Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
Cours Or & Argent

Trevali Mining Corp.

Publié le 21 janvier 2016

Trevali Reports Q4-2015 Santander Mine Production

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Copper | Dollar | Zinc |

Trevali Reports Q4-2015 Santander Mine Production

VANCOUVER, BRITISH COLUMBIA--(Marketwired - Jan 21, 2016) - Trevali Mining Corporation ("Trevali" or the "Company") (TV.TO)(TREVF)(TV.TO)(4TI.F) reports preliminary Santander Mine production results for its fourth quarter ("Q4") ending December 31, 2015 of approximately 13.1 million payable pounds of zinc, 6.3 million payable pounds of lead and 224,021 payable ounces of silver. Preliminary full year 2015 Santander mine zinc production was approximately 54.1 million payable pounds of zinc, exceeding annual guidance, in addition to 30.2 million payable pounds of lead and 1,055,965 payable ounces of silver, both hitting in the upper end of production guidance (see Table 1).

Q4-2015 recoveries at Santander averaged 90% for zinc, 88% for lead and 75% for silver. Mill throughput for the quarter was 204,999 tonnes, the highest throughput to date at Santander.

Table 1: Santander Mine Q4-2015 and 2015 annual preliminary production statistics

Q1-2015 Q2-2015 Q3-2015 Q4-2015 2015
Tonnes Mined 182,258 191,259 175,560 173,283 722,360
Tonnes Milled 185,365 190,498 197,289 204,999 778,151
Average Head Grades:
Zinc 4.03 % 4.27 % 4.45 % 3.80 % 4.14 %
Lead 2.13 % 2.47 % 2.11 % 1.68 % 2.09 %
Silver (ounces/ton) 1.65 1.85 1.79 1.38 1.66
Average Recoveries (%):
Zinc 90 % 90 % 90 % 90 % 90 %
Lead 90 % 88 % 89 % 88 % 89 %
Silver 80 % 78 % 77 % 75 % 77 %
Concentrate Produced DMT
(dry metric tonnes):
Zinc 13,430 14,708 15,954 14,141 58,232
Lead 5,925 7,081 6,610 5,347 24,963
Concentrate Grades:
Zinc 50 % 50 % 50 % 49 % 50 %
Lead 60 % 59 % 56 % 57 % 58 %
Ag (ounces/ton) 41.04 39.46 41.76 39.70 40.48
Payable Production:
Zinc (pounds) 12,536,783 13,684,987 14,848,026 13,078,864 54,148,660
Lead (pounds) 7,407,887 8,706,534 7,785,192 6,337,737 30,237,351
Silver (ounces) 254,805 291,177 285,962 224,021 1,055,965

2016 Santander Mine Production Guidance

The preliminary 2016 production guidance estimate for the Santander mine is:

  • 52-55 million pounds of payable zinc in concentrate grading approximately 50 percent Zn and at an average head grade of 4.2-4.4 percent Zn.
  • 22-25 million pounds of payable lead in concentrate grading approximately 56-58 percent Pb and at an average head grade of 1.7-2.0 percent Pb.
  • 800,000-1,000,000 ounces of payable silver at an average head grade of 1.5-1.8 oz per ton Ag.

Cash costs for 2016 are estimated at approximately US$40-US$43 per tonne milled (please see Cautionary Note on Forward Looking Statements at the end of this document).

Caribou Mine Commissioning Update

Trevali also provides a Q4-2015 and year-end mine and mill commissioning update for its Caribou Zinc Mine in the Bathurst Mining Camp of northern New Brunswick. A detailed description and discussion is provided below and progress highlights are as follows (Table 2):

Table 2: Caribou Mill - key commissioning & preliminary production statistics (figures rounded)

