Pitchstone Reports Uranium Results at Johnston Lake
Published : April 18, 2011

- Unconformity Related Uranium Mineralization in Two Holes

- Pitchstone Earns a 49% Initial Interest in Johnston Lake

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Canada | Namibia | Nickel | Uranium |

VANCOUVER, BRITISH COLUMBIA--(Marketwire - April 18, 2011) - Pitchstone Exploration Ltd. (TSX VENTURE:PXP) ("Pitchstone") announces that it has received analytical results on all samples collected from recent drilling at the Johnston Lake property in the eastern Athabasca Basin in Saskatchewan. Johnston Lake is contiguous with Pitchstone's 100% owned Gumboot property.

Johnston Lake Results

As part of a larger drilling program that included the Gumboot property, three drill holes were completed at Johnston Lake to follow up on the results of drilling in 2010. Encouraging sandstone alteration, structure and graphitic basement rocks were intersected in all three holes. Intervals of elevated radioactivity in basement rocks near the sub-Athabasca unconformity were observed in two of the holes (JL-25R & JL-27; see March 21, 2011 news release). The analytical results confirm that the radioactivity is due to unconformity related uranium and, with all previous drill results from both Gumboot and Johnston Lake, are summarized in the table below.

Property Hole-ID From (m) To (m) Length (m) U-p (ppm) U3O8(%) Ni (%) Co (%)
Gumboot GB-05* 661.1 665.9 4.8 32 0.00 0.13 0.02
  GB-06* 662.3 664.2 1.9 558 0.07 0.01 0.00
  GB-07* 659.6 663.8 4.2 917 0.11 2.29 1.70
  including 663.4 663.5 0.1 17,472 2.06 1.15 0.23
  GB-07D1* 659.9 661.1 1.2 326 0.04 0.72 1.04
  including 659.9 660.2 0.3 985 0.12 0.08 0.02
  GB-07D2* 667.1 681.2 14.1 64 0.01 1.04 0.15
  GB-08* 673.3 673.5 0.2 248 0.03 0.14 0.28
  and 698.1 698.8 0.7 551 0.07 0.01 0.00
  GB-10* 676.2 677.4 1.2 1,482 0.17 2.84 0.16
  including 676.5 676.8 0.3 5,620 0.66 11.10 0.57
  GB-14* 714.8 715.2 0.4 57 0.01 3.32 0.09
  GB-23* 686.7 687.0 0.3 4,471 0.53 1.92 0.80
  including 686.7 686.8 0.1 12,500 1.47 2.45 1.61
  GB-24D1* 694.3 705.8 11.5 147 0.02 0.47 0.06
  including 699.5 699.6 0.1 2,520 0.30 0.03 0.03
  including 702.4 703.3 0.9 115 0.01 2.73 0.27
Johnston Lk MJ-03** 618.8 619.0 0.2 4,100 0.48 0.01 0.00
  MJ-06*** 598.3 598.4 0.1 865 0.10 Not Analyzed Not Analyzed
  and 599.3 599.4 0.1 615 0.07 Not Analyzed Not Analyzed
  MJ-07** 661.4 668.3 6.9 24 0.00 1.08 1.07
  MJ-08** 581.4 581.9 0.5 1,980 0.23 0.02 0.01
  JL-21R* 614.0 614.9 0.9 286 0.03 0.05 0.01
  JL-25R 638.5 639.1 0.6 659 0.08 0.01 0.01
  including 638.6 638.7 0.1 1,090 0.13 0.01 0.01
  JL-27 650.1 651.0 0.9 910 0.11 0.07 0.02
  including 650.6 650.7 0.1 3,240 0.38 0.11 0.02
* - Previously reported
** - Historic (Pre-Pitchstone)
*** - Historic with 6094 ppb Au

Drill holes JL-25R and JL-27 were drilled along the east-west oriented MJ-1 conductor, and each was drilled on section with one historic hole. The MJ-1 conductor is a 3.8 kilometer segment of a 10 kilometer long conductor system at Johnston Lake. JL-25R was drilled 40 meters south of historic hole MJ-06. A 21 meter vertical offset in the unconformity between the two holes suggests the presence of a major fault. Unconformity uranium deposits in the Athabasca are often associated with faults that offset the unconformity. 

