Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
Cours Or & Argent

Blue Rock Resources Ltd.

Publié le 11 octobre 2007

Announces Mongolian Results From The 2007 Uranium Exploration Projects, And New Coal Discov

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Uranium |

News

Blue Rock Resources Ltd.

 
 Thursday, October 11, 2007
Bluerock Announces Mongolian Results From The 2007 Uranium Exploration Projects, And New Coal Discovery

  Vancouver, B.C., October 11, 2007 -- Bluerock Resources Ltd. (TSX-V: BRD) (the Company) announces drilling and trenching results from the 2007 exploration programs on the Ulaan Nuur Basin uranium projects in Mongolia. The drilling programs were focused on three separate licenses, the Khavtsal, Khudgiin Us and Tolgod, all of which are located south of Ulaanbaatar in the Ulaan Nuur Basin.

Assay results defined anomalous uranium mineralization in drillholes and trenches on the Khavtsal license. Uranium in drill holes returned grades ranging from trace up to 0.026% U3O8 over 1.85 metres with 5 intervals over 0.014% U3O8. Assays from trenching sampling returned grades from trace up to 0.265% U3O8 over 0.75 metres with 9 intervals over 0.06% U3O8.

Additionally, the 2007 Khavtsal drilling program identified substantial thicknesses of coal with 18 of the 30 drill holes returning intervals greater than 1 metre of coal. 10 of these drill holes intersected greater than 10 metres total thicknesses of coal. Drill hole KH07-19 returned a 26 metre thick coal horizon within a 46 metre inter-bedded section of coal, sand and clay. These newly discovered coal intervals have been identified over a 1 by 3 kilometre area and are open to extension to the north and south. As the drill program was designed to identify and measure uranium mineralization, the drill technique, sampling and logging was not optimized to define coal resources. The Company is planning a focused drill program to define the quality and continuity of these coal seams.

President Michael Collins commented: "The drilling program succeeded in expanding the known uranium mineralization at Khavtsal in both area and to depth. In addition, the company has identified significant intervals of coal located only 30 kilometres from a railhead. Bluerock will move aggressively to capture the value of this new coal asset."

Uranium Results:

Khavtsal

Assay results from the drilling program on the Khavtsal property have demonstrated continuity between two known, near surface, uranium occurrences and more importantly, indicated that uranium mineralization does extend to depth within the basin. Bluerock's geologists interpret the defined uranium anomalies as related to reduction (redox) fronts in the hosting sandstone's lignite horizons. This may indicate the presence of a large tonnage roll-front type deposit in the area, a program is being designed explore this potential. Bluerock crews drilled 30 Reverse Circulation holes (2,938 total metres) on the Khavtsal property in 2007, with an averaged depth of 100 metres. Khavtsal had received a limited amount of uranium exploration work during the 1980's by a Soviet/Mongolian JV. The Soviets outlined two zones of near surface, lignite hosted uranium, and a preliminary (non N.I. 43-101 compliant) resource was calculated at that time.

A summary of significant intercepts from the 2007 Khavtsal drilling and gamma probing programs are listed below. Hole KH07-16 was successful in confirming 1980's exploration results. Holes KH07-21, KH07-28 and KH07-29 expanded the area of know mineralization:

Hole Number

From (metres)

To (metres)

Thickness (metres)

Grade eU3O8 (%)

KH07-28

74.35

76.85

2.5

0.020

KH07-28

26.9

29.05

2.15

0.019

KH07-29

27.75

29.6

1.85

0.026

KH07-21

10.15

12.7

2.55

0.014

KH07-16 (twin)

23.95

25.25

1.3

0.026



Concurrent with the drilling program, Bluerock crews excavated 12 trenches on the Khavtsal license designed to confirm and test near surface uranium mineralization as defined from the 1980's vintage Soviet uranium exploration programs. Trenches averaged 2 metres in width and 3 metres in depth.

All trenches expanded upon and/or confirmed the reported uranium mineralization. Trench TR07-01 established an interpreted continuity between two historical* uranium showings.

A summary of significant trench sample results, by XRF technique, are listed below:

Trench Number

Sample Thickness (metres)

Grade (%U3O8)

TR07-01

0.25

0.255

TR07-01

1.5

0.078

TR07-08

2.3

0.073

TR07-08

2.2

0.075

TR07-08

2

0.064

TR07-08

2.4

0.027

TR07-09

0.75

0.265

Including

0.2

0.886

TR07-09

1.35

0.041

TR07-10

1.8

0.104

TR07-10

2.3

0.041

TR07-10

1.3

0.060


All drill and trench results from the 2007 Khavtsal exploration program are being integrated with historic* Soviet data by Company staff.

Khudgiin Us

Nine widely spaced RC holes (904 total metres) were drilled on the Khudgiin Us license. The drill program was designed to locate the northern extension of known uranium mineralization in the Ulaan Nuur historic* uranium anomaly and integrated both surface mapping and the spring 2006 Bluerock geophysical surveys. While favourable sedimentary horizons were encountered, they were generally thin and relatively un-mineralized with assay values ranging from trace to 47 ppm U over 0.3 metres.

Tolgod

Four RC drill holes (159 total metres) were completed on the Tolgod concession and designed to target sedimentary hosted uranium mineralization. The basin was found to be shallower than postulated, constraining its potential to host a significant deposit. No significant assay were returned from this program

Central Gobi

Bluerock's 2007 Mongolia uranium exploration projects remain active with a planned 4,000 metre RC, 2,000 metre diamond drilling and combined trenching program currently underway on the Central Gobi Project. The first samples from this program have been sent to the lab and initial results are expected in approximately one month.

