ASX RELEASE

QUARTERLY ACTIVITIES REPORT DECEMBER 2015 QUARTER



ASX RELEASE - 28 JANUARY 2016


DECEMBER 2015 QUARTERLY ACTIVITIES REPORT

  • Temporary suspension of DSO operations at the NJV announced in December 2015

  • NJV shipments and costs for the quarter impacted by changeover to new haulage contractor

  • 0.87M wmt of Bonnie Fines shipped from the NJV (BC Iron share 0.70M wmt)

  • NJV C1 cash costs of A$54/wmt (FOB) and BC Iron all-in cash costs1 of A$59/wmt (FOB)

  • Realised CFR price of US$37/dmt (A$52/dmt) from average CFR 62% Fe price of US$47/dmt

  • Iron Valley EBITDA of A$2.5M from shipments of 1.72M wmt

  • Initial Buckland optimisation studies completed with outcomes including an expected capital and operating cost reduction to be announced during the March 2016 quarter

  • Cash balance of A$42.9M


BC Iron Limited (ASX: BCI) ('BC Iron' or the 'Company') presents shareholders with its quarterly activities report for the period ended 31 December 2015.

In December 2015, BC Iron announced that the Nullagine Joint Venture ('NJV') would temporarily suspend direct shipping ore ('DSO') operations due to low iron ore prices. The decision was made by NJV partners, BC Iron (75%) and Fortescue Metals Group Limited ('Fortescue') (25%), despite material cost reductions being achieved, including a variation of the rail and port tariff which varies with iron ore prices.

During the quarter, the NJV shipped 0.87M wet metric tonnes ('wmt') of Bonnie Fines (BC Iron share: 0.70M wmt). This was two shipments below expectations due primarily to the changeover of road haulage contractor in the quarter and a slower than expected ramp-up by the new contractor. The reduced

shipped tonnes also impacted costs with NJV C1 cash costs of A$54/wmt (FOB) and BC Iron all-in cash costs1of A$59/wmt (FOB).

Following the decision to temporarily suspend DSO operations at the NJV, operational focus has been on achieving the final DSO tonnages for shipment. However, the NJV continues to assess options in relation to its 11.1M wmt stockpile of low grade iron ore. The trial to sell an unprocessed parcel of low grade ore to Fortescue at Christmas Creek under a mine gate sale arrangement is now expected to be completed in February 2016.

Managing Director Morgan Ball said, "The decision to suspend DSO operations at Nullagine was an extremely difficult one but the right one for our shareholders. We will continue to assess alternative operating models for Nullagine, such as the potential low grade operation, and also ensure we are well placed to restart DSO operations if there is a sustained price recovery or if further cost savings are identified."

At Iron Valley, 1.72M wmt was shipped by operating partner Mineral Resources Limited ('MIN'), generating an EBITDA for BC Iron of A$2.5M with negligible prior period adjustments. MIN continues to progress the beneficiation and bulk ore transport system ('BOTS') initiatives that have the potential to improve the economics at Iron Valley for both BC Iron and MIN.


Head Office

Level 1, 15 Rheola Street West Perth WA 6005

1BC Iron all-in cash costs include NJV C1 cash costs plus royalties, marketing, exploration and evaluation expenses and corporate costs.


BC IRON LIMITED

ABN 21 120 646 924

Registered Office

Level 1, 15 Rheola Street West Perth WA 6005 Tel: (08) 6311 3400

Fax: (08) 6311 3449

Web: www.bciron.com.au


ASX Code: BCI

GPO 2811

Listed: 15 December 2006 Perth WA 6001

Page 1 of 8

QUARTERLY ACTIVITIES REPORT DECEMBER 2015 QUARTER


Improvements to the Buckland Project continued with road haulage optimisation studies and a partial re-pricing of capital and operating costs completed. BC Iron is also finalising preliminary cost estimates for an expanded road and port operation that makes use of the full 20 Mtpa port capacity contemplated in the Company's port lease agreement. Results of these activities will be announced during the March 2016 quarter.

