Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
Cours Or & Argent
Uracan/UEX report uranium mineralization on the Black Lake Project; ground geophysical survey underway
Published : April 02, 2014
( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Report | Uranium |

Uracan/UEX report uranium mineralization on the Black Lake Project; ground geophysical survey underway

Trading Symbols: TSX-V:URC and TSX:UEX

VANCOUVER, April 2, 2014 /CNW/ - Uracan Resources Ltd. (TSX.V:URC) ("Uracan") and UEX Corporation (TSX:UEX) ("UEX") are pleased to announce initial drilling results from the first six diamond drill holes completed on the Black Lake Project ("the Property") located along the northern margin of the prolific Athabasca Basin in northern Saskatchewan. 

The drilling program encountered uranium intersections of 0.131% U3O8 over 0.5 metres and 0.124% U3O8 over 1.0 metres in drill hole BL-148 that is hosted within and adjacent to the Eastern Fault Zone from which previous drilling intercepts on the property have been obtained. These mineralized intervals encountered in drill hole BL-148 occur at and up to 19 metres below the unconformity between the overlying Proterozoic Athabasca sandstones and underlying Archean basement rocks. The basement-hosted mineralization intersected below the footwall unconformity is significant as this style of mineralization has not been encountered previously in this area of the Property and represents a new prospective target.

The Black Lake Project covers a total of 30,381 hectares within the Athabasca Basin.  The exploration drilling program totalling 2,748 metres tested a number of geophysical and geochemical targets identified through the interpretation of data generated by previous work programs and followed up on uranium mineralization intersected in previous drill campaigns. 

Uracan is currently in the process of earning a 60% participating interest in the Property by incurring a total of $10.0 million in exploration expenditures over a 10 year period (see press release of February 13, 2013).   UEX is the operator of the Property during the earn-in period.

BL-148

Hole BL-148 was drilled to target the post-sandstone reverse Eastern Fault zone where a wedge of basement rocks has been overthrust onto parts of the Athabasca sandstone.  Drilling in this hole targeted mineralization intersected in previous hole BL-082 (0.50% U3O8 over 3.3 metres including 1.60% U3O8 over 0.7 metres) approximately 50 metres along strike to the southwest, as well as the potential for a northwest oriented structure cutting across the main eastern conductor in this area.  

BL-148 intersected the hanging wall unconformity of the reverse fault wedge at a depth of 265.8 metres and the footwall unconformity at a depth of 298.2 metres.  Strong hematization is present in both the hanging wall and footwall basement rocks which overprints most of the local textures.  A strong fault zone was also intersected within the sandstone just above the wedge.

Geochemical results from three zones of mineralization in BL-148 are as follows:

  • 0.131% U3O8 over 0.5 metres from 275.0 to 275.5 m (9.1 m below hanging wall unconformity)
  • 0.043% U3O8 over 0.5 m from 299.5 to 300.0 m (1.3 m below footwall unconformity)
  • 0.124% U3O8 over 1.0 m from 317.0 to 318.0 m (18.7 m below footwall unconformity)

Most significantly, the basement-hosted mineralization intersected below the footwall unconformity has not been encountered previously in this area of the Property and represents a new prospective target for basement mineralization associated with the fault. In the Athabasca Basin, the presence of a mineralized basement "wedge" is considered to be an important geological feature for potential uranium deposition having formed a structural trap for mineralizing hydrothermal fluids.  Graphitic breccia within the fault is also an important element in uranium deposition, and bleaching and alteration in the sandstone and basement rocks commonly seen as a halo surrounding uranium mineralization.  

BL-143 and BL-147

Holes BL-143 and BL-147 were drilled on section to target a coincident magnetic low and gravity low along the edge of an airborne EM high approximately 850 metres northeast along the projected trend of the Eastern Fault Zone intersected in hole BL-148.  Fault zones were intersected in the sandstone above the unconformity in both holes which consist of strongly bleached and desilicified sandstone as well as strong local clay alteration and dravite veining.  The unconformity was encountered at 268.8 metres in BL-143 and 273.2 metres in BL-147. The projection of this fault zone at the unconformity is a prospective target for future drilling.