Q3-2015 Q4-2015
Tonnes Mined 114,386 160,511
Tonnes Milled 203,401 165,605
Average Mill Tonnes-per-day (TPD) 2,210 2,020
Average Head Grades %
Zinc 4.8 % 6.0 %
Lead 1.8 % 2.2 %
Silver - Oz (ounces)/ton 1.6 oz/t 2.0 oz/t
Average Recoveries %
Zinc 61.1 % 71.5 %
Lead 41.0 % 57.2 %
Silver (in Lead concentrate) 20.6 % 29.5 %
Concentrate Produced DMT (dry metric tonnes):
Zinc 12,464 14,616
Lead 4,240 5,230
Concentrate Grades %
Zinc 48.8 % 47.6 %
Silver - Oz (ounces)/ton 3.9 oz/t 4.2 oz/t
Lead 35.7 % 39.8 %
Silver - Oz (ounces)/ton 16.1 oz/t 17.7 oz/t

Summary

During December the Caribou mill exhibited improved availability, utilization, reagent optimization (consumption reduction by approximately 30% on several key inputs) and throughput on a daily basis versus prior months, achieving an average of approximately 2,200 tonnes-per-day ("tpd").

Caribou Zinc Circuit Modifications

In December, when running at higher throughput rates coupled with design zinc grades, it became apparent the Caribou zinc circuit was constrained in processing more than approximately 2,000 tpd without overloading both the pumping infrastructure and rougher circuit due to excessive amounts of zinc metal in the system that was essentially restricting the mill to 6.5 tonnes-per-hour ("tph") of metal or approximately 2,000 tpd throughput rate.

Consequently following input and recommendations from Trevali's consulting metallurgist Holland and Holland Engineering, who was onsite at Caribou from late-November and through December, and partner Glencore's corporate metallurgist, upgrade modifications were undertaken primarily on the zinc circuit from Dec 22nd to Jan 2nd.

Specifically, the zinc pump and sump capacity was increased and handling optimized, which has now resulted in the Caribou mill throughput increasing to 110 tph (2,640 tpd) in early January and up to 120-125 tph (2,880-3,000 tpd) presently without any adverse effects. Additional capacity will be further added during future scheduled maintenance periods.

Zinc flotation kinetics were also modified by moving to a two-stage conditioner system, in addition baffles and inter-cell partitions were also added to the zinc cleaner-rougher cells in order to both increase cell residence time and to prevent asymmetric performance between the two banks of cells.

Given current subdued commodity prices, the key focus during January remains on further mill throughput and recovery improvements, in addition to grind optimization, zinc and lead circuit pumping enhancements, and ongoing copper circuit metallurgical test work.

Caribou Mining

Underground operations at Caribou continue to ramp up with mine production increasing to approximately 2,147 tpd in December (adjusted for maintenance shutdown).

Qualified Person and Quality Control/Quality Assurance

EurGeol Dr. Mark D. Cruise, Trevali's President and CEO, Paul Keller, P.Eng, Trevali's Chief Operating Officer are qualified persons as defined by NI 43-101, have supervised the preparation of the scientific and technical information that forms the basis for this news release. Dr. Cruise is not independent of the Company as he is an officer, director and shareholder. Mr. Keller is not independent of the Company as he is an officer and shareholder.

ABOUT TREVALI MINING CORPORATION

Trevali is a zinc-focused, base metals mining company with one producing operation in Peru and another currently undergoing commissioning in Canada.

In Peru, the Company is actively producing zinc and lead-silver concentrates from its 2,000-tonne-per-day Santander mine.

In Canada, Trevali owns the Caribou mine and mill, Halfmile mine and Stratmat deposit all located in the Bathurst Mining Camp of northern New Brunswick. The Company is currently commissioning its 3,000-tonne-per-day Caribou mine.

The common shares of Trevali are listed on the TSX (symbol TV), the OTCQX (symbol TREVF), the Lima Stock Exchange (symbol TV), and the Frankfurt Exchange (symbol 4TI). For further details on Trevali, readers are referred to the Company's website (www.trevali.com) and to Canadian regulatory filings on SEDAR at www.sedar.com.