"We are starting to see material improvements from our ongoing assessment work at Buckland," said Mr Ball. "We expect the results of this work will enhance the viability of a standalone development through reduced costs and also indicate that our road and port infrastructure has the potential to be a low capital intensity project with a very competitive operating solution for third parties."

BC Iron entered into a term sheet with the Australian Premium Iron Joint Venture ('API') in relation to co- operating around the mining of the parties' contiguous Bungaroo South and Buckland Hills deposits.

  1. NULLAGINE JOINT VENTURE ('NJV')

    BC Iron Nullagine Pty Ltd, a wholly owned subsidiary of BC Iron, is the operator and manager of the NJV, a 75:25 unincorporated joint venture with Fortescue Metals Group Limited ('Fortescue'). The project is located approximately 140km north of Newman in the East Pilbara region of Western Australia.

    Operations


    Dec Quarter 2015 (Mt)

    Sep Quarter 2015 (Mt)

    Variance Q-o-Q (%)

    Dec Quarter 2014 (Mt)

    Variance Y-o-Y (%)

    FY16 YTD (Mt)

    Ore Mined (dry)

    0.97

    1.21

    (19)%

    1.69

    (42)%

    2.18

    Produced (wet)

    1.14

    1.32

    (13)%

    1.42

    (19)%

    2.47

    Hauled (wet)

    0.88

    1.41

    (38)%

    1.43

    (38)%

    2.28

    Railed (wet)

    0.87

    1.44

    (40)%

    1.37

    (36)%

    2.31

    Shipped (wet)

    0.87

    1.40

    (38)%

    1.38

    (37)%

    2.27

    Key operational statistics for the quarter were as follows (Tables 1 and 2): TABLE 1: ORE PRODUCTION, HAULAGE & SHIPPING



    TABLE 2: STOCKPILE INVENTORY


    Dec Quarter 2015 (kt wet)

    Sep Quarter 2015 (kt wet)

    ROM Ore1

    110

    231

    Site Product

    235

    36

    RLF Product2

    36

    70

    Port Product

    70

    70

    Notes:

    Low-grade Ore

    11,120

    11,180

  2. Run of Mine ('ROM')

  3. Christmas Creek Rail Loadout Facility ('RLF')


  4. Page 2 of 8

    QUARTERLY ACTIVITIES REPORT DECEMBER 2015 QUARTER


    In December 2015, BC Iron announced that the NJV would temporarily suspend DSO operations due to low iron ore prices. The NJV is assessing options for its existing low grade stockpile of approximately 11.1M wmt. A trial to haul low grade to Christmas Creek and sell it to Fortescue under a mine gate sale arrangement will be undertaken during the March 2016 quarter. If successful, the NJV may continue to operate and sell part of this low grade stockpile to Fortescue on an ongoing basis.

    The NJV mined 0.97M dmt of DSO and produced 1.14M wmt of Bonnie Fines. Waste to ore ratios increased to 1.6:1 for the quarter (September 2015 quarter: 1.0:1) as mining took place in a part of the mine plan that was expected to have higher levels of waste. Following the decision to temporarily suspend DSO operations at the NJV, mining and crushing activities were completed in mid-January 2016 and Viento Contracting Services Pty Ltd is demobilising from site.

    Road haulage takes place via a private 60km bitumen haul road from the NJV mine site to Fortescue's Christmas Creek RLF. During the Quarter, the NJV awarded a new road haulage contract to Qube Bulk Pty Ltd ('Qube'), who commenced operations on 1 December 2015. Qube's ramp-up was slower than expected, which impacted the overall December 2015 quarter tonnage of 0.88M wmt hauled. However, road haulage is now running at expected operational rates and haulage of Bonnie Fines is scheduled to be completed in late January 2016. Following this, Qube will commence hauling low grade material to Christmas Creek as part of the mine gate sale trial.

