| | Publié le 03 mars 2008 | New High Grade Intersections Expand Zones at Bracemac and McLeod |
|
Article
|
Commentaires
|
Commenter
|
Notation
|
♥
Suivre la société
|
|
|
March 3, 2008
|
Donner Metals Ltd.: New High Grade Intersections Expand Zones at Bracemac and
McLeod
|
VANCOUVER, BRITISH COLUMBIA--(Marketwire - March 3, 2008) - Mr. Harvey Keats, Chief Executive Officer of Donner Metals Ltd. (TSX VENTURE:DON)(FRANKFURT:D4M), reports the expansion of the Bracemac Key Tuffite Zone with four new high grade intersections in a series of step-out drill holes, up-dip and down-plunge from previously reported sulphide intersections. Also reported are zinc and copper-rich sulphides returned from step-out drilling at the New McLeod and West McLeod Zones.
Drilling Highlights
--------------------------------------------------------------------------
--------------------------------------------------------------------------
Core
DDH Length
(Depth) From To (metres) % Zn % Cu g/t Ag g/t Au
--------------------------------------------------------------------------
--------------------------------------------------------------------------
Bracemac Key
Tuffite Zone
--------------------------------------------------------------------------
--------------------------------------------------------------------------
BRC-08-63 425.85 429.10 3.25 6.00 1.92 82.59 0.27
--------------------------------------------------------------------------
--------------------------------------------------------------------------
BRC-08-64 310.80 321.00 10.20 11.62 0.39 17.74 0.14
--------------------------------------------------------------------------
including 310.80 316.30 5.50 17.67 0.67 26.51 0.17
--------------------------------------------------------------------------
--------------------------------------------------------------------------
BRC-08-65 254.20 256.70 2.50 29.84 0.04 6.62 0.03
--------------------------------------------------------------------------
--------------------------------------------------------------------------
BRC-08-66 279.5 282.75 3.25 18.96 1.12 27.19 0.13
--------------------------------------------------------------------------
--------------------------------------------------------------------------
New McLeod
Zone
--------------------------------------------------------------------------
--------------------------------------------------------------------------
MC-07-31W1 868.30 871.30 3.00 0.42 1.50 24.27 0.74
--------------------------------------------------------------------------
--------------------------------------------------------------------------
MC-07-31W2 881.05 884.65 3.60 18.48 2.01 31.09 0.58
--------------------------------------------------------------------------
--------------------------------------------------------------------------
MC-07-33 821.40 823.40 2.00 13.96 0.67 19.03 0.75
--------------------------------------------------------------------------
--------------------------------------------------------------------------
West McLeod
Zone
--------------------------------------------------------------------------
--------------------------------------------------------------------------
MC-07-30W1 582.24 584.48 2.24 0.89 2.77 12.23 0.05
--------------------------------------------------------------------------
-------------------------------------------------------------------------- Bracemac Area
Drill holes BRC-08-64, 65 and 66 were designed to test the up-dip extension of previously reported massive sulphides in the Bracemac Key Tuffite Zone. Drill hole BRC-08-64 was drilled 70 metres up-dip from BRC-07-47 (13.06% Zn, 2.09% Cu over 21.4 metres) and 30 metres west of BRC-07-53 (11.81% Zn, 1.01% Cu over 4.10 metres). BRC-08-65 was drilled 40 metres up-dip and to the east of BRC-08-64. Drill hole BRC-08-66 was drilled 30 metres west of BRC-08-64. The zone remains open up-dip.
One hole was drilled on the down-plunge extension of the Bracemac Key Tuffite Zone. BRC-08-63 was drilled 70 metres down-dip and to the west of BRC-07-60 (16.67% Zn, 0.41% Cu over 12.05 metres) and 50 metres west of BRC-07-61 (9.48% Zn, 2.81% Cu over 6.0 metres). The Bracemac Key Tuffite Zone remains open down-plunge.
McLeod Area
Two drill holes were completed to the east of the New McLeod Zone. Diamond drill hole MC-07-31W1 was drilled 35 metres east of MC-05-18W7 (18.5% Zn, 0.42% Cu over 11.59 metres) and MC-07-31W2 was drilled 65 metres east of MC-05-18W6 (9.62% Zn, 1.33% Cu over 32.22 metres) and 45 metres down-dip from MC-07-31W1. One hole was completed on the west side of the New McLeod Zone. MC-07-33 intersected the zone 80 metres to the west and up-dip from MC-05-18W4 (8.91% Zn, 1.88% Cu over 11.42 metres).