BL-144

Hole BL-144 targeted a coincident resistivity, magnetic and gravity low within a pelitic package.  The hole intersected a variably altered and hematized sequence of Athabasca sandstone to the unconformity at 291.3 metres.  A zone of quartz dissolution was intersected in the sandstone consisting of broken angular and local sandy friable core, which may represent a potential fault structure.  Broad intervals of graphitic pelite were encountered in the basement rocks below the unconformity with up to 40% graphite noted in several intervals.  

BL-145

Hole BL-145 targeted a coincident resistivity, magnetic and gravity low.  The hole intersected variably altered and bleached sandstone to the unconformity at 326.8 metres.  Several zones of quartz dissolution were intersected within the sandstone with the widest and most intense present as a 30.0 metre zone characterized by sandy intervals and local sections of broken friable core in the upper portion of the hole.

BL-146

BL-146 intersected relatively unaltered sandstone to the unconformity at 408.6 metres.  Local broken friable zones were noted throughout the sandstone.  The basement rocks are comprised of fine-grained, weakly foliated to massive graphitic pelitic gneiss, pelitic gneiss and granitic gneiss.  Graphite content ranged from 1% to 20% with local areas of higher graphite content.

Ground Geophysical Program

Currently a geophysical contractor is mobilizing to the Property to commence a ground DC resistivity program over the central portion of the Property.  Once the full results from the drilling and ground geophysical programs have been received, Uracan and UEX will undertake additional drilling and field work on the Property to follow up results from the winter programs as well as test additional targets not completed during the winter drilling program.

For maps, sections and further details on the Property please refer to Uracan's website: www.uracan.ca or UEX's website http://www.uex-corporation.com .

Qualified Persons and Geochemical Analyses

Technical information in this press release has been reviewed and approved by Marc Simpson, P.Geo., President and CEO of Uracan, and R. Sierd Eriks, P.Geo., UEX's Vice-President of Exploration, who are both Qualified Persons as defined by National Instrument 43-101 ("N.I. 43-101") standards.

Geochemical analyses are carried out at the SRC Geoanalytical Laboratories in Saskatoon, Saskatchewan.  The primary geochemical analytical methods used for uranium analysis are ICP-MS (Inductively Coupled Plasma Mass Spectroscopy) for samples with grades lower than 1,000 ppm U, and U3O8 uranium assay by ICP‑OES (Inductively Coupled Plasma Optical Emission Spectroscopy) for samples determined by ICP-MS to contain uranium concentrations higher than 1,000 ppm U.

About Uracan

Uracan Resources Ltd. (TSX.V:URC, OTC:URCFF) is a Canadian-based exploration company focused on exploring for uranium deposits in Saskatchewan and Quebec, Canada.  Since 2006, Uracan has discovered a N.I. 43-101 Indicated Mineral Resource estimate of 7 million lbs U3O8 (21.5 million tonnes at a grade of 140 ppm U3O8 using a 100 ppm cut-off grade) and a N.I. 43-101 Inferred Mineral Resource estimate of 37 million lbs U3O8 (140.6 million tonnes at a grade of 120 ppm U3O8 using a 100 ppm cut-off grade) on its 100%-owned exploration properties in Quebec.  Uracan continues to review additional opportunities worldwide to capitalize on management's exploration and financing capabilities.

In early 2013, Uracan signed an agreement with UEX, whereby Uracan acquired the option to earn from UEX a 60% participating interest in the Property.  UEX currently holds an 89.99% interest in the Black Lake Project with AREVA Resources Canada Inc. ("AREVA") holding the remaining 10.01% interest.

About UEX

UEX (TSX:UEX, OTC:UEXCF.PK, UXO.F) is a Canadian uranium exploration and development company actively involved in fifteen uranium projects, including five that are 100% owned and operated by UEX, one joint venture with AREVA that is operated by UEX, eight projects joint-ventured with and operated by AREVA and one joint ventured with AREVA and JCU (Canada) Exploration Company, Limited, which is operated by AREVA.  The fifteen projects, totaling 261,040 hectares (645,044 acres), are located in the eastern, western and northern perimeters of the Athabasca Basin, the world's richest uranium district, which in 2013 accounted for approximately 15% of global primary uranium production.  UEX is currently advancing several uranium deposits in the Athabasca Basin which include the Kianna, Anne, Colette and 58B deposits at its currently 49.1%-owned Shea Creek Project, and the Horseshoe, Raven and West Bear deposits located at its 100%-owned Hidden Bay Project.