    The Pilbara Infrastructure Pty Ltd ('TPI'), a wholly owned subsidiary of Fortescue, provides contract rail haulage and port services to the NJV. In October 2015, the NJV and TPI agreed to a three-month trial (1 November 2015 to 31 January 2016) to vary the rail and port tariff according to iron ore prices, such that it is below the existing tariff at iron ore prices below US$56/dmt CFR and above the existing tariff at prices above US$56/dmt CFR.2

    During the quarter, 0.87M wmt was railed from the Christmas Creek RLF to Port Hedland and 0.87M wmt of Bonnie Fines product was shipped on five capesize vessels. This was two shipments below expectations due to the road haulage contractor changeover and slower than expected ramp-up by the new contractor. BC Iron's share of tonnes shipped for the quarter was 0.70M wmt or 80% of the NJV total. BC Iron's share of sales since increasing its NJV interest to 75% in January 2013 is 75%.

    Occupational Health & Safety

    No lost time injuries were recorded during the quarter. As at 31 December 2015, the rolling 12 month lost time injury frequency rate was 3.9. This is a slight increase compared to 30 September 2015 (3.4), because man-hours reduced in the rolling 12 month period while the number of lost time injuries remained the same.


    2 Tariff varies according to FOB prices. CFR price of US$56/dmt assumes a freight rate of US$5.1/wmt. Refer ASX announcement dated 26 October 2015.



    Page 3 of 8

    QUARTERLY ACTIVITIES REPORT DECEMBER 2015 QUARTER


    Marketing

    The iron ore price steadily declined during the quarter, reaching a new low price of US$38.50/dmt in mid- December 2015. Overall, the CFR China 62% Fe price averaged US$47/dmt for the quarter, down from US$55/dmt in the September 2015 quarter.

    The average CFR sales price achieved for BC Iron's share of Bonnie Fines was US$37/dmt or A$52/dmt, which includes minor prior period and hedging adjustments.

    Operating Costs

    NJV C1 cash costs for the December 2015 quarter were approximately A$54/wmt (FOB) and BC Iron all- in cash costs were approximately A$59/wmt (FOB). This is an increase compared to September 2015 quarter costs of A$44/wmt (FOB) and A$52/wmt (FOB) respectively, primarily as a result of reduced sales tonnages due to changeover and ramp-up issues with the new road haulage contractor. This increase was despite further material cost saving initiatives, including the trial variation to rail and port costs.

    Resource Development and Exploration


    BC Iron received assays for the previously completed exploration and grade control drilling at Mulla Mulla 2 & 3. Results confirmed the presence of significant iron mineralisation with good continuity and these mesas continue to have potential as satellite developments should DSO operations resume.

    Exploration and grade control drilling at Mulla Mulla 1 was completed during the quarter and assays were also received. Results indicate Mulla Mulla 1 is less attractive from a potential development perspective than Mulla Mulla 2 & 3 due to a higher strip ratio.

    FIGURE 1: LOCATION OF MULLA MULLA MESAS


  5. IRON VALLEY PROJECT

  6. MIN operates the Iron Valley mine under an iron ore sale agreement with BC Iron. It is currently being operated as a DSO, truck haulage operation. During the quarter, MIN shipped 1.72M wmt of Iron Valley ore, generating an EBITDA for BC Iron of A$2.5M with negligible adjustments relating to prior periods.

    MIN continues to progress the beneficiation and BOTS initiatives. These initiatives offer potential upside to BC Iron in the future through increased production rates and increased received prices.


    Page 4 of 8

Read the rest of the article at www.publicnow.com
Data and Statistics for these countries : Australia | China | Georgia | All
Gold and Silver Prices for these countries : Australia | China | Georgia | All

BC Iron Limited

DEVELOPMENT STAGE
CODE : BCI.AX
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

BC Iron is a development stage company based in Australia.

BC Iron develops iron in Australia.

Its main asset in development is NULLAGINE IRON in Australia.

BC Iron is listed in Australia and in Germany. Its market capitalisation is AU$ 104.0 millions as of today (US$ 70.0 millions, € 63.1 millions).

Its stock quote reached its highest recent level on March 07, 2014 at AU$ 4.87, and its lowest recent point on February 05, 2016 at AU$ 0.08.

