Grab/select samples are selected samples and are not representative of the mineralization hosted on the property.
Dr. Bill Willoughby, the Company's mining engineer, supervised the underground development, including 530 feet of new workings into unexplored areas of the Mine, that intersected new mineralized zones. A stockpile of 1,300 tonnes of mineralized oxide and sulphide development material, both of which the Ore-Sorter readily sorts, was derived from both the upper level workings and the two new mineralized zones in the intermediate level.
The Company advises it is not basing any decision to produce on a feasibility study of mineral reserves demonstrating economic and technical viability and also advises there is increased uncertainty and specific economic and technical risks of failure associated with any production decision.
This News Release has been prepared on behalf of the Bayhorse Silver Inc. Board of Directors, which accepts full responsibility for its contents. Dr.. Clay Conway, P.Geol., a Qualified Person and Director of Bayhorse has prepared, supervised the preparation of, or approved the technical content of this press release.
On Behalf of the Board.
Graeme O'Neill, CEO
604-684-3394