Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
Cours Or & Argent

VanEck Vectors Global Alternative Energy ETF

Publié le 01 mai 2012

Reports Summer-Fall 2011 Drilling Results for the Raven and Horseshoe Deposits and Advancement of Hi

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Report | Uranium |
Tuesday, May 01, 2012

UEX Reports Summer-Fall 2011 Drilling Results for the Raven and Horseshoe Deposits and Advancement of Hidden Bay Development

UEX Corporation ("UEX") is pleased to announce final drilling results from the summer-fall 2011 drilling program at the Horseshoe and Raven deposits, which are located within UEX's 100%-owned Hidden Bay Project in the eastern Athabasca Basin of northern Saskatchewan, Canada. The program consisted mainly of definition and step-out drilling in the Raven Deposit ("Raven") and several infill drill holes at the Horseshoe Deposit ("Horseshoe"). The drilling program comprised 63 drill holes totaling 16,457 metres which were designed primarily to test the continuity and potential for expansion of higher grade portions of the Raven Deposit, and also served to provide geotechnical information for application to the ongoing economic analysis of the deposits. Results have validated the continuity of mineralization in the deposits, and expanded portions of the higher grade parts of the Raven Deposit.

Raven Drilling Results
Fifty-seven holes totaling 14,750 metres were drilled at Raven to:

1) test for additional continuity of higher grade areas of mineralization (>0.1% U3O8) that could provide higher grade underground mining targets; and

2) drill step-out holes to test continuity of mineralization into new areas, principally in eastern parts of the Raven Deposit.

Significant results are as follows, and additional composites are listed in Table 1:

  RU-243
RU-246
RU-248
RU-252
RU-254

RU-256
RU-260
RU-262
RU-276
RU-279
RU-281
    0.274% U3O8 over 17.5 metres (section 5780E);
0.445% U3O8 over 20.5 metres (section 5725E);
0.414% U3O8 over 17.6 metres (section 5755E);
1.492% U3O8 over 3.0 metres (section 5665E);
0.119% U3O8 over 18.5 metres and
0.125% U3O8 over 21.0 meters (section 5476E);
0.340% U3O8 over 5.2 metres (section 5445E);
0.230% U3O8 over 11.0 metres (section 5025E);
0.128% U3O8 over 15.0 metres (section 5423E);
0.226% U3O8 over 13.5 metres (section 5290E);
0.206% U3O8 over 24.0 metres (section 5335E); and
1.538% U3O8 over 1.5 metres (section 5347E).

True thickness of these intercepts has not yet been determined. Drill holes RU-243 and RU 248 will allow for the extension of the Raven Deposit for at least 30 metres eastward from its previously modeled outline. These results are higher grade than previous drilling intercepts in this area.

The results of this program are being incorporated into the Raven wireframe model, with the objective of providing additional information that will form part of a future preliminary feasibility study for the Horseshoe and Raven deposits.

In addition to drill holes which intersected the Raven Deposit, further drill holes were completed to the east of and surrounding the deposit to explore for new mineralized areas within or close to potential future mining infrastructure. No significant uranium mineralization was intersected in these drill holes. These drill holes did, however, provide geotechnical information related to open pit and underground mining design, including possible ramp access for underground development.

Horseshoe Drilling Results
Six drill holes totaling 1,707 metres were completed at, or adjacent to, Horseshoe to provide further information about the continuity and extent of mineralization within and adjacent to the Horseshoe Deposit, and to supply additional geotechnical data in the deposit area. Significant drilling intercepts are listed in Table 1 and include the following:

  HU-368
HU-370
HU-371
    0.177% U3O8 over 12.0 metres (section 4307N);
0.098% U3O8 over 32.0 metres (section 4561N); and
0.495% U3O8 over 11.0 metres
including 3.295% U3O8 over 1.0 metre (section 4695N).

These results confirm continuity of mineralization in the Horseshoe A and B zones and, based on known morphology of these zones, are at or close to true thickness. Additional step-out holes in the Horseshoe area did not intercept any significant mineralization but, since they were drilled outside of the known resources, these have no impact on the current resource model.

