search
Avino Silver and Gold Mines
TORONTO ASM.TO 1.37 CA$ 0.00%
Logo

Avino Announces Remaining Results From the Extended 22-Hole Exploration Drill Program at the Avino Mine

On August 14 2017

NYSE-MKT: ASM TSX-V: ASM FSE: GV6

VANCOUVER , Aug. 14, 2017 /CNW/ - Avino Silver & Gold Mines Ltd. (NYSE-MKT:ASM: TSX.V, ASM; "Avino" or the "Company") is pleased to announce the drill results from the remaining eleven holes of the extended 22-hole drill program at the main Avino Mine located on the Avino property, 80 Km northeast of Durango, Mexico . The 22-hole program, comprising approximately 3,374 metres, was extended from the original 18-hole program to fully evaluate the tonnage and the grade of the new area of the Avino Vein System between the San Luis workings and the Elena Tolosa ("ET") current production area. The results from the original eighteen hole drill program were released on December 21, 2016 and April 25, 2017 and are available on our website at the following links:

View photos

View original content with multimedia: http://www.newswire.ca/en/releases/archive/August2017/14/c7848.html

Other articles of the company
Avino Files Technical Report on SEDAR
Avino Reports Voting Results of Annual General and Special M
Avino Reports Q1 2017 Financial Results
Avino Silver & Gold Mines Ltd. First Quarter 2017 Financial
Avino announces updated positive Preliminary Economic Assess
Articles en illimité et contenus premium Je m'abonne
Editorials
and News
Mining
Stocks
Gold
and Silver
Markets
search
search