Exploration Update
=======================================================================
Vancouver, BC - Triex Minerals Corporation (TXM-TSX.V) (the "Company")
continues to actively evaluate and advance it's portfolio of uranium
projects across North America, and is pleased to provide an update of
both current and planned activities. Property details, including
ownership and location maps are available on the Company's website at
www.triexminerals.com.
Completed and upcoming programs during 2008 include, in chronologic
order:
-Pasfield Lake: 70 line-kilometres of transient magnetotelluric surveys
(AMT) completed in April, both infilling and extending the previous
grid.
-Riverlake & Highrock: 211 line-kilometres of ground EM surveys
completed in April on four grids.
-Mann Lake: 2,534 metres of drilling in three holes, finished in April
to complete the program started in November. One target on the property
remains to be tested.
-Mountain Lake: 2,450 metres of drilling completed in nine holes on
three regional targets at Mountain Lake. Drilling at the fourth target
(Kendall River) is ongoing and will be completed within the next two
weeks.
-Pasfield Lake: 30 line-kilometres of soil and biogeochemistry (>800
samples) completed in July on the AMT grid that spans the Cable Bay
Shear Zone east of the lake.
-Pasfield Lake: a 140 line-kilometre airborne 3-D Full Tensor gravity
gradient survey has mobilized, and is designed specifically to produce
forward-modeled gravity profiles across the uplift block.
-Riverlake & Highrock: grid-based soil geochemistry is planned for
early August, and will cover conductors defined on both airborne and
ground EM surveys.
-West Carswell: a 35 line-kilometre transient magnetotelluric survey
(AMT) is planned for August on one grid with 7 lines designed for three
dimensional modeling of conductors associated with the Harrison Shear
Zone.
-Riverlake & Highrock: 2,500 metres of
Diamond drilling contracted to
Northwest Drilling for September will test highest priority, near
surface targets.
-Stony Road: 3,000 metres of
Diamond drilling contracted to River
Valley Energy Services for October to test coincident airborne and
ground conductors.
-Pasfield Lake: 3,000 metres of drilling planned for November-December
to test the Cable Bay Shear Zone east of the lake using results from
the summer geochem, AMT and gravity surveys.
-West Carswell: 3,000 metres of
Diamond drilling planned for
January-February 2009 will test the Harrison Shear Zone using results
from the upcoming AMT survey.
Dr. Allan Armitage, Ph.D., P.Geo., Vice President - Exploration of
Triex, is a Qualified Person as defined by National Instrument 43-101,
and is responsible for program design and quality control of
exploration undertaken by the Company. This release has been reviewed
by Dr. Michael Gunning, Ph.D., P.Geo., President of Triex and a
Qualified Person as defined by National Instrument 43-101.
TRIEX MINERALS CORPORATION
"Michael Gunning"
Michael Gunning, President
For further information please contact Investor Relations at
604-687-6680 or info@triexminerals.com
The TSX Venture Exchange has not reviewed and does not accept
responsibility for the adequacy or accuracy of the contents of this
news release.
=======================================================================
Copyright (c) 2008 TRIEX MINERALS CORPORATION (TXM) All rights
reserved. For more information visit our website at
http://www.triexminerals.com/ or send mailto:info@triexminerals.com
Message sent on Thu Jul 17, 2008 at 10:02:08 AM Pacific Time
=======================================================================
.