Hidden Bay Development
UEX is committed to advancing the Hidden Bay Project and, in this regard, has engaged SRK Consulting (Canada) Inc. to conduct engineering studies on the Horseshoe, Raven and West Bear deposits. These studies will further examine the economic viability of mining the Horseshoe and Raven deposits as a combined open pit and underground ramp access operation and assess a variety of processing options as well as the suitability of the Raven pit as a tailings management facility. This work follows on the previously released Preliminary Assessment which was completed in February 2011 (see UEX news release of February 23, 2011) and will form components of a future preliminary feasibility study. UEX has also commenced preliminary discussions with the owners of the nearby McClean Lake and Rabbit Lake mills regarding the processing of ore from the Horseshoe, Raven and West Bear deposits.

A $2.0-million budget has been proposed for development at the Hidden Bay Project in 2012 which will include the following:
  • Geochemical, geotechnical and metallurgical studies;
  • Pit hydrogeology and hydrology studies;
  • Mine engineering and infrastructure analysis;
  • Waste management and environmental studies;
  • Continued evaluation of the suitability of the proposed Raven open pit as a tailings management facility; and
  • Resource review and economic analysis.
About the Horseshoe and Raven Deposits
The Horseshoe and Raven deposits are located in the central portion of UEX's 100%-owned Hidden Bay Project which also contains the West Bear Deposit. Mineralization at the Horseshoe and Raven deposits comprises shallow dipping zones of hematization with disseminated and veinlet pitchblende-boltwoodite-uranophane that are hosted by folded arkosic quartzite gneiss. The two deposits are located approximately 4 kilometres south of Cameco's Rabbit Lake milling operation, and 22 kilometres southeast of AREVA's McClean Lake milling operation. As previously announced in July 2009, the Horseshoe and Raven deposits collectively contain, at a cut-off grade of 0.05% U3O8, mineral resource estimates of:
  • 35.04 million pounds of U3O8 grading 0.155% U3O8 in the Indicated category; and
  • 2.72 million pounds of U3O8 grading 0.111% U3O8 in the Inferred category.
These mineral resource estimates are supported by a technical report on the Hidden Bay property with an effective date of February 15, 2011, filed on SEDAR at www.sedar.com on February 23, 2011. Note that Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability

Further information regarding UEX's projects, including maps and cross sections, is available on UEX's website www.uex-corporation.com.

Qualified Persons
Technical information in this news release has been reviewed and approved by R. Sierd Eriks, P.Geo., UEX's Vice-President of Exploration, and David Rhys, P.Geo., UEX Advisory Board member, who are each Qualified Persons as defined by National Instrument 43-101.

About UEX
UEX is a Canadian uranium exploration and development company actively involved in 18 uranium projects, including six that are 100% owned and operated by UEX, one joint venture with AREVA that is operated by UEX, as well as ten joint-ventured with AREVA and one under option from JCU (Canada) Exploration Company, Limited, which are operated by AREVA. The 18 projects, totaling 308,320 hectares (761,875 acres), are located in the eastern, western and northern perimeters of the Athabasca Basin, the world's richest uranium belt, which accounts for approximately 17% of the global primary uranium production.

UEX's two major projects have mineral resource estimates as follows:

UEX Corporation -- Indicated Mineral Resources (1) (2) (3)

Project Tonnes Grade
U3O8 (%)
Total
U3O8 (lbs)
UEX's share
U3O8 (lbs)
Shea Creek (4)
1,872,600
1.540
63,572,000
31,150,280
Hidden Bay (5)
10,372,500
0.160
36,623,000
36,623,000
TOTAL INDICATED
12,245,100
0.371
100,195,000
67,773,280

UEX Corporation -- Inferred Mineral Resources (1) (2) (3)

Project
Tonnes
Grade
U3O8 (%)
Total
U3O8 (lbs)
UEX's share
U3O8 (lbs)
Shea Creek (4)
1,068,900
1.041
24,525,000
12,017,250
Hidden Bay (5)
1,109,200
0.111
2,715,000
2,715,000
TOTAL INFERRED
2,178,100
0.567
27,240,000
14,732,250
Notes:
  1. The mineral resource estimates follow the requirements of National Instrument 43-101 -- Standards of Disclosure for Mineral Projects and classifications follow CIM definition standards.
  2. The Shea Creek mineral resources were estimated at a cut-off of 0.30% U3O8.
  3. The Hidden Bay mineral resources were estimated at a cut-off of 0.05% U3O8.
  4. The Shea Creek mineral resource estimates are included in the Shea Creek Technical Report with an effective date of May 26, 2010 which was filed on SEDAR at www.sedar.com on July 9, 2010.
  5. The Hidden Bay mineral resource estimates are included in the Hidden Bay Technical Report with an effective date of February 15, 2011 which was filed on SEDAR at www.sedar.com on February 23, 2011.
UEX is currently advancing several uranium deposits at its two major projects which include the Kianna, Anne, Colette and 58B deposits at its 49%-owned Shea Creek Project, a joint venture with AREVA in the western Athabasca Basin, and the Horseshoe, Raven and West Bear deposits located at its 100%-owned Hidden Bay Project in the eastern Athabasca Basin.