On Behalf of the Board of Directors of TREVALI MINING CORPORATION,

Mark D. Cruise, President

This news release contains "forward-looking statements" within the meaning of the United States private securities litigation reform act of 1995 and "forward-looking information" within the meaning of applicable Canadian securities legislation. Statements containing forward-looking information express, as at the date of this news release, the Company's plans, estimates, forecasts, projections, expectations, or beliefs as to future events or results and the Company does not intend, and does not assume any obligation to, update such statements containing the forward-looking information. Such forward-looking statements and information include, but are not limited to statements as to: the Company's plan to prepare a new PEA for its Halfmile and Stratmat properties, the accuracy of estimated mineral resources, anticipated results of future exploration, and forecast future metal prices, expectations that environmental, permitting, legal, title, taxation, socio-economic, political, marketing or other issues will not materially affect estimates of mineral resources. These statements reflect the Company's current views with respect to future events and are necessarily based upon a number of assumptions and estimates that, while considered reasonable by the Company, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies.

These statements reflect the Company's current views with respect to future events and are necessarily based upon a number of assumptions and estimates that, while considered reasonable by the company, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements contained in this news release and the company has made assumptions and estimates based on or related to many of these factors.
Such factors include, without limitation: fluctuations in spot and forward markets for silver, zinc, base metals and certain other commodities (such as natural gas, fuel oil and electricity); fluctuations in currency markets (such as the Canadian dollar and Peruvian sol versus the U.S. dollar); risks related to the technological and operational nature of the Company's business; changes in national and local government, legislation, taxation, controls or regulations and political or economic developments in Canada, the United States, Peru or other countries where the Company may carry on business in the future; risks and hazards associated with the business of mineral exploration, development and mining (including environmental hazards, industrial accidents, unusual or unexpected geological or structural formations, pressures, cave-ins and flooding); risks relating to the credit worthiness or financial condition of suppliers, refiners and other parties with whom the Company does business; inadequate insurance, or inability to obtain insurance, to cover these risks and hazards; employee relations; relationships with and claims by local communities and indigenous populations; availability and increasing costs associated with mining inputs and labour; the speculative nature of mineral exploration and development, including the risks of obtaining necessary licenses and permits and the presence of laws and regulations that may impose restrictions on mining,; diminishing quantities or grades of mineral resources as properties are mined; global financial conditions; business opportunities that may be presented to, or pursued by, the Company; the Company's ability to complete and successfully integrate acquisitions and to mitigate other business combination risks; challenges to, or difficulty in maintaining, the Company's title to properties and continued ownership thereof; the actual results of current exploration activities, conclusions of economic evaluations, and changes in project parameters to deal with unanticipated economic or other factors; increased competition in the mining industry for properties, equipment, qualified personnel, and their costs. Investors are cautioned against attributing undue certainty or reliance on forward-looking statements. Although the Company has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be as anticipated, estimated, described or intended. The Company does not intend, and does not assume any obligation, to update these forward-looking statements or information to reflect changes in assumptions or changes in circumstances or any other events affecting such statements or information, other than as required by applicable law.

Trevali's production plan at the Caribou Mine is based only on measured, indicated and inferred resources, and not mineral reserves, and does not have demonstrated economic viability. Trevali's production plan at the Santander Mine is based only on indicated and inferred mineral resources, and not mineral reserves, and does not have demonstrated economic viability. Inferred mineral resources are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is therefore no certainty that the conclusions of the production plans and Preliminary Economic Assessment (PEA) will be realized. Additionally, where Trevali discusses exploration/expansion potential, any potential quantity and grade is conceptual in nature and there has been insufficient exploration to define a mineral resource and it is uncertain if further exploration will result in the target being delineated as a mineral resource.

We advise US investors that while the terms "measured resources", "indicated resources" and "inferred resources" are recognized and required by Canadian regulations, the US Securities and Exchange Commission does not recognize these terms. US investors are cautioned not to assume that any part or all of the material in these categories will ever be converted into reserves.

This news release does not constitute an offer to sell or a solicitation of an offer to buy any of the securities in the United States. The securities described herein have not been and will not be registered under the United States Securities Act of 1933, as amended, or the securities laws of any state and may not be offered or sold within the United States, absent such registration or an applicable exemption from such registration requirements.