ON BEHALF OF URACAN RESOURCES LTD.



ON BEHALF OF UEX CORPORATION





"Marc Simpson" 



"Roger Lemaitre"





President & CEO  



President & CEO

This press release contains "forward-looking information" and "forward-looking statements" within the meaning of applicable securities laws. The forward-looking information and statements address future activities, events, plans, developments and projections. All statements, other than statements of historical fact, constitute forward-looking statements or forward-looking information. Forward-looking information and statements in this press release include statements regarding plans and timing for exploration activities, the merits of UEX and Uracan's mineral properties and other expectations, intentions and plans of UEX and Uracan.  Such forward-looking information and statements are frequently identified by words such as "may," "will," "should," "anticipate," "prospective," "plan," "expect," "believe," "estimate," "intend" and similar terminology, and reflect assumptions, estimates, opinions and analysis made by management of Uracan and UEX in light of their experience, current conditions, expectations of future developments and other factors which they believe to be reasonable and relevant. Forward-looking information and statements involve known and unknown risks and uncertainties that may cause actual results, performance and achievements to differ materially from those expressed or implied by the forward-looking information and statements and accordingly, undue reliance should not be placed thereon.

Risks and uncertainties that may cause actual results to vary include but are not limited to uncertainties relating to interpretation of drill results and geology; continuity and grade of deposit;, additional drilling results; the availability of financing; public acceptance of uranium as an energy source, fluctuations in commodity prices; changes to and compliance with applicable laws and regulations, including environmental laws and obtaining requisite permits; political, economic and other risks; as well as other risks and uncertainties which are more fully described in UEX's Annual Information Form and Uracan's annual and quarterly Management's Discussion and Analysis and in other filings made by each company with Canadian securities regulatory authorities and available at www.sedar.com. Many of these factors are beyond the control of UEX and Uracan.  All forward-looking information and statements contained in this press release are qualified by this cautionary statement and there can be no assurance that actual results or developments anticipated by UEX and Uracan will be realized.  For the reasons set forth above, investors should not place undue reliance on such forward-looking information and statements.  UEX and Uracan disclaim any obligation to update or revise any forward-looking information or statements except as may be required.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press release. 

SOURCE Uracan Resources Ltd.

For further information: Marc Simpson, President & CEO, Uracan Resources Ltd., 604-506-6996; Uracan Corporate Development, 604-970-6980, www.uracan.ca; Roger Lemaitre, President & CEO, UEX Corporation, 306-713-1401; UEX Corporate Development, 604-669-2349, www.uex-corporation.com
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

VanEck Vectors Global Alternative Energy ETF

EXPLORATEUR
CODE : UEX.TO
ISIN : CA9026661061
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

UEX est une société d’exploration minière d'or et de cuivre basée au Canada.

UEX détient divers projets d'exploration au Canada.

Ses principaux projets en exploration sont BLACK LAKE, NORTHERN ATHABASCA PROJECTS, WESTERN ATHABASCA PROJECTS, DOUGLAS, BEATTY RIVER, RIOU LAKE, HIDDEN BAY, SHEA CREEK, FOND DU LAC, UCHRICH, JAMES CREEK PROJECTS et LAURIE au Canada.

UEX est cotée au Canada et en Allemagne. Sa capitalisation boursière aujourd'hui est 23,5 millions (18,8 millions US$, 18,8 millions €).

La valeur de son action a atteint son plus bas niveau récent le 15 août 2003 à 0,05 , et son plus haut niveau récent le 09 novembre 2007 à 9,30 .