Drill hole JL-27 was drilled two kilometers west of JL-25R and 30 meters north of historic hole MJ-07. MJ-07 intersected 6.9 meters of 1.08% nickel at the unconformity. The presence of significant uranium near the high grade base metal mineralization suggests that there is good potential for higher grade uranium mineralization in the area.

Initial Interest Earned

Upon completion of this drilling program, Pitchstone has surpassed the expenditure requirements to earn an initial 49% interest in the property from Denison Mines Corp (Denison). Notice has been given to Denison that Pitchstone intends to proceed with the second stage earn-in which, if completed, will give Pitchstone a 75% interest in the property. Pitchstone notes that recent results from both Gumboot and Johnston Lake provide further evidence of widespread unconformity related mineralization in the area. Geologically, these properties have many of the variables associated with large, high grade unconformity related uranium deposits.

Steve Blower, P.Geo., President and CEO of Pitchstone, is the Qualified Person for the purposes of NI 43-101 with respect to the technical information in this news release. Sample preparation and analyses were done by SRC Geoanalytical Laboratories, Saskatoon. A partial digestion with fluorimetric analysis was used for initial uranium determinations, and then all samples containing greater than 100 ppm uranium were re-analyzed with ICP. Pitchstone utilizes internally and externally submitted standard reference materials for quality assurance and quality control of the sample preparation and analyses. There is insufficient information to estimate the true thickness of the mineralization.

About Pitchstone

Pitchstone is exploring for uranium in three proven districts in Canada and Namibia. The property portfolio features 11 projects in the eastern Athabasca Basin, Saskatchewan, three of which are 100% owned. In addition, there is a joint venture on two projects in Namibia and several joint venture projects in the Hornby Bay Basin, Nunavut. Pitchstone benefits from the collaboration of a unique group of geologists with extensive uranium exploration and production experience. 

On behalf of the Board,

Steven J. Blower, President and CEO

This news release may contain assumptions, estimates, and other forward-looking statements regarding future events. Such forward-looking statements involve inherent risks and uncertainties and are subject to factors, many of which are beyond Pitchstone's control, that may cause actual results or performance to differ materially from those currently anticipated in such statements.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Pitchstone Exploration Ltd.
Claire Stewart
604 630 5563
or
Pitchstone Exploration Ltd.
Mark T. Brown
CFO
604 687 3520
www.pitchstone.net
Data and Statistics for these countries : Canada | Namibia | All
Gold and Silver Prices for these countries : Canada | Namibia | All

Pitchstone Exploration Ltd.

EXPLORATION STAGE
CODE : PXP.V
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Pitchstone Expl. is a silver and gold exploration company based in Canada.

Pitchstone Expl. holds various exploration projects in Canada.

Its main exploration properties are FIREWEED, DISMAL LAKE, GUMBOOT & JOHNSTON LAKE, KENDALL RIVER, DARBY & CANDLE, MOUNTAIN LAKE, LEITH PENINSULA, ATHABASCA and HORNY BAY in Canada and DOME PROPERTY in Namibia.

Pitchstone Expl. is listed in Canada. Its market capitalisation is CA$ 4.1 millions as of today (US$ 3.9 millions, € 3.1 millions).

Its stock quote reached its highest recent level on December 31, 2007 at CA$ 4.95, and its lowest recent point on December 16, 2011 at CA$ 0.07.