FOR FURTHER INFORMATION PLEASE CONTACT

Graham C. Thody
President & CEO
(604) 669-2349

Forward-Looking Information
This news release may contain statements that constitute "forward-looking information" for the purposes of Canadian securities laws. Such statements are based on UEX's current expectations, estimates, forecasts and projections. Such forward-looking information includes statements regarding UEX's mineral resource and mineral reserve estimates, outlook for our future operations, plans and timing for exploration activities, and other expectations, intention and plans that are not historical fact. The words "estimates", "projects", "expects", "intends", "believes", "plans", or their negatives or other comparable words and phrases are intended to identify forward-looking information. Such forward-looking information is based on certain factors and assumptions and is subject to risks, uncertainties and other factors that could cause actual results to differ materially from future results expressed or implied by such forward-looking information. Important factors that could cause actual results to differ materially from UEX's expectations include uncertainties relating to interpretation of drill results and geology, additional drilling results, continuity and grade of deposits, participation in joint ventures, reliance on other companies as operators, public acceptance of uranium as an energy source, fluctuations in uranium prices and currency exchange rates, changes in environmental and other laws affecting uranium exploration and mining, and other risks and uncertainties disclosed in UEX's Annual Information Form and other filings with the applicable Canadian securities commissions on SEDAR. Many of these factors are beyond the control of UEX. Consequently, all forward-looking information contained in this news release is qualified by this cautionary statement and there can be no assurance that actual results or developments anticipated by UEX will be realized. For the reasons set forth above, investors should not place undue reliance on such forward-looking information. Except as required by applicable law, UEX disclaims any intention or obligation to update or revise forward-looking information, whether as a result of new information, future events or otherwise.


Table 1

Summer-Fall 2011 Raven (RU-) and Horseshoe (HU-) Drilling Program Intersections from Drill Holes HU-368 to HU-371 and RU-227 to RU-282

Only intervals with composite grades greater than 0.05% U3O8 and a grade-thickness product greater than 0.1 are listed below. All analyses were performed by Saskatchewan Research Council by ICP. No intervals greater than 0.05% U3O8 and a grade thickness product higher than 0.1 were intersected in holes RU-227, 229-233, 235, 236, 238, 241, 242, 244, 245, 247, 249, 253, 257-259, 263-267, 269-271 and 278.