UEX possède 47 442 200 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de VanEck Vectors Global Alternative Energy ETF
18/05/2016Closes $7.25 Million Combined Flow-Through and Hard Dollar P...
05/06/2013Announces Closing of Private Placement
25/05/2013Announces $3.175 Million Private Placement
23/02/2012Announces $3 Million Private Placement
Nominations de VanEck Vectors Global Alternative Energy ETF
19/12/2013Announces the Appointment of Roger Lemaitre as President and...
29/04/2011appoints Ed Boney as Chief Financial Officer
27/05/2010Appoints Walter Segsworth and David Rhys to its Management A...
Rapports Financiers de VanEck Vectors Global Alternative Energy ETF
06/11/2013Third Quarter 2013 Financial Results and MD&A
Projets de VanEck Vectors Global Alternative Energy ETF
07/01/20142014 Joint Venture Exploration Programs Commence
04/06/2013(Shea Creek)Announces Additional $2.0 Million Drilling Budget for Shea C...
10/04/2013(Shea Creek)Secures Right to Fund $18 Million in Additional Drilling at ...
20/03/2013(Shea Creek)/AREVA Announce $3.1 Million Budget for Shea Creek Spring/Su...
13/02/2013(Black Lake)Regarding Uracan's Option for Black Lake Project in the Atha...
26/04/2012(Shea Creek)/AREVA 2012 Shea Creek Drilling Program Underway
16/02/2012(Hidden Bay)Commences Winter 2012 Hidden Bay Drilling Program
30/11/2011(Shea Creek)Announces Shea Creek Drilling Budget of $6 Million for 2012
09/08/2011(Hidden Bay)Commences 18,000 Metre Summer Drilling Program at Hidden Bay
24/02/2011(Western Athabasca Projects)/AREVA 2011 Western Athabasca Basin Drilling Programs Underw...
18/02/2010(Hidden Bay)Receives West Bear Preliminary Feasibility Study Reporting P...
27/01/2010(Shea Creek)2010 Western Athabasca Basin Drilling Programs Underway with...
06/01/2010(Hidden Bay)Reports Results of Summer 2009 Exploration on the Hidden Bay...
23/07/2009(Hidden Bay)Reports Significantly Expanded Resource Estimates for the Ho...
25/02/2009(Shea Creek)2009 Drill Program Underway at Shea Creek with Three Drills
12/01/2009(Shea Creek)/AREVA Drilling in the Prospective Corridor at Shea Creek Co...
05/01/2009Reports N.I. 43-101 Compliant Mineral Resource Estimate for ...
29/09/2008(Hidden Bay)reports N.I. 43-101 compliant mineral resource for Horseshoe...
18/06/2008/AREVA Drilling Outlines New Zone of High-grade Mineralizati...
17/01/2008(Hidden Bay) Launches Largest Winter Drilling Program at Hidden Bay with...
15/01/2008(Shea Creek)UEX/AREVA Launch Largest Drill Program to Date at Shea Creek...
05/12/2007(Shea Creek)/AREVA Plan $20.3 Million Program at Shea Creek for 2008 Whi...
04/12/2007(Shea Creek)/AREVA Report Additional High-Grade Basement-Hosted Minerali...
14/11/2007/AREVA Report High-Grade Basement-Hosted Mineralization in t...
18/10/2007Report Second-Best Hole Ever at the Anne Deposit Intersectin...
04/09/2007(Shea Creek)/AREVA to Commence Shea Creek Drilling Program with Three Dr...
21/08/2007(Black Lake)Extends Uranium Mineralization at Black Lake Hole BL-140 Int...
23/07/2007Reports Best Hole Ever from West Bear Deposit: Hole UEX-206 ...
12/07/2007Drilling Extends Mineralization at Kianna Deposit: SHE-115-1...
14/06/2007 Plans to Initiate Final Feasibility Study at Raven and Hors...
08/02/2006(Beatty River)2006 winter exploration commences at Beatty River Uranium pr...
Communiqués de Presse de VanEck Vectors Global Alternative Energy ETF
18/08/2016Research Reports Initiated on Uranium Miners Stocks U3O8, UE...
11/07/2016Paul Bay Continuity Confirmed and Down-Dip Drilling Underway
24/06/2016High Grade Zone Extended at Christie Lake
13/06/2016Drill Turning at Christie Lake
08/06/2016UEX Corporation Reports Results of Annual General Shareholde...
25/05/2016Highest Grade Hole at Christie Lake Project – 9.3% U3O8 over...
17/05/2016UEX Closes $7.25 Million Combined Flow-Through and Hard Doll...
02/05/2016UEX Places “Flow-Through” Shares and Overallotment Option; A...
28/04/2016UEX Announces $4.0 Million “Flow-Through” Private Placement
13/04/2016UEX intersects 4.27% eU3O8 over 10.2 m at Christie Lake
22/01/2016UEX Closes $2.0 Million Private Placement
19/01/2016Final Option Agreement Signed - Drill Program to Commence Im...