At the West McLeod Zone, MC-07-30W1 was completed as a wedge cut 25 metres up-dip from MC-07-30 (1.22% Zn, 3.00% Cu over 5.77 metres).
One stratigraphic hole, MC-05-20W1, was drilled 200 metres west and down-dip of the New McLeod Zone and intersected weakly mineralized Key Tuffite followed by strong alteration in the footwall.
Four drills are active on the Matagami Project with continued step-out drilling at Bracemac and McLeod. A total of 46,386 metres of diamond drilling has been completed since the project began in late 2006. Additional geological information, including maps and sections, is available at www.donnermetals.com.
The Matagami Project has an area of mutual interest of 4,750 square kilometres and presently includes 3,350 mineral claims covering 841 square kilometres. Taking advantage of Xstrata Zinc's extensive historical database, Donner and Xstrata Canada Corporation - Xstrata Zinc Canada Division (Xstrata Zinc) are using a combination of 3D data integration, innovative advanced technologies, new concepts and diamond drilling to explore for new deposits in this prolific mining camp.
The Matagami Mining Camp is a world-class mining district, with 18 known VMS deposits, including 10 past producers of varying sizes, including the giant Mattagami Lake Deposit (25.64 million tonnes of 8.2% Zn, 0.56% Cu, 20.91 g/t Ag and 0.41 g/t Au) discovered in 1957 and mined from 1963 to 1988. The area is host to historical production of 8.6 billion pounds of Zn and 853 million pounds of Cu and has established infrastructure including the town of Matagami, a railway, a paved road, and a 2,600 t/day mill owned by Xstrata Zinc.
Donner has the option to earn a 50% participating joint venture interest in the Matagami Project by incurring a total of $20 to $25 million of expenditures on exploration and related work on or before May 31, 2011. Upon earn-in by Donner, five separate joint ventures will be formed, covering the property and the area of interest. In each of the five joint venture areas, Xstrata Zinc has the option to earn back a 15% interest in each area by incurring up to $20 million on a feasibility study.
The Company's strategy is to explore for and discover zinc - copper deposits in the Matagami Camp and to leverage the general infrastructure and existing processing facilities within a known and well-established cost structure for developing VMS deposits. Donner's exploration objective is to investigate multiple stratigraphic horizons with potential for VMS mineralization including the prolific Key Tuffite horizon throughout the Matagami Camp. To date Donner has discovered new mineralization at Bracemac in the Upper Bracemac and Bracemac zones and the Key Tuffite horizon. In addition to delineation drilling at Old McLeod, Donner has discovered new mineralization at New McLeod and West McLeod at the Key Tuffite horizon at McLeod.
Supplementary Information
The field work on the Matagami Project is being carried out by project operator Xstrata Zinc Canada Division who is responsible for the sampling, submittal of samples for assay, assay verification and QA/QC. Assaying of samples reported in this news release was carried out and certified by ALS Chemex-Chimitec, of Val D'Or, Quebec (zinc, copper and silver by atomic absorption, and gold by standard fire assay procedures). Sample preparation was done by ALS Chemex of Val D'Or, Quebec. Robin Adair, VP of Exploration for the Company is the Qualified Person responsible for the technical information in this news release.
ON BEHALF OF THE BOARD OF DONNER METALS LTD.
Harvey Keats, Chief Executive Officer
To view Table 1 - New Results please click on the following link: http://media3.marketwire.com/docs/dontables.pdf
The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.
