Microsoft Word - 20150121_ASX_Announcement_Western_Gawler_Craton_Project_Update
Exploration Office Unit 2, 81 Harrison Road Dudley Park
SA 5008
ABN: 96 110 336 733
Tel: +61 8 8245 4900
Fax: +61 8 8245 4999
www.monaxmining.com.au
For Immediate Release
Wednesday 21 January, 2015
ASX RELEASE
Western Gawler Craton Project Update
HIGHLIGHTS
High-resolution aeromagnetic survey completed
New high quality data showing significant increase in resolution from current magnetic data
New data highlighting areas of interest for magmatic Ni-Cu style mineralisation
Major drilling program planned for mid-2015
Monax Mining Ltd (ASX:MOX) is pleased to announce that a detailed aeromagnetic survey has been completed on its Western Gawler Craton ("WGC") Project (see Figure 1), wholly funded by Western Areas Limited ("Western Areas") (ASX:WSA) under the recently announced Farm-In Agreement (see ASX Release 9 October 2014).
The survey comprised 100m spaced flight lines over the entire project area and was completed in approximately six weeks. The new data provides a high-quality dataset suitable for outlining areas of favourable lithology and structural setting to host massive polymetallic mineralisation.
Figure 2 shows a reduced to pole (RTP1) image with the previously available data shown in the background. Figure 3 provides a comparison between the older data and the newly acquired magnetic data showing the significant increase in detail for the newly acquired data.
Interpretation of the data has commenced and Western Areas are planning a major drilling program to commence in the coming months once the required statutory access approvals are received.
The western Gawler Craton is interpreted to have a geological history analogous to the Thompson Nickel Belt in Canada and the Albany-Fraser Belt in Western Australia. The western Gawler Craton is considered a highly prospective and under-explored part of South Australia and Monax has acquired a strategic landholding within this potential new mineral province.
The Nova-Bollinger Deposit in the Albany-Fraser Belt in Western Australia is located within a prominent magnetic and gravity ridge. Two prominent magnetic and gravity ridges are located within Monax's WGC Project area, representing prime targets for potential magmatic nickel- copper mineralisation similar to that at Nova-Bollinger.
Page 1
The Tropicana gold deposit is located along the margin of the Albany Fraser Belt and exploration will also be focussed on testing the potential for a similar style of mineralisation within the WGC Project area.
"Monax is excited by the new aeromagnetic data and is looking forward to reviewing and interpreting the data with our partner Western Areas," Monax Mining Managing Director, Mr Gary Ferris, said today.
"The new data is a significant step forward for the project because the prospective basement rocks are obscured by a thin veneer of recent sediments and this data will allow a systematic approach to interpreting the data and planning the upcoming drilling program " he said.
"We are excited to have such a proactive partner in Western Areas who have completed this major survey within three months of signing the Farm-In agreement" he said.
Gary Ferris Managing Director, Monax Mining
Ph: (08) 8245 4900
Email: [email protected]
The information in this report that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Mr G M Ferris, who is a Member of the Australasian Institute of Mining and Metallurgy. Mr Ferris is employed full time by the Company as Managing Director and, has a minimum of five years relevant experience in the style of mineralisation and type of deposit under consideration and qualifies as a Competent Person as defined in the 2012 edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves" Mr Ferris consents to the inclusion of the information in this report in the form and context in which it appears.
1 Reduced to pole (RTP) - reduction-to-pole (RTP) transformation is commonly applied to aeromagnetic data to minimize polarity effects.
Page 2
W' ELA 1997/00190
132° 136"
NORTHE=RN TfRRITORV
.. . ELA 2014/0043
ELA 1997100155 - ELA 1997/00245
Musgrave ELA n D
c==!
MoNAX
MI N I NG L I MITB D
Designated Project
ELA 2013100170
Musgrave
28'
SOl TH A JSTAAL lA
ELA 2014/177 ....
32
GREAT AUSTAALIAN BIGHT
34• Main road
-- Railway
Town
d L.ake
lron Oxide Copper Gold deposit
Designated Projects
Monax Exploration Ucenoe
Monax Exploration Ucenoe Application
Alliance Exploration Ucence Application
Kangaroo lsland
36"
[:=J
FMG Exploration Ucence
Farm-ln Agreement- Western Areas Ltd
o 100 km
MOX 8 Decembe' 20 4
Figure 1. Location of Monax's projects including Western Gawler Craton
Project.
Page3
kilometers
Scale:1:362,100
Figure 2. Newly acquired detailed aeromagnetic data over Western Gawler Craton Project (lmage shows Reduced to Pole (RTP) image). Background previously available magnetic data.