19/01/2016UEX Corporation: Final Option Agreement Signed-Drill Program...
22/12/2015UEX Announces $2.0 Million Private Placement
26/10/2015UEX Signs LOI on Advanced Stage Athabasca Uranium Project
21/09/2015Uranium companies could take the cake
21/04/2015UEX Announces $2.5 Million Private Placement
10/04/2015New Radioactive Fault at Wolf Lake Returns Probe Peak of 12,...
27/02/2015Promising Hydrothermal Clay Alteration Expanded at Dwyer Lak...
05/06/2014UEX/AREVA Report Drilling Results from Laurie and Mirror Riv...
02/04/2014(Black Lake)Uracan/UEX report uranium mineralization on the Black Lake P...
28/11/2013(Shea Creek)Reports 31.5 Metres Grading 0.80% eU3O8, Including 4.05% eU3...
06/08/2013(Shea Creek)Reports 22.3 Metres Grading 0.85% eU3O8, including 5.93% eU3...
04/06/2013(Shea Creek)Announces Completion and Filing of Shea Creek Technical Repo...
21/03/2013(Beatty River)Announces Completion of Beatty River Earn-in
08/08/2012/AREVA Drilling Continues to Outline Thick Mineralization at...
08/06/2012Board Re-elected and Mark Eaton Re-Appointed Chairman
31/05/2012/AREVA Drilling Continues to Outline Thick Unconformity Mine...
07/05/2012Terminates Shareholder Rights Plan
01/05/2012(Hidden Bay)Reports Summer-Fall 2011 Drilling Results for the Raven and ...
17/02/2012Announces $8 Million Bought Deal
16/12/2011Comments by David Talbot on UEX Corporation in the Energy Re...
07/12/2011Adopts Shareholder Rights Plan
06/12/2011(Shea Creek)/AREVA Drilling Expands Mineralization Northward from the Ki...
24/06/2011Board Re-elected
28/04/2011appoints Nan Lee as Vice-President of Project Development
17/03/2010Significant Unconformity Intersections at Shea Creek's 58B A...
23/09/2009CEO Stephen Sorensen to Retire; Board Names Current Chairman...
10/06/2009Stepout Drilling Expands Mineralization at Raven and Horsesh...
26/11/2008Announces Minimum $16.5 Million Budget for 2009
09/04/2008 reports final results of 2007 Horseshoe and Raven drilling,...
26/03/2008Eaton Joins UEX Board
22/01/2008UEX Commences 2008 Winter Exploration Program at Black Lake ...
14/01/2008UEX Earns Full 49% Interest in AREVA's Western Athabasca Ura...
14/12/2007Interim Resource Estimate for the West Bear Deposit Adds 223...
11/07/2007Commences Summer/Fall 2007 Drilling Programs at the Raven an...
23/04/2007on Riou Lake and Northern Athabasca Uranium Projects 2007 Ge...
28/02/2007Commences 2007 Winter Exploration Program at Black Lake Uran...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (UEX.TO)FRANKFURT (UXO.F)
0,495+16.47%0,380-3.46%
TORONTO
CA$ 0,495
24/08 16:59 0,070
16,47%
Cours préc. Ouverture
0,425 0,400
Bas haut
0,440 0,500
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,495 -%
Volume var. 1 mois
9 418 620 -%
24hGold TrendPower© : 44
Produit
Développe
Recherche Uranium
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 07/12/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
202230,26%0,510,24
202146,15%0,600,25
2020108,00%0,280,07
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
6,72 AU$+0,45%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 +100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
8,42 US$+0,12%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,59 GBX-2,80%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,08 -0,95%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 +0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
13,57 +0,97%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,30 +0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 +0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
2,25 +0,00%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
38,47 US$-2,31%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,10 AU$-4,76%Trend Power :
Sun Res.(Oil)SUR.AX
Released ASX Announcement: Quarterly Activities Report
0,00 AU$+0,00%Trend Power :
Profitez de la hausse des actions aurifères
  • Inscrivez-vous à notre market briefing minier
    hebdomadaire
  • Recevez nos rapports sur les sociétés qui nous semblent
    présenter les meilleurs potentiels
  • Abonnement GRATUIT, aucune sollicitation
  • Offre limitée, inscrivez-vous maintenant !
Accédez directement au site.