BC Iron has 392 529 984 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of BC Iron Limited
3/1/2017BC Iron tries its luck in the potash industry
11/27/2014Heads roll as BC Iron forced to cut costs amid weakest price...
Annual reports of BC Iron Limited
I Annual Report To Shareholders 2012
Financings of BC Iron Limited
4/15/2011Regent Pacific Re-Instates Financing for Scheme of Arrangeme...
Nominations of BC Iron Limited
9/22/2016Appointment of Managing Director (2 pages)
3/15/2013Appoints New Managing Director
9/23/2011Director Appointment
Project news of BC Iron Limited
5/25/2012Achieves 5MTPA Production Milestone
4/2/2012Increases Mineral Resource at Nullagine JV - 30 March 2012
5/11/2011Presenting At The RIU Sydney Resources Round-up
4/9/2010Moves Closer To Production After Signing Key Native Title Mi...
12/17/2009(Nullagine Iron)Nullagine Iron Ore Jv - First Project Funding Installment Re...
12/14/2009(Nullagine Iron)BCI And FMG Confirm Move Into Development Of Nullagine Proje...
11/10/2009(Nullagine Iron)Nullagine JV Secures US$50 Million Project Finance
10/16/2009(Nullagine Iron)Trial Mining Supports Key Technical Aspects Of Nullagine Iro...
9/17/2009(Nullagine Iron)Commences Trial Mining at the Nullagine Iron Ore Project
8/24/2009(Nullagine Iron)Formally Enters into Nullagine JV with FMG
7/3/2009(Nullagine Iron)Board Approves Development of Nullagine Iron Ore Project
1/7/2009(Nullagine Iron)Increases DSO Resource by 64% to 46Mt, Total CID Resource 80...
9/30/2008(Nullagine Iron)Infill Drilling Completed at Nullagine Iron Ore Project
9/1/2008(Nullagine Iron)In-Fill Drilling Results Confirm Direct Shipping Resource Qu...
7/11/2008Open BriefingR - MD on Feasibility Study & Future Plans
7/1/2008(Nullagine Iron)Commits to Nullagine Feasibility Study Following Positive Sc...
3/31/2008(Nullagine Iron)Delivers Maiden 47 Million Tonne Iron Ore Resource at Nullag...
Corporate news of BC Iron Limited
9/14/2016Company Update
8/1/2016FY16 Full Year Results Release (6 pages)
8/1/2016Appendix 4E and FY16 Financial Report (61 pages)
7/29/2016Quarterly Activities Report (4 pages)
7/5/2016Response to ASX Price and Volume Query (4 pages)
6/27/2016Settlement of BC Iron Litigation
6/26/2016WTP: Settlement of BC Iron Litigation (1 pages)
6/24/2016Watpac Settlement (2 pages)
5/20/2016BCI: Iron Valley Update
5/20/2016Iron Valley Update (2 pages)
5/18/2016Management Changes (3 pages)
4/29/2016Update on litigation against Watpac (2 pages)
4/21/2016Quarterly Activities Report (7 pages)
1/28/2016Quarterly Activities Report (8 pages)
12/31/2015Appendix 3B - expiry of performance rights (12 pages)
12/24/2015Commencement of litigation against Watpac (2 pages)
12/22/2015NJV Contract Update (2 pages)
12/22/2015WTP:Update on Dispute with BC Iron - Nullagine Iron Ore Prjt...
11/27/2015Appendix 3B (13 pages)
11/27/2015Change of Director's Interest Notice - M Ball (2 pages)
10/26/2015Variation to NJV Rail and Port Tariff (3 pages)
10/23/2015NJV Awards Road Haulage Contract (2 pages)
10/21/2015Quarterly Activities Report (7 pages)
10/6/2015Managing Director Employment Terms (2 pages)
9/16/2015Change of Director's Interest Notice - M Ball (2 pages)
9/3/2015S&P DJ Indices Announces September Quarterly Rebalance (4 pa...
8/31/2015Correction to Underlying Net Loss After Tax (2 pages)
8/31/2015Updated FY15 Annual Report to shareholders (96 pages)
8/28/2015Company Secretary Resignation - A Bird (2 pages)
8/26/2015FY15 Full Year Results Presentation (24 pages)
8/26/2015FY15 Annual Report and Appendix 4E (97 pages)
8/26/2015Appendix 4G (14 pages)
8/25/2015NJV Ore Reserves and Mineral Resources (21 pages)
7/23/2015Quarterly Activities Report - June 2015 Quarter (8 pages)
6/11/2015Repayment of Term Loan Facility (2 pages)