Hole Area From (metres) To      (metres) Length (metres) Avg.   Grade (% U3O8)
HU-368 Horseshoe Infill 176.00 188.00 12.00 0.177
including   184.00 188.00 4.00 0.279
HU-368   213.00 227.00 14.00 0.054
HU-368   232.00 233.00 1.00 0.123
HU-368   240.00 245.00 5.00 0.182
HU-368   259.50 263.00 3.50 0.072
HU-369 Horseshoe Infill 206.50 208.50 2.00 0.352
HU-370 Horseshoe infill 318.00 319.00 1.00 0.104
HU-370   332.00 364.00 32.00 0.098
including   332.50 340.00 7.50 0.199
HU-371 Horseshoe Infill 273.50 285.00 11.50 0.055
HU-371   299.50 302.00 2.50 0.092
HU-371   319.00 330.00 11.00 0.495
including   321.00 325.00 4.00 1.143
including   321.50 322.50 1.00 3.295
HU-371 Horseshoe Infill 344.50 345.00 0.50 0.253
RU-228 Raven Step-out 116.50 117.50 1.00 0.119
RU-228   156.00 158.50 2.50 0.081
RU-234 Raven Step out 170.00 171.50 1.50 0.081
RU-234   209.00 210.00 1.00 0.149
RU-237 Raven Exploration 217.60 218.90 1.30 1.053
RU-239 Raven Exploration 120.00 122.50 2.50 0.081
RU-243 Raven Step-out 108.00 125.50 17.50 0.274
including   111.00 114.50 3.50 0.631
RU-246 Raven Infill 117.00 137.50 20.50 0.445
including   118.50 121.60 3.10 0.761
including   128.00 137.50 9.50 0.666
including   131.00 133.10 2.10 1.676
RU-248 Raven Step-out 127.90 145.50 17.60 0.414
including   141.50 145.00 3.50 0.937
RU-251 Raven Infill 248.50 249.00 0.50 0.282
RU-251   301.70 303.00 1.30 0.127
RU-252 Raven Infill 181.00 184.00 3.00 1.492
RU-254 Raven Infill 96.00 114.50 18.50 0.119
including   104.30 107.50 3.20 0.579
RU-254   132.00 153.00 21.00 0.125
including   137.00 143.00 6.00 0.196
RU-254   209.50 214.00 4.50 0.158
RU-254   259.40 260.00 0.60 0.182
RU-255 Raven Infill 293.80 294.50 0.70 0.159
RU-256 Raven Infill 99.80 105.00 5.20 0.340
including   99.80 102.00 2.20 0.602
RU-256   220.00 231.00 11.00 0.111
RU-260 Raven Infill 238.00 249.00 11.00 0.230
including   243.00 249.00 6.00 0.383
RU-261 Raven Infill 254.00 257.50 3.50 0.055
RU-261   264.50 276.00 11.50 0.091
RU-261   294.50 297.00 2.50 0.128
RU-262 Raven Infill 114.50 116.50 2.00 0.106
RU-262   126.50 136.00 9.50 0.050
RU-262   269.00 284.00 15.00 0.128
including   282.50 284.00 1.50 0.838
RU-268 Raven Infill 150.00 153.00 3.00 0.108
RU-268   306.50 307.00 0.50 0.245
RU-272 Raven Infill 188.50 189.00 0.50 0.262
RU-272   279.00 286.60 7.60 0.125
RU-272   297.00 301.00 4.00 0.073
RU-273 Raven Infill 88.50 92.50 4.00 0.063
RU-273   153.00 155.00 2.00 0.055
RU-273   169.00 171.00 2.00 0.062
RU-274 Raven Infill 106.50 115.00 8.50 0.049
RU-274   202.00 214.00 12.00 0.060
RU-275 Raven Infill 263.00 276.00 13.00 0.097
RU-276 Raven Infill 211.50 225.00 13.50 0.226
including   211.50 214.00 2.50 0.552
including   223.00 225.00 2.00 0.812
RU-277 Raven Infill 258.00 265.00 7.00 0.117
RU-277   283.00 286.50 3.50 0.058
RU-279 Raven Infill 82.00 106.00 24.00 0.206
including   86.50 92.50 6.00 0.370
including   101.00 106.00 5.00 0.345
RU-280 Raven Infill 135.00 137.00 2.00 0.131
RU-281 Raven Infill 64.50 66.00 1.50 1.538
including   65.00 65.50 0.50 3.260
RU-281   176.00 178.00 2.00 0.108
RU-282 Raven Infill 202.00 209.00 7.00 0.070

Associated File: http://www.uex-corporation.com/i/pdf/nr/News-Release-Horseshoe-Raven-2011-Drilling-May-01-2.pdf
381 KB in size, approx. 1 minute, 12 seconds to download at 56.6Kbps
      
This email was sent to:.com      
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

VanEck Vectors Global Alternative Energy ETF

EXPLORATEUR
CODE : UEX.TO
ISIN : CA9026661061
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

UEX est une société d’exploration minière d'or et de cuivre basée au Canada.

UEX détient divers projets d'exploration au Canada.

Ses principaux projets en exploration sont BLACK LAKE, RIOU LAKE, BEATTY RIVER, DOUGLAS, NORTHERN ATHABASCA PROJECTS, WESTERN ATHABASCA PROJECTS, FOND DU LAC, SHEA CREEK, HIDDEN BAY, ALEXANDRA, BRANDER LAKE PROJECTS et JAMES CREEK PROJECTS au Canada.

UEX est cotée au Canada et en Allemagne. Sa capitalisation boursière aujourd'hui est 23,5 millions (18,8 millions US$, 18,8 millions €).

La valeur de son action a atteint son plus bas niveau récent le 15 août 2003 à 0,05 , et son plus haut niveau récent le 09 novembre 2007 à 9,30 .