The TSX has not approved or disapproved of the contents of this news release.

Lire la suite de l'article sur finance.yahoo.com
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Trevali Mining Corp.

PRODUCTEUR
CODE : TV.TO
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Trevali Mining est une société de production minière de zinc et de plomb basée au Canada.

Trevali Mining est productrice de zinc, de plomb, de cuivre au Canada, en développement de projets d'argent, de cuivre, de plomb et de zinc au Perou.

Son principal projet en production est RUTTAN au Canada et son principal projet en développement est SANTANDER au Perou.

Trevali Mining est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 84,8 millions CA$ (67,8 millions US$, 68,5 millions €).

La valeur de son action a atteint son plus haut niveau récent le 21 janvier 2011 à 2,51 CA$, et son plus bas niveau récent le 29 mai 2020 à 0,06 CA$.

Trevali Mining possède 403 620 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Trevali Mining Corp.
2007 Annual Report
Financements de Trevali Mining Corp.
28/03/2013Mining Closes $5,000,000 Bought Deal Private Placement of Fl...
19/03/2013Mining Announces $5,000,000 Bought Deal Private Placement of...
22/03/2011Announces $10.0 Million Overnight Marketed Private Placement...
11/12/2009closes $7.7-million non-brokered private placement
Nominations de Trevali Mining Corp.
06/05/2013Mining Appoints Peter Meredith to Board of Directors
04/10/2012Appoints Mr. David Huberman to Board of Directors
20/09/2012Mining Appoints Dr. Valentin Paniagua Jara to Board of Direc...
19/09/2012Appoints Dr. Valentin Paniagua Jara to Board of Directors
14/02/2012Appoints Ted Bassett to Board of Directors
01/06/2011Trevali Strengthens Management Team
Rapports Financiers de Trevali Mining Corp.
11/05/2016reports Q1-2016 financial results
Projets de Trevali Mining Corp.
02/06/2016Trevali reports additional drill results from new Oyon Zone ...
07/04/2016Trevali discovers multiple stacked high-grade lead-silver-zi...
22/03/2016Trevali expands Magistral zones at Santander zinc mine - rep...
25/09/2015High-grade zinc-lead-silver mineralization expands Magistral...
16/04/2015Trevali intersects 50.9 metres of massive sulphide mineraliz...
02/03/2015Trevali reports additional high-grade zinc-lead-copper drill...
26/02/2014Mining intersects 26.75 metres of 7.42% Zinc, 1.37% Lead, 1....
20/02/2014(Santander)Mining Announces Commercial Production at Santander
10/12/2013(Santander)Mining Significantly Expands Rosa Lead-Silver-Zinc Zone at t...
29/10/2013(Santander)Mining Extends Size and Grades of Newly Discovered Rosa Zone...
01/10/2013(Santander)Mining commences concentrate trucking from its Santander Zin...
30/09/2013(Santander)Mining provides Santander Mine commissioning progress update...
10/09/2013(Santander)reports positive Santander Mine commissioning progress; Mill...
19/06/2013(Santander)Mining Provides Underground Development Update of Santander ...
10/06/2013(Santander)Mining Commences Crushing at Santander Mine in Peru
01/05/2013Mining Receives Operations Permit for the Caribou Concentrat...
10/04/2013(Santander)Provides Santander Processing Plant Update; Dry Commissionin...
04/04/2013Mining Receives Final Approval for $30-million Portion of RM...
06/11/2012(Santander)Mining enters into a US$20-million working capital facility ...
05/11/2012Mining closes acquisition of Maple Minerals to acquire moder...
12/09/2012(Santander)Santander Mine Construction Nears Completion
02/08/2012Mining provides Caribou Mill Update - advances focus to 'sta...
21/06/2012(Santander)Santander Mine Construction on Track
24/04/2012(Santander)Receives Key Environmental Impact Permit for Its Santander M...
01/02/2012(Santander)Mining Corporation News Release Wed. February 1/12 -- Tre...
