle Reports Second Quarter 2015 Results; Strong Ope...
29/07/2015Agnico Eagle Reports Second Quarter 2015 Results; Strong Ope...
29/07/2015Agnico Eagle Reports Second Quarter 2015 Results; Strong Ope...
30/04/2015Agnico Eagle Reports First Quarter 2015 Operating and Financ...
30/04/2015Agnico Eagle Reports First Quarter 2015 Operating and Financ...
30/04/2015Agnico Eagle Reports First Quarter 2015 Operating and Financ...
30/04/2015Agnico Eagle Reports First Quarter 2015 Operating and Financ...
30/04/2015Agnico Eagle Reports First Quarter 2015 Operating and Financ...
24/04/2015Lower Profits, Output on Tap for Barrick, Goldcorp -- Earnin...
23/04/2015Investor sees top in Agnico Eagle
14/04/2015UPDATE 3-Canada's Alamos Gold, AuRico merger may spark rival...
13/04/2015Canada's Alamos Gold, AuRico merger may spark rival bids
31/03/20155 Top Gold Stocks in 2015 Q1
23/03/2015Agnico Eagle Announces Senior Management Appointments and Pr...
19/03/2015Agnico hires former Barrick Gold CFO Ammar Al-Joundi as pres...
19/03/2015Agnico Eagle Announces Senior Management Appointments and Pr...
13/03/2015Agnico Eagle completes updated NI 43-101 technical report on...
11/02/2015Agnico Eagle quarterly adjusted earnings beat market
11/02/2015Agnico Eagle reports fourth-quarter loss on non-cash items
11/02/2015Agnico Eagle reports fourth quarter and full year 2014 resul...
29/01/2015Agnico Eagle announces sale of Probe shares and warrants
09/01/2015Agnico Eagle Provides Notice of Release of Fourth Quarter 20...
28/11/2014Agnico Eagle completes acquisition of Cayden Resources Inc.
26/11/2014Canada Stocks to Watch: Golds and Pacific Rubiales
13/11/2014S&P Dow Jones Indices Announces Changes to the S&P/TSX Canad...
11/11/2014Agnico Eagle completes major drill program at Amaruq project...
29/10/2014Agnico Eagle reports third quarter 2014 results - 2014 Gold ...
29/10/2014Agnico Eagle reports third quarter 2014 results - 2014 Gold ...
29/10/2014Agnico Eagle reports third quarter 2014 results - 2014 Gold ...
29/09/2014(Meadowbank)Agnico Eagle's Amaruq project (formerly "IVR") near Meadowba...
08/09/2014Agnico Eagle to Acquire Cayden Resources
13/08/2014Technical report filed on the Canadian Malartic mine
27/06/2014Agnico Eagle provides notice of release of second quarter 20...
01/04/2014Agnico Eagle provides notice of release of first quarter 201...
27/01/2014Agnico Eagle provides notice of release of fourth quarter 20...
20/12/2013Agnico Eagle announces investment in Pershimco Resources Inc...
01/10/2013Agnico Eagle provides notice of release of third quarter 201...
08/07/2013Agnico Eagle provides notice of release of second quarter 20...
08/07/2013Agnico Eagle provides notice of release of second quarter 20...
16/05/2013Agnico Eagle Completes Acquisition of Urastar
23/04/2013Kootenay Announces Strategic Investment by Agnico-Eagle Mine...
23/04/2013announces investment in Kootenay Silver Inc.
18/04/2013Alliance Updates Mexico Gold Assets between Agnico-Eagle’s ...
04/04/2013provides notice of release of first quarter 2013 results, co...
26/03/2013Alliance Mining Initiates 43-101 on its Gold Assets between ...
15/01/2013Provides Notice of Release for Fourth Quarter 2012 Results a...
12/12/2012- Dividend Increased 10% - Declared For 31st Consecutive Yea...
14/10/2011commences formal take-over bid to acquire Grayd
13/10/2011Agnico-Eagle commences formal take-over bid to acquire Grayd
23/09/2011AGNICO-EAGLE BECOMES SIGNATORY TO INTERNATIONAL CYANIDE MANA...
22/09/2011and Grayd enter into a definitive agreement whereby Agnico-E...
19/09/2011Agnico-Eagle and Grayd enter into a definitive agreement whe...
02/08/2011Agnico-Eagle reports second quarter 2011 results; Provides e...
30/05/2011Reports Investment in Colibri Resource Corporation
28/07/2010Reports Q2 2010 results; record quarterly revenue, net inco...
07/07/2010completes acquisition of Comaplex
04/05/2010enters into a definitive agreement to acquire Comaplex
20/04/2010Comaplex and Agnico-Eagle announce extension of exclusivity ...
07/04/2010closes $600,000,000 issuance of long-term unsecured notes
24/03/2010reports investment in Alexandria Minerals Corporation
19/03/2010to issue $600,000,000 of long-term unsecured notes
29/07/2009Reports Q2 2009 Results
18/02/2009reports 2008 results; Record quarterly and annual gold produ...
06/11/2008=5B=3F=3F Probable Spam=5D Agnico-Eagle Mines Limited visit...
04/09/2008Doubles Credit Lines to US$600 Million
31/07/2008announces refinancing transaction with Stornoway Diamond Cor...
23/07/2008/ CEO - INTERVIEW
16/07/2008Senior VP Financial & CFO Interview
14/07/2008Agrees to Purchase Investment in Comaplex Minerals
18/06/2008strengthens Board and management
03/03/2008Reports Investment in Forum Uranium Corp. and Concurrent Opt...
08/01/2008CFO Interview
20/11/2007 Receives $130,640,561 and Issues 6,875,819 Common Shares on...
09/07/2007Completes Compulsory Acquisition Of Remaining Cumberland Com...
27/06/2007Expands Gold Zones at Pinos Altos; Signs Option to Acquire E...
14/06/2006conclut son placement d'actions ordinaires
12/01/2006RESEARCH : Follow up N° 18
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (AEM.TO)NYSE (AEM)
104,31-1.94%76,89-2.31%
TORONTO
CA$ 104,31
06/09 17:00 -2,06
-1,94%
Cours préc. Ouverture
106,37 106,22
Bas haut
103,82 106,89
Année b/h Var. YTD
61,03 -  112,44 44,77%
52 sem. b/h var. 52 sem.
59,62 -  112,44 61,42%
Volume var. 1 mois
629 865 3,25%
24hGold TrendPower© : 5
Produit Copper - Gold - Silver - Zinc
Développe Copper - Gold - Silver - Zinc
Recherche Copper - Gold - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 24/02/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
202443,58%99,89100,03
20233,25%82,9059,36
20226,56%84,6648,88
2021-26,30%97,2160,27
202011,68%99,66100,81
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
6,94 AU$-1,14%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
8,41 US$-3,67%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,59 GBX+1,21%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,05 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,06 CA$-0,96%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
11,47 CA$-4,50%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,30 CA$-1,67%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,18 AU$+5,71%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,60 CA$-3,03%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
41,34 US$-1,76%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :
Profitez de la hausse des actions aurifères
  • Inscrivez-vous à notre market briefing minier
    hebdomadaire
  • Recevez nos rapports sur les sociétés qui nous semblent
    présenter les meilleurs potentiels
  • Abonnement GRATUIT, aucune sollicitation
  • Offre limitée, inscrivez-vous maintenant !
Accédez directement au site.