Microsoft Word - 20141218 ASX Announce _Exploration Update_.docx
BUREY GOLD LTD
Level 1, Suite 5
The Business Centre
55 Salvado Road
Subiaco WA 6008
Australia
P. +61 8 9381 2299
F. +61 8 9380 6761
A.B.N. 14 113 517 203
BUREY GOLD
GUINEE SARL
Sud 2eme Droit Immeuble Ali Youssef Kochour
Quartier Boulbinet
[entre 5eme Av. et 5eme Boul.] Conakry
Républicde Guinée
B.P. 3938. Conakry
Républicde Guinée
P. +224 64 35 48 02
P. +224 68 02 19 68
BUREY GOLD
GHANA LTD
Hse1/ 47 Giffard Road East Cantonments AccraGhana
P. +233 244 317 632 www.bureygold.com
18 December 2014 ASX RELEASE
EXPLORATION UPDATE AT GIRO PROJECT, DRC
Burey Gold Limited (ASX: BYR) advises that additional steel casing has arrived on site at the Giro Gold Project in the Kibali belt, North East Democratic Republic of Congo to address the problems encountered at the start of the drill program with the extremely wet ground conditions.
The first hole has now been successfully drilled with dry sample recovered down to 120m. In view of the delays caused by the weather, the Company will continue to drill throughout the Christmas period to ensure that the planned 3,000m reverse circulation drilling programme is completed early in 2015 with all results expected during the first Quarter of 2015.
Soil sampling and detailed geological mapping and sampling programmes have been completed at the Giro Prospect, designed to confirm the potential strike extent and continuation of gold mineralisation identified in initial earlier drilling at Giro.
For more information contact:
Klaus Eckhof Peter Taylor
Chairman Investor Relations
Tel: +377 680 866 300 Tel: +61 (0) 412 036 231 [email protected] [email protected]
Or visit www.bureygold.com
1 | P a g e