01/02/2012(Santander)Provides Santander Mine Project Status Update
07/12/2011(Ruttan)Increases Land Position at Ruttan Copper and Zinc Deposit in...
07/09/2011(Santander)Extends Magistral North and South Deposits to Depth at Santa...
09/05/2011(Santander)Extends Magistral Central Deposit at Santander Silver-Lead-Z...
15/03/2011(Santander)Trevali identifies new mineralized body at Santander
15/03/2011(Santander)Identifies New Mineralized Body at Santander Project in Peru
04/03/2010hits high-grade mineralization at Magistral
08/02/2010expands high-grade mineralization at Magistral North deposit
26/08/2009(Santander)Positive Mine Decision for Santander Silver-Lead-Zinc Projec...
23/06/2009(Santander)receives tailings operation permit for Santander silver-lead...
15/05/2009(Santander)and Glencore sign MOU to develop the Santander silver-lead-z...
19/02/2009(Santander)New mineralized zone shows high-grade resource expansion pot...
05/02/2009(Santander)cuts further high-grade silver in Magistral Central Zone dri...
07/01/2009(Santander)produces marketable high-grade silver-lead-zinc concentrates...
10/12/2008(Santander)Receives Transmission Line Permit; Upgrades Santander - Ting...
03/12/2008(Santander)Additional silver-rich intersections expand Trevali's Magist...
20/11/2008(Santander)receives highly positive hard-rock metallurgical results fro...
18/11/2008(Santander)defines high-grade tailings at Llacsacocha on Santander Silv...
23/09/2008(Santander)confirms high-grade mineralization at Puajanca prospect on S...
09/09/2008(Santander)intersects new silver-rich sulphide body at Magistral Centra...
26/06/2008(Santander)intersects 165.2 metres of 3.24% zinc at Magistral South zon...
04/06/2008(Santander)Announces Two Phase Mill Refurbishment Plan at Santander Sil...
28/05/2008(Santander)Continues to Intersect Broad Zones of Silver - Base Metal Mi...
07/05/2008(Santander)Completes Santander Tailings Resource Definition Program - O...
01/05/2008(Santander) Intersects High Grade Silver at Santander Project, Peru
24/04/2008(Santander) Defines Significant Zinc Mineralization at Santander Tailin...
Communiqués de Presse de Trevali Mining Corp.
11/07/2016Trevali reports Q2-2016 Santander Mine production with recor...
07/07/2016Trevali declares commercial production at Caribou Zinc Mine ...
09/06/2016Trevali provides Caribou Zinc Mine commissioning update - Zi...
11/05/2016Trevali reports Q1-2016 financial results
14/04/2016Trevali Reports Q1-2016 Santander Mine Production And Record...
30/03/2016Trevali reports 2015 annual financial results
21/01/2016Trevali reports Q4-2015 Santander Mine production 2015 Santa...
21/01/2016Trevali Reports Q4-2015 Santander Mine Production
31/12/2015Trevali expands and extends debt facility -- providing addit...
08/10/2015Trevali reports record Santander Mine production for Q3-2015...
09/09/2015Trevali provides Caribou Zinc Mine commissioning update
01/09/2015Edited Transcript of TV.TO earnings conference call or prese...
14/08/2015Trevali Reports Second Quarter 2015 Financial Results
12/08/2015Trevali provides Caribou Zinc Mine commissioning update; Com...
12/08/2015Trevali Provides Caribou Zinc Mine Commissioning Update
08/07/2015Trevali reports Santander Mine Q2-2015 production
07/07/2015Trevali provides Caribou Zinc Mine commissioning update
23/04/2015Trevali sees positive initial results from Caribou Zinc Mine...
14/04/2015Trevali reports Santander Mine Q1-2015 production
14/04/2015(Santander)Reports Santander Mine Q1-2015 Production
31/03/2015Trevali Reports 2014 Annual Financial Results
30/03/2015Trevali commences mining at Caribou Zinc Mine in anticipatio...
30/03/2015IIROC Trade Resumption - TV
30/03/2015Commences Mining at Caribou Zinc Mine in Anticipation of Q2 ...
