TORONTO
ASM.TO
1.37 CA$
0.00%
Avino Announces Remaining Results From the Extended 22-Hole Exploration Drill Program at the Avino Mine
On August 14 2017
NYSE-MKT: ASM TSX-V: ASM FSE: GV6
VANCOUVER , Aug. 14, 2017 /CNW/ - Avino Silver & Gold Mines Ltd. (NYSE-MKT:ASM: TSX.V, ASM; "Avino" or the "Company") is pleased to announce the drill results from the remaining eleven holes of the extended 22-hole drill program at the main Avino Mine located on the Avino property, 80 Km northeast of Durango, Mexico . The 22-hole program, comprising approximately 3,374 metres, was extended from the original 18-hole program to fully evaluate the tonnage and the grade of the new area of the Avino Vein System between the San Luis workings and the Elena Tolosa ("ET") current production area. The results from the original eighteen hole drill program were released on December 21, 2016 and April 25, 2017 and are available on our website at the following links:
View original content with multimedia: http://www.newswire.ca/en/releases/archive/August2017/14/c7848.html
Other articles of the company