Pitchstone Expl. has 45 208 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of Pitchstone Exploration Ltd.
7/18/2011Arranges Private Placement
12/8/2009Flow-Through Financing
7/7/2009Completes $610,000 Private Placement
12/6/2007Closes $3.1 Million Private Placement
8/9/2007$3,000,000 Private Placement Closes
Option Grants of Pitchstone Exploration Ltd.
12/1/2010Grants 910,000 stock options to Directors, Officers and Empl...
Project news of Pitchstone Exploration Ltd.
1/31/2012(Dome Property)Uranium Exploration Plans for 2012
10/11/2011Options Dome Uranium Property to Rio Tinto
6/20/2011(Athabasca)Finalizes Summer Athabasca Drilling Plans
4/5/2011(Wolverine Athabaska)Receives JOGMEC Budget Approval
3/30/2011(Dome Property)Receives Marble Ridge Uranium Analyses
3/22/2011(Gumboot & Johnston Lake)Reports Uranium Results at Gumboot
2/8/2011(Dome Property)Drills Calcrete Uranium in Namibia
7/14/2010(Athabasca)Provides Eastern Athabasca Uranium Exploration Update
6/15/2010(Athabasca)Provides Uranium Exploration Update
5/25/2010(Dome Property)Analytical Results Received for Dome Uranium Property, Namib...
5/18/2010(Athabasca)Plans Summer Drilling
3/23/2010(Athabasca)Completes Drilling
2/10/2010(Dome Property)Finds New Uranium Occurrence in Namibia
1/19/2010(Athabasca)Resumes Athabasca Uranium Drilling
11/30/2009(Athabasca)Continues Namibia and Athabasca Uranium Exploration
9/16/2009(Dome Property)Intersects Radioactivity in Namibia
8/25/2009(Dome Property)Finalizes Namibia Uranium Drilling Plans
6/30/2009(Gumboot & Johnston Lake)Begins summer drilling at Gumboot
2/26/2009(Gumboot & Johnston Lake)Uranium Drilling Update
1/13/2009(Athabasca)Athabasca Uranium Drilling Begins
11/7/2008(Dome Property)Drilling Begins at Dome Uranium Property, Namibia
8/6/2008(Darby)Joint Venture Drilling Progress
6/24/2008(Horny Bay)Drilling Progress
5/9/2008(Dome Property)Namibia 2008 Uranium Exploration Initiated
4/2/2008(Athabasca)Athabasca Exploration Results
1/24/2008(Horny Bay)2008 Hornby Bay Exploration Program
1/15/2008Athabasca Drilling Resumes at 97G Zone on Candle Property
12/17/2007(Dome Property)Namibia Exploration Update
11/6/2007(Kendall River)Purchase of Hornby Bay Properties Completed
7/25/2007(Darby & Candle)Candle Drill Hole Assays
7/5/2007(Darby & Candle)Radioactivity Intersected at Candle
4/20/2007(Darby & Candle)ATHABASCA EXPLORATION RESULTS & FINANCIAL UPDATE
Corporate news of Pitchstone Exploration Ltd.
10/24/2011(Athabasca)Reports Athabasca Drilling Results
4/18/2011Reports Uranium Results at Johnston Lake
2/28/2011Completes Namibia Uranium Drilling Program
8/18/2010Confirms New Uranium Occurrence at Wolverine
6/11/2009Survey Generates Uranium Targets in Namibia
3/11/2009JOGMEC Options 50% of Wolverine and Marten
12/15/2008Uranium Exploration Update
12/1/2008Increases Interest in Athabasca Properties
8/28/2008Hornby Bay Exploration
7/15/2008Engages Investor Relations Firm
5/21/2008News Release
3/25/2008Gabon Uranium Exploration Gabon Uranium Exploration
10/11/2007Drilling Commences at Waterfound
9/18/2007Athabasca Basin Update
9/17/20072007 Hornby Bay Exploration Completed
8/8/2007Gabon Uranium Exploration
6/21/2007Drilling Begins at 100% Owned Gumboot Property
5/9/2007Hornby Bay Drilling Begins
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (PXP.V)
0.090+0.00%
TSX-V
CA$ 0.090
06/28 15:21 -
0%
Prev close Open
0.090 0.090
Low High
0.090 0.090
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.090 -%
Volume 1 month var.
15,000 -%
24hGold TrendPower© : -44
Produces
Develops
Explores for Cobalt - Copper - Gold - Lead - Nickel - Silver - Uranium - Vanadium - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 12/16/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 6.69-0.15%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 8.26+2.29%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.61+3.40%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06-8.33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
 2.11+1.44%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
 12.99+0.00%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
 0.30+7.14%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
 0.20+2.56%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
 2.20+1.38%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 38.96-0.38%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.10-4.55%Trend Power :
Sun Res.(Oil)SUR.AX
Released ASX Announcement: Quarterly Activities Report
AU$ 0.00+0.00%Trend Power :
Take advantage of rising gold stocks
  • Subscribe to our weekly mining market briefing.
  • Receive our research reports on junior mining companies
    with the strongest potential
  • Free service, your email is safe
  • Limited offer, register now !
Go to website.