Page 4
o ol" ""!iii!o--
kilometers
Scale:1:362.100
Figure 3. Comparison of older aeromagnetic data and newly collected aeromagnetic data (a= older data; b = new data)
Page 5
JORC Code, 2012 Edition - Table 1 report template
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling techniques
|
|
Nature and quality of sampling (eg cut channels, random chips, or specific specialised industry standard measurement tools appropriate
to the minerals under investigation, such as down hole gamma sondes, or handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample representivity and the appropriate calibration of any measurement tools or systems used.
Aspects of the determination of mineralisation that are Material to the
Public Report.
In cases where 'industry standard' work has been done this would be relatively simple (eg 'reverse circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised to produce a 30 g charge
for fire assay'). In other cases more explanation may be required,
such as where there is coarse gold that has inherent sampling problems. Unusual commodities or mineralisation types (eg submarine nodules) may warrant disclosure of detailed information.
|
|
Not Applicable for magnetic survey.
|
Drilling
|
|
Drill type (eg core, reverse circulation, open-hole hammer, rotary air
|
|
Not Applicable for magnetic survey.
|
techniques
|
blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple
|
or standard tube, depth of diamond tails, face-sampling bit or other
|
type, whether core is oriented and if so, by what method, etc).
|
Drill sample
|
|
Method of recording and assessing core and chip sample recoveries
|
|
Not Applicable for magnetic survey.
|
recovery
|
and results assessed.
|
|
Measures taken to maximise sample recovery and ensure
|
representative nature of the samples.
|
|
Whether a relationship exists between sample recovery and grade
|
and whether sample bias may have occurred due to preferential
|
loss/gain of fine/coarse material.
|
Logging
|
|
Whether core and chip samples have been geologically and
|
|
Not Applicable for magnetic survey.
|
geotechnically logged to a level of detail to support appropriate
|
Mineral Resource estimation, mining studies and metallurgical
|
studies.
|
|
Whether logging is qualitative or quantitative in nature. Core (or
|
costean, channel, etc) photography.
|
|
The total length and percentage of the relevant intersections logged.
|
Sub-sampling
|
|
If core, whether cut or sawn and whether quarter, half or all core
|
|
Not Applicable for magnetic survey.
|
techniques and
|
taken.
|
sample
|
|
If non-core, whether riffled, tube sampled, rotary split, etc and
|
Page 6
Criteria JORC Code explanation Commentary
preparation
|
|
whether sampled wet or dry.
For all sample types, the nature, quality and appropriateness of the sample preparation technique.
Quality control procedures adopted for all sub-sampling stages to maximise representivity of samples.
Measures taken to ensure that the sampling is representative of the in situ material collected, including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the material being sampled.
|
Quality of
|
|
The nature, quality and appropriateness of the assaying and
|
|
Not Applicable for magnetic survey.
|
assay data and
|
laboratory procedures used and whether the technique is considered
|
laboratory
|
partial or total.
|
tests
|
|
For geophysical tools, spectrometers, handheld XRF instruments, etc,
|
the parameters used in determining the analysis including instrument
|
make and model, reading times, calibrations factors applied and their
|
derivation, etc.
|
|
Nature of quality control procedures adopted (eg standards, blanks,
|
duplicates, external laboratory checks) and whether acceptable levels
|
of accuracy (ie lack of bias) and precision have been established.
|
Verification of
|
|
The verification of significant intersections by either independent or
|
|
Not Applicable for magnetic survey.
|
sampling and
|
alternative company personnel.
|
assaying
|
|
The use of twinned holes.
|
|
Documentation of primary data, data entry procedures, data
|
verification, data storage (physical and electronic) protocols.
|
|
Discuss any adjustment to assay data.
|
Location of
|
|
Accuracy and quality of surveys used to locate drill holes (collar and
|
|
The aeromagnetic survey was undertaken by MAGSPEC Airborne
|
data points
|
down-hole surveys), trenches, mine workings and other locations
used in Mineral Resource estimation.
|
Surveys Pty Ltd using a Cessna fixed wing aircraft. Flight lines were
100m apart with 40m survey height. Lines were oriented 120o - 320o.
|
|
Specification of the grid system used.
|
|
Data was collected using WGS84 UTM grid system.
|
|
Quality and adequacy of topographic control.
|
|
Topographic control was achieved using a integrated Novatel
|
OEM616 GPS Receiver together with a radar altimeter which
|
provides data on the aircraft height above the terrain.
|
Data spacing
and distribution
Orientation of data in relation to geological
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to establish the degree of geological and grade continuity appropriate for the Mineral Resource and Ore Reserve estimation procedure(s) and
classifications applied.