4/23/2015NJV Warrigal Hub Contract Update 23.04.15
4/23/2015NJV Warrigal Hub Contract Update (2 pages)
4/22/2015BC Iron March 2015 Quarterly Activities Report (8 pages)
4/9/2015March 2015 Quarter Update (2 pages)
4/2/2015NJV Contracting Strategy Update (2 pages)
3/24/2015Warrigal Hub Contract Award (3 pages)
3/24/2015Mines & Money Presentation (20 pages)
3/9/2015Presentation (20 pages)
3/5/2015S&P DJ Indices Announces March Quarterly Review (9 pages)
9/6/2013Latest Headlines and New Issue Alert: Sibanye production rec...
10/22/2012September 2012 Quarterly Activities Report
8/21/2012I Forms Iron ore Stratigic Alliance in Brazil
8/16/2012I ASX Announcement - Mineral Resource and Ore Reserve 30 Jun...
7/5/2012I Achieves All Operational Guidance FY12
4/17/2012Quarterly Report for the period ending 31 March 2012
2/29/2012Half Year Results - December 2011 & Company Update
10/24/2011Quarterly Report for the period ending 30 September 2011
9/23/2011September Company Update
8/11/2011Operations Update
4/29/2010Quarterly Activities Report For The Period Ending March 31, ...
4/15/2010Welcomes New Institutional Investors
10/30/2009Quarterly Activities Report For The Period Ending 30 Septemb...
7/29/2009June 2009 Quarterly Report
6/19/2009Announces $22M Capital Raising
6/5/2009Seals Company-Making Deal with FMG
5/28/2009North West Iron Ore Alliance Congratulates BC Iron on Landma...
5/28/2009secures infrastructure deal with The Fortescue Metals Group ...
3/4/2009Open Briefing - MD on Off-take Agreement and Recent Progress
2/11/2009Secures Landmark Long-Term Off-Take Agreement for Nullagine ...
1/28/2009Quarterly Activities Report December 2008
1/8/2009Carmichael Quick Note
11/27/2008horses for courses
10/2/2008Practical Parenting Support for Families from Hedland's Juni...
9/8/2008Gearing Up For The New Iron Age
8/8/2008Plans in the Fire
8/6/2008New Access Rules for Infrastructure
8/6/2008Sunday Times Article - Hot Stock
7/31/2008June 2008 Quarterly Activities Report
7/29/2008Diggers and Dealers
7/24/2008Ocean Equities Ltd - Iron Ore Sector Update
7/14/2008Comment On Take Over Speculation
6/20/2008NCC Declaration
6/16/2008Shinier Than Gold in Stock Market
4/30/2008 Quarterly Activities Report
4/21/2008 Open BriefingR. MD Explains Nullagine Resource Upgrade.
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
AUSTRALIA (BCI.AX)BERLIN (BC3.BE)
0.265+0.00%0.097+2.11%
AUSTRALIA
AU$ 0.265
09/13 15:49 -
0%
Prev close Open
0.265 0.270
Low High
0.265 0.270
Year l/h YTD var.
0.220 -  0.320 -5.36%
52 week l/h 52 week var.
0.220 -  0.320 -3.64%
Volume 1 month var.
488,473 10.42%
24hGold TrendPower© : 27
Produces
Develops Iron
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2024-1.85%0.320.22
20230.00%0.300.20
2022-37.21%0.480.21
202143.33%0.620.29
202076.47%0.310.10
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.00+1.01%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 9.36+6.61%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.60+3.10%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+10.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 1.98+0.51%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 12.12+4.21%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.34+3.03%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.18+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.83+8.93%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 40.01+0.20%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04-4.55%Trend Power :
Take advantage of rising gold stocks
  • Subscribe to our weekly mining market briefing.
  • Receive our research reports on junior mining companies
    with the strongest potential
  • Free service, your email is safe
  • Limited offer, register now !
Go to website.