Assaying and Analysis

Gamma log probing was carried out by G&DS Co. Ltd., (a third party contractor), who has a long record of third party geophysical surveying for TSX listed companies. The downhole logging system, manufactured by Mount Sopris Instrument Company, included a motorized winch based MXA-1000 unit, MGX II and Matrix data interface consoles and two downhole probes, a 2PGA-1000 (Natural Gamma, SP, Single Point Resistance) and 2PEA-1000 (Normal Resistivity). The 2PGA-1000 probe was calibrated at the company's Grand Junction, Colorado calibration facilities on February 2007. Drill cutting check samples were collected and assayed by XRF to verify results and disequilibrium issues.

Drill and trenching samples from the 2007 exploration programs were prepared and analysed by Activation Laboratories, (Actlabs) of Ancaster Ontario, at their lab in Ulaanbaatar, Mongolia. Rock preparation consisted of crushing and pulverising to 85% passing 75 micron mesh. Uranium results were analysed by XRF. Drilling samples were collected as chips from each 1 meter run. Chips were gamma probed with a hand held scintillometer by Company staff and samples collected on all intervals with greater than 120 CPS. Trenching samples were collected from in vertical channels through the stratigraphic (flat lying) target horizons. All samples of interest, plus 10% of the remainder are shipped to Canada by Actlabs, for ICP-MS verification at their Ancaster facility.

These projects are under an option agreement with Uranerz (see News Release of September 12, 2006) where the Company has the right to earn up to a 70% interest in the 8 exploration projects.

Paul D. Gray, P.Geo. is the Qualified Person with respect to the Mongolian JV properties and has reviewed and approved this press release.


Bluerock Resources Ltd. is a uranium exploration company focused on discovering tomorrow's energy today through the acquisition and development of conventional uranium resources.

ON BEHALF OF THE BOARD OF DIRECTORS

Michael Collins
CEO, President and Director

For further information, please contact:
Cary Martin, Manager of Investor Relations
Bluerock Resources Ltd.
350-580 Hornby St,
Vancouver BC, V6C 3B6
Telephone: (604) 687-2471
Facsimile: (604) 687-2472
Website: www.bluerockresources.com
Email: cmartin@bluerockresources.com


*Historical work was conducted by previous operators. The reliability of historic data is unknown but considered relevant, however confirmation work may produce results that differ substantially from the historic results.

Statements contained in this document that are not historical facts are forward looking statements as that term is defined in the Private Securities Litigation Reform Act of 1995. Such forward -looking statements are subject to risks and uncertainties which could cause actual results to differ materially from estimated results. Such risks and uncertainties are detailed in the Company's filings with the B.C. Securities Commission.

The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this news release

 
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Blue Rock Resources Ltd.

CODE : BRD.V
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Blue Rock Res. est une société d’exploration minière d'argent et d'or basée au Canada.

Blue Rock Res. détient divers projets d'exploration en USA, au Canada et en Mongolie.

Ses principaux projets en exploration sont SUNBEAM et J-BIRD en USA et BLUE GROUSE au Canada.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de Blue Rock Resources Ltd.
02/08/2007Closes $6.7 Million in Financings
Projets de Blue Rock Resources Ltd.
02/02/2009(J-bird)Returns J-Bird Uranium Mine To Vendors
29/05/2008(Sunbeam)Anounces Phase I Drill Results Including 2.38% eU3O8 Over 1....
11/10/2007(Khavtsal)Announces Mongolian Results From The 2007 Uranium Exploratio...
Communiqués de Presse de Blue Rock Resources Ltd.
19/02/2009ells United States Subsidiary
24/01/2009Director Resigns
22/09/2008s Mining And Development Project Status Of US Uranium Mining...
10/04/2008 Advances Uranium Mill Plans Via The Acquisition Of Mancos R...
07/04/2008sets sights on production
01/04/2008 Formalize Mongolian Joint Venture
16/01/2008 Reports Airborne Radiometric Survey Results From The Easter...
06/09/2007Signs Option Agreement To Purchase 100% Of The J-Bird Uraniu...
23/08/2007Signs Option Agreement On Cone Mtn. Uranium Project, Mesa Co...
03/08/2007Issues Incentive Options
14/06/2007Reports On On-Going Drilling And Development Programs At The...
04/04/2007Starts Drilling At The Tramp Mine
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (BRD.V)
0,075-6.25%
TSX-V
CA$ 0,075
05/07 11:56 -0,010
-6,25%
Cours préc. Ouverture
0,080 0,075
Bas haut
0,075 0,075
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,075 -%
Volume var. 1 mois
9 500 -%
Produit
Développe
Recherche
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,24 AU$+0,76%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 +100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,06 US$+1,93%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,57 GBX-4,68%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+18,18%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,26 +6,10%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 +0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
14,59 +0,97%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,31 +3,33%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 -2,38%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
2,20 +4,27%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
42,96 US$+0,23%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :
Sun Res.(Oil)SUR.AX
Released ASX Announcement: Quarterly Activities Report
0,00 AU$+0,00%Trend Power :
Profitez de la hausse des actions aurifères
  • Inscrivez-vous à notre market briefing minier
    hebdomadaire
  • Recevez nos rapports sur les sociétés qui nous semblent
    présenter les meilleurs potentiels
  • Abonnement GRATUIT, aucune sollicitation
  • Offre limitée, inscrivez-vous maintenant !
Accédez directement au site.