Whether sample compositing has been applied.
Whether the orientation of sampling achieves unbiased sampling of possible structures and the extent to which this is known, considering the deposit type.
Not applicable - data not used for resource estimation.
Not Applicable for magnetic survey.
Lines were oriented 120o - 320o which is considered optimal for the area.
Page 7
Criteria JORC Code explanation Commentary
structure If the relationship between the drilling orientation and the orientation of key mineralised structures is considered to have introduced a sampling bias, this should be assessed and reported if material.
Sample security
Audits or reviews
The measures taken to ensure sample security. Not Applicable for magnetic survey.
The results of any audits or reviews of sampling techniques and data. Not Applicable for magnetic survey.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation Commentary
Mineral tenement and land tenure status
Type, reference name/number, location and ownership including agreements or material issues with third parties such as joint ventures, partnerships, overriding royalties, native title interests, historical sites, wilderness or national park and environmental settings.
The security of the tenure held at the time of reporting along with any known impediments to obtaining a licence to operate in the area.
The survey was undertaken on Exploration Licences 5077, 5199 and
5200 which are owned 100% by Monax Mining Limited. These 3 tenements are part of a farm-in agreement with Western Areas Limited. The tenements are partly located in Aboriginal Lands Trust (ALT), Yellabinna Regional Reserve and freehold land. The area outside of the ALT area is part of the Far West Native Title determination.
There are no known impediments to obtain a licence to operate in the area. Monax and Western Areas have commenced negotiations with the Aboriginal Lands Trust and the Far West Native Title Group.
Exploration done by other parties
Acknowledgment and appraisal of exploration by other parties. Several companies have explored for coal, mineral sands and nickel in the area. Monax has reviewed this exploration data and no systematic approach in the search for Ni-Cu has been undertaken.
Geology Deposit type, geological setting and style of mineralisation. Intrusive Ni-Cu style mineralisation.
Drill hole
Information
A summary of all information material to the understanding of the exploration results including a tabulation of the following information for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level - elevation above sea level in
metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from
the understanding of the report, the Competent Person should clearly explain why this is the case.
Not Applicable for magnetic survey.
Data In reporting Exploration Results, weighting averaging techniques, Not Applicable for magnetic survey.
Page 8
Criteria JORC Code explanation Commentary
aggregation methods
|
|
maximum and/or minimum grade truncations (eg cutting of high grades) and cut-off grades are usually Material and should be stated.
Where aggregate intercepts incorporate short lengths of high grade results and longer lengths of low grade results, the procedure used
for such aggregation should be stated and some typical examples of
such aggregations should be shown in detail.
The assumptions used for any reporting of metal equivalent values should be clearly stated.
|
Relationship
|
|
These relationships are particularly important in the reporting of
|
|
Not Applicable for magnetic survey.
|
between
|
Exploration Results.
|
.
|
mineralisation
|
|
If the geometry of the mineralisation with respect to the drill hole
|
widths and
|
angle is known, its nature should be reported.
|
intercept
|
|
If it is not known and only the down hole lengths are reported, there
|
lengths
|
should be a clear statement to this effect (eg 'down hole length, true
|
width not known').
|
Diagrams
|
|
Appropriate maps and sections (with scales) and tabulations of
|
|
Map showing location of survey area included in this report.
|
intercepts should be included for any significant discovery being
|
reported These should include, but not be limited to a plan view of
|
drill hole collar locations and appropriate sectional views.
|
Balanced
|
|
Where comprehensive reporting of all Exploration Results is not
|
|
Not Applicable for magnetic survey.
|
reporting
|
practicable, representative reporting of both low and high grades
|
and/or widths should be practiced to avoid misleading reporting of
|
Exploration Results.
|
Other
|
|
Other exploration data, if meaningful and material, should be reported
|
|
Data from previous exploration has been previously released.
|
substantive
|
including (but not limited to): geological observations; geophysical
|
exploration
|
survey results; geochemical survey results; bulk samples - size and
|
data
|
method of treatment; metallurgical test results; bulk density,
|
groundwater, geotechnical and rock characteristics; potential
|
deleterious or contaminating substances.
|
Further work
|
|
The nature and scale of planned further work (eg tests for lateral
|
|
Monax and Western Areas Limited will review newly acquired
|
extensions or depth extensions or large-scale step-out drilling).
|
magnetic data to assist in determining the next phase of exploration.
|
|
Diagrams clearly highlighting the areas of possible extensions,
|
including the main geological interpretations and future drilling areas,
|
provided this information is not commercially sensitive.
|
Page 9