|
|
CONTACT INFORMATION:
Donner Metals Ltd. Harvey Keats Chief Executive Officer (604) 683-0564 or Toll Free: 1-800-909-8311 Fax: (604) 602-9311 Email: donner@bed-rock.com Website: www.donnermetals.com
|
INDUSTRY: Manufacturing and Production - Mining and Metals
|
|
|
|
|
Données et statistiques pour les pays mentionnés : Canada | Tous Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous
|
Sphinx Resources
|
|
EXPLORATEUR |
CODE : SFX.V |
ISIN : CA8484221012 |
|
| |
ProfilIndicateurs de MarchéVALEUR : Projets & res.Communiqués de PresseRapport annuelRISQUE : Profile actifsContactez la cie |
Sphinx est une société développant des projet miniers de zinc et de cuivre basée au Canada. Sphinx est en développement de projets de zinc, de cuivre, d'argent et d'or au Canada. Son principal projet en développement est PD1 au Canada et ses principaux projets en exploration sont SOUTH VOISEY BAY, WEST RAGLAN et MATAGAMI au Canada. Sphinx est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 838 700 CA$ (670 585 US$, 638 839 €). La valeur de son action a atteint son plus haut niveau récent le 26 août 2016 à 0,14 CA$, et son plus bas niveau récent le 06 décembre 2022 à 0,01 CA$. Sphinx possède 83 870 000 actions en circulation. |
Financements de Sphinx Resources |
Projets de Sphinx Resources |
|
Communiqués de Presse de Sphinx Resources |
30/12/2013 | Announces Completion of Share Consolidation |
13/12/2013 | Announces Results From AnnualGeneral and Special Meeting and... |
14/11/2013 | Annual and Special General Meeting |
18/07/2013 | Announces Closing of C$2,807,010 Placement |
08/07/2013 | =3A Copper Stream with Sandstorm Amended |
08/07/2013 | Donner Metals Copper Stream With Sandstorm Amended |
14/03/2013 | Announces Financial Support from Quebec Institutions |
15/01/2013 | Stock Options Granted |
01/11/2012 | Ltd=2E: Increased Upfront Paymen =?ISO-8859-1?Q?t=20From=20S... |
22/10/2012 | Announces Results from Annual General Meeting, Head Office M... |
22/10/2012 | Announces Results from Annual General Meeting, Head Office M... |
04/10/2012 | Underground photos and video updates from Donner Metals |
19/09/2012 | Ltd=2E: Mcleod Zone Extended Up-Dip: Exploration Drilling In... |
28/08/2012 | =3A President's Message |
17/04/2012 | Normand Champigny Appointed President of Donner Metals |
23/02/2012 | Sandstorm Partners With Donner Metals |
22/02/2012 | Ltd=2E: Development to Reach the McLeod Zone a Year Ahead of... |
22/02/2012 | News Release |
20/01/2012 | Join us at at the Vancouver Resource Show and Exploration Ro... |
01/09/2011 | September Video update from Donner Metals |
13/07/2011 | Sandstorm Provides US$25 Million Senior Financing |
14/04/2010 | Definition Drill Program Completed at Bracemac-McLeod |
03/02/2010 | $2,409,930 Financing Closed |
30/01/2010 | Financing Increased |
08/09/2009 | engineering contract and fast-tracked feasibility |
24/08/2009 | Two Near Term Production Stories |
22/06/2009 | Industrial Alliance Features Report on Donner Metals |
19/05/2009 | A "Green Shoot" Rising |
14/05/2009 | Is At The Starting Gate |
26/02/2009 | Hotsheet |
18/02/2009 | positioned for success |
09/02/2009 | featured in Mining Journal |
12/12/2008 | $1,048,000 Financing Closes |
04/12/2008 | AND XSTRATA ZINC CANADA WIN INTERNATIONAL EXPLORATION AWARD |
25/11/2008 | $1.0 Million Financing |
18/11/2008 | Donner Metals has fast-track potential says Reinhard |
31/07/2008 | Drilling Continues toDelineate and Expand Mineralization at... |
01/08/2008 | Hotsheet for 7/31/2008 |
28/05/2008 | $3 Million Debenture Offering |
27/05/2008 | Hotsheet for 5/27/2008 |
11/04/2008 | Hotsheet for 4/11/2008 |
20/03/2008 | March Chairman's Letter |
05/03/2008 | Hotsheet for 3/5/2008 |
01/02/2008 | Engages Mau Capital to Provide Investor Relations |
08/01/2008 | Hotsheet for 1/8/2008 |
07/12/2007 | Chairman's Letter |
28/11/2007 | Expands Interest in Matagami Camp |
08/11/2007 | Join us at the San Francisco Hard Assets Investment Conferen... |
22/10/2007 | Hotsheet for 10/21/2007 |
02/08/2007 | 6 New Massive Sulphide =?ISO-8859-1?Q?=20Intersections,=20In... |
14/06/2007 | New Zinc-Copper Discover 9.24% Zinc, 0.99% Copper Over 27.95... |
07/06/2007 | Bracemac Yields Additional Results With New Mineralization I... |
11/04/2007 | Copper-Rich Massive Sulphides Intersected in BRC-07-32 in th... |
Publication de commentaires terminée |
|
|