30/03/2015IIROC Trading Halt - TV
21/01/2015Trevali's Santander Mine production exceeds 2014 guidance
19/01/2015Trevali Further Expands High-Grade Zinc-Lead-Copper Minerali...
18/12/2014Trevali provides Caribou Zinc Mine re-start update
25/11/2014Trevali Intersects 21 Metres of Massive Sulphide Mineralizat...
14/11/2014Trevali Announces Third Quarter 2014 Financial Results
08/10/2014Trevali Reports Q3-2014 Santander Mine Production and Increa...
18/09/2014Trevali's Caribou Zinc-Lead-Silver Mine Restart Progressing ...
15/09/2014Trevali to Be Added to S&P/TSX Global Mining Index and S&P/T...
03/09/2014Trevali Discovers Significant New Multi-Lens Zone at Stratma...
21/08/2014Trevali Reports Multiple High-Grade Drill Intercepts Expands...
14/08/2014Trevali Announces Second Quarter 2014 Financial Results
04/02/2014(Santander)Mining Provides January Santander Commissioning Update
07/01/2014(Santander)Mining Provides December Santander Commissioning Update
10/12/2013Northern Miner: Trevali Mining poised to benefit from zinc's...
03/12/2013(Santander)Mining Provides November Santander Mill Commissioning Update...
25/11/2013Mining Provides Update on Halfmile-Stratmat Work Programs in...
04/11/2013(Santander)Mining's Santander Zinc-Lead-Silver Mine Processing Plant Op...
21/10/2013(Santander)Mining Drills High-Grade Silver-Lead-Zinc at Santander Mine ...
08/10/2013Mining's President and CEO Mark Cruise interviewed on BNN Co...
08/10/2013(Santander)Mining Discovers Multiple New Zones of High-Grade Mineraliza...
24/09/2013Zinc Deficit Coming Soon, Glencore Xstrata Predicts
26/08/2013Stockhouse Editorial: Trevali Mining (T.TV) emerges as a Can...
21/08/2013Investing News Network interview with Trevali Mining's Presi...
21/08/2013Investing News Network interview with Trevali Mining's Presi...
15/08/2013(Santander)Mining commences concentrate production at Santander Mine in...
21/05/2013(Santander)Mining Provides Santander Mine Production Update; Further St...
21/05/2013(Santander)Santander Mine Production Update; Trevali Further Strengthen...
30/04/2013Mining Closes $30-million Portion of RMB Funding Facility
30/04/2013Closes $30-Million Portion of RMB Funding Facility
04/04/2013Receives Final Approval for $30-million Portion of RMB Resou...
31/01/2013New Brunswick Government Signs Environmental Agreement for T...
17/01/2013Announces NI 43-101 Resource Estimate for Its Caribou Deposi...
05/11/2012Closes Acquisition of Maple Minerals to Acquire Modern 3,000...
26/09/2012Signs USD$60-million Senior Debt and Prepaid Precious Metals...
15/08/2012Mining arranges $10-million bridge credit facility
15/08/2012Arranges $10-Million Bridge Credit Facility
31/07/2012(Ruttan)Mining acquires 100% ownership of past producing Ruttan Copp...
31/07/2012(Ruttan)Acquires 100% Ownership of the Ruttan Copper Deposit, Manito...
25/07/2012Mining Closes $15.44 Million Bought Deal Private Placement F...
05/07/2012(Santander)Increases Inferred Resources by 188% to 13.84 Million Tonnes...
13/06/2012Receives Positive Metallurgical Results From Initial Halfmil...
06/06/2012Further Expands Mineralization at Stratmat Deposit in New Br...
14/05/2012to Acquire Modern Mill Complex in New Brunswick
01/05/2012Encounters Wider Than Expected Mineralization in Operations ...
24/04/2012Mining Corp. News Release
12/04/2012Trevali reports additional drill results from Stratmat Depos...
12/04/2012Reports Additional Drill Results From Stratmat Deposit in Ne...
14/03/2012Mining Corporation: First Nations Students Complete Undergro...
01/03/2012Mining Corporation News Release. Thurs March 1/12
01/03/2012Glencore International to Acquire 7.8% of Trevali Through an...
21/02/2012(Santander)Intersects Multiple Zones of Mineralization at the Santander...