UEX possède 47 442 200 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de VanEck Vectors Global Alternative Energy ETF
18/05/2016Closes $7.25 Million Combined Flow-Through and Hard Dollar P...
05/06/2013Announces Closing of Private Placement
25/05/2013Announces $3.175 Million Private Placement
23/02/2012Announces $3 Million Private Placement
Nominations de VanEck Vectors Global Alternative Energy ETF
19/12/2013Announces the Appointment of Roger Lemaitre as President and...
29/04/2011appoints Ed Boney as Chief Financial Officer
27/05/2010Appoints Walter Segsworth and David Rhys to its Management A...
Rapports Financiers de VanEck Vectors Global Alternative Energy ETF
06/11/2013Third Quarter 2013 Financial Results and MD&A
Projets de VanEck Vectors Global Alternative Energy ETF
07/01/20142014 Joint Venture Exploration Programs Commence
04/06/2013(Shea Creek)Announces Additional $2.0 Million Drilling Budget for Shea C...
10/04/2013(Shea Creek)Secures Right to Fund $18 Million in Additional Drilling at ...
20/03/2013(Shea Creek)/AREVA Announce $3.1 Million Budget for Shea Creek Spring/Su...
13/02/2013(Black Lake)Regarding Uracan's Option for Black Lake Project in the Atha...
26/04/2012(Shea Creek)/AREVA 2012 Shea Creek Drilling Program Underway
16/02/2012(Hidden Bay)Commences Winter 2012 Hidden Bay Drilling Program
30/11/2011(Shea Creek)Announces Shea Creek Drilling Budget of $6 Million for 2012
09/08/2011(Hidden Bay)Commences 18,000 Metre Summer Drilling Program at Hidden Bay
24/02/2011(Western Athabasca Projects)/AREVA 2011 Western Athabasca Basin Drilling Programs Underw...
18/02/2010(Hidden Bay)Receives West Bear Preliminary Feasibility Study Reporting P...
27/01/2010(Shea Creek)2010 Western Athabasca Basin Drilling Programs Underway with...
06/01/2010(Hidden Bay)Reports Results of Summer 2009 Exploration on the Hidden Bay...
23/07/2009(Hidden Bay)Reports Significantly Expanded Resource Estimates for the Ho...
25/02/2009(Shea Creek)2009 Drill Program Underway at Shea Creek with Three Drills
12/01/2009(Shea Creek)/AREVA Drilling in the Prospective Corridor at Shea Creek Co...
05/01/2009Reports N.I. 43-101 Compliant Mineral Resource Estimate for ...
29/09/2008(Hidden Bay)reports N.I. 43-101 compliant mineral resource for Horseshoe...
18/06/2008/AREVA Drilling Outlines New Zone of High-grade Mineralizati...
17/01/2008(Hidden Bay) Launches Largest Winter Drilling Program at Hidden Bay with...
15/01/2008(Shea Creek)UEX/AREVA Launch Largest Drill Program to Date at Shea Creek...
05/12/2007(Shea Creek)/AREVA Plan $20.3 Million Program at Shea Creek for 2008 Whi...
04/12/2007(Shea Creek)/AREVA Report Additional High-Grade Basement-Hosted Minerali...
14/11/2007/AREVA Report High-Grade Basement-Hosted Mineralization in t...
18/10/2007Report Second-Best Hole Ever at the Anne Deposit Intersectin...
04/09/2007(Shea Creek)/AREVA to Commence Shea Creek Drilling Program with Three Dr...
21/08/2007(Black Lake)Extends Uranium Mineralization at Black Lake Hole BL-140 Int...
23/07/2007Reports Best Hole Ever from West Bear Deposit: Hole UEX-206 ...
12/07/2007Drilling Extends Mineralization at Kianna Deposit: SHE-115-1...
14/06/2007 Plans to Initiate Final Feasibility Study at Raven and Hors...
08/02/2006(Beatty River)2006 winter exploration commences at Beatty River Uranium pr...
Communiqués de Presse de VanEck Vectors Global Alternative Energy ETF
18/08/2016Research Reports Initiated on Uranium Miners Stocks U3O8, UE...
11/07/2016Paul Bay Continuity Confirmed and Down-Dip Drilling Underway
24/06/2016High Grade Zone Extended at Christie Lake
13/06/2016Drill Turning at Christie Lake
08/06/2016UEX Corporation Reports Results of Annual General Shareholde...
25/05/2016Highest Grade Hole at Christie Lake Project – 9.3% U3O8 over...
17/05/2016UEX Closes $7.25 Million Combined Flow-Through and Hard Doll...
02/05/2016UEX Places “Flow-Through” Shares and Overallotment Option; A...
28/04/2016UEX Announces $4.0 Million “Flow-Through” Private Placement
13/04/2016UEX intersects 4.27% eU3O8 over 10.2 m at Christie Lake
22/01/2016UEX Closes $2.0 Million Private Placement
19/01/2016Final Option Agreement Signed - Drill Program to Commence Im...
