Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
Cours Or & Argent

VanEck Vectors Global Alternative Energy ETF

Publié le 04 août 2015

Copper North Drilling Expands Copper Mineralization at Carmacks Project, Yukon

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Copper |

Copper North Drilling Expands Copper Mineralization at Carmacks Project, Yukon

VANCOUVER, BRITISH COLUMBIA--(Marketwired - Aug 4, 2015) - Copper North Mining Corp. ("Copper North" or the "Company") (TSX VENTURE:COL) has completed eight drill holes in the 2000S Zone, at Carmacks Project, to provide the additional information required to estimate new mineral resources of oxide and sulphide mineralization. Previous resource inventories have been limited to the proposed open pit area that consists of Zones 1, 4, 7 and 7a. The 2015 drill program is focused on expansion of oxide and sulphide mineral resources and is focusing on the southern extension of the proposed open pit area.

Initial fill-in drilling at