14/02/2012Mining Corporation (TSX: TV) News Release Tue. Feb.14/12
17/01/2012Mining Corporation - News Release
17/01/2012and First Nations Launch Underground Core Mining Training Pr...
06/01/2012Mining Corporation --- NEWS RELEASE Friday Jan. 6/12
06/01/2012Commences Initial Production at Halfmile Mine in New Brunswi...
15/12/2011Mining Corp. News Release. Wed. Dec. 14/11
14/12/2011Receives Mining Lease for Halfmile Mine
07/12/2011Mining Corporation -- News Release.
13/10/2011Mining Corporation News Release
13/10/2011Provides Halfmile Mine Development Update
21/09/2011Announces $40.0 Million Offering of 5-Year Convertible Senio...
07/09/2011Mining Corp. News Release Wed. Sep.7/11
26/08/2011Announces $10.4 Million Private Placement Financing
10/08/2011Identifies Laterally and Vertically Extensive High-Grade Sil...
19/07/2011Mining Corporation. News Release Tue. July 19/11
19/07/2011finalizes Cooperation and Impact Benefits Agreement with Mi'...
14/07/2011Announces Closing of $15-Million Private Placement
07/07/2011Announces $15 Million Non-Brokered Private Placement
19/06/2011Mining Shares Listed on the Lima Stock Exchange
07/06/2011Intersects High Grade Mineralization at Halfmile Deposit in ...
18/05/2011Mining Corp. News Release. Wed. May 18/11
18/05/2011Signs Option to Acquire Huampar Silver-Gold Mine, Peru
28/04/2011Drills Thickest Mineralized Intercept to Date at Halfmile Le...
08/04/2011Friday Apr. 8/11
06/04/2011Closes $6.15 Million Brokered Portion of Private Placement F...
31/03/2011Shareholders Unanimously Approve Trevali's Planned Acquisiti...
22/01/2011Kria - Kria Resources and Trevali Resources
03/08/2010Receives Conditional Toronto Stock Exchange Listing Approval
02/06/2010Approval of Shareholders Rights Plan
31/05/2010Returns Deepest Intercepts to date from Magistral Central & ...
05/11/2009plans $7-million financing; Receives key Environmental Impac...
02/03/2009grants US$20-million debt financing rights for Tingo run-of-...
23/07/2008continues to intersect broad mineralized intervals at Magist...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (TV.TO)OTC BB (TREVF.PK)
0,210+0.00%
TORONTO
CA$ 0,210
06/09 10:30 -
0%
Cours préc. Ouverture
0,210 0,210
Bas haut
0,210 0,210
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,210 -%
Volume var. 1 mois
0 -%
24hGold TrendPower© : 19
Produit Copper - Zinc
Développe Copper - Lead - Silver - Zinc
Recherche
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 28/01/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2022-87,27%2,040,18
2021746,15%1,790,16
2020-15,22%0,260,06
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
6,72 AU$+0,45%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 +100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
8,41 US$+4,08%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,61 GBX+3,40%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,10 +0,96%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 +0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
13,44 +3,46%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,30 +7,14%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 +0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
2,25 +3,69%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
39,38 US$+0,69%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,10 AU$-4,76%Trend Power :
Sun Res.(Oil)SUR.AX
Released ASX Announcement: Quarterly Activities Report
0,00 AU$+0,00%Trend Power :
Profitez de la hausse des actions aurifères
  • Inscrivez-vous à notre market briefing minier
    hebdomadaire
  • Recevez nos rapports sur les sociétés qui nous semblent
    présenter les meilleurs potentiels
  • Abonnement GRATUIT, aucune sollicitation
  • Offre limitée, inscrivez-vous maintenant !
Accédez directement au site.