19/01/2016UEX Corporation: Final Option Agreement Signed-Drill Program...
22/12/2015UEX Announces $2.0 Million Private Placement
26/10/2015UEX Signs LOI on Advanced Stage Athabasca Uranium Project
21/09/2015Uranium companies could take the cake
21/04/2015UEX Announces $2.5 Million Private Placement
10/04/2015New Radioactive Fault at Wolf Lake Returns Probe Peak of 12,...
27/02/2015Promising Hydrothermal Clay Alteration Expanded at Dwyer Lak...
05/06/2014UEX/AREVA Report Drilling Results from Laurie and Mirror Riv...
02/04/2014(Black Lake)Uracan/UEX report uranium mineralization on the Black Lake P...
28/11/2013(Shea Creek)Reports 31.5 Metres Grading 0.80% eU3O8, Including 4.05% eU3...
06/08/2013(Shea Creek)Reports 22.3 Metres Grading 0.85% eU3O8, including 5.93% eU3...
04/06/2013(Shea Creek)Announces Completion and Filing of Shea Creek Technical Repo...
21/03/2013(Beatty River)Announces Completion of Beatty River Earn-in
08/08/2012/AREVA Drilling Continues to Outline Thick Mineralization at...
08/06/2012Board Re-elected and Mark Eaton Re-Appointed Chairman
31/05/2012/AREVA Drilling Continues to Outline Thick Unconformity Mine...
07/05/2012Terminates Shareholder Rights Plan
01/05/2012(Hidden Bay)Reports Summer-Fall 2011 Drilling Results for the Raven and ...
17/02/2012Announces $8 Million Bought Deal
16/12/2011Comments by David Talbot on UEX Corporation in the Energy Re...
07/12/2011Adopts Shareholder Rights Plan
06/12/2011(Shea Creek)/AREVA Drilling Expands Mineralization Northward from the Ki...
24/06/2011Board Re-elected
28/04/2011appoints Nan Lee as Vice-President of Project Development
17/03/2010Significant Unconformity Intersections at Shea Creek's 58B A...
23/09/2009CEO Stephen Sorensen to Retire; Board Names Current Chairman...
10/06/2009Stepout Drilling Expands Mineralization at Raven and Horsesh...
26/11/2008Announces Minimum $16.5 Million Budget for 2009
09/04/2008 reports final results of 2007 Horseshoe and Raven drilling,...
26/03/2008Eaton Joins UEX Board
22/01/2008UEX Commences 2008 Winter Exploration Program at Black Lake ...
14/01/2008UEX Earns Full 49% Interest in AREVA's Western Athabasca Ura...
14/12/2007Interim Resource Estimate for the West Bear Deposit Adds 223...
11/07/2007Commences Summer/Fall 2007 Drilling Programs at the Raven an...
23/04/2007on Riou Lake and Northern Athabasca Uranium Projects 2007 Ge...
28/02/2007Commences 2007 Winter Exploration Program at Black Lake Uran...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (UEX.TO)FRANKFURT (UXO.F)
0,495+16.47%0,380-3.46%
TORONTO
CA$ 0,495
24/08 16:59 0,070
16,47%
Cours préc. Ouverture
0,425 0,400
Bas haut
0,440 0,500
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,495 -%
Volume var. 1 mois
9 418 620 -%
24hGold TrendPower© : 44
Produit
Développe
Recherche Uranium
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 07/12/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
202230,26%0,510,24
202146,15%0,600,25
2020108,00%0,280,07
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
6,72 AU$+0,45%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 +100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
8,42 US$+0,12%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,59 GBX-2,80%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,08 -0,95%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 +0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
13,57 +0,97%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,30 +0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 +0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
2,25 +0,00%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
38,47 US$-2,31%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,10 AU$-4,76%Trend Power :
Sun Res.(Oil)SUR.AX
Released ASX Announcement: Quarterly Activities Report
0,00 AU$+0,00%Trend Power :
Profitez de la hausse des actions aurifères
  • Inscrivez-vous à notre market briefing minier
    hebdomadaire
  • Recevez nos rapports sur les sociétés qui nous semblent
    présenter les meilleurs potentiels
  • Abonnement GRATUIT, aucune sollicitation
  • Offre limitée, inscrivez-vous maintenant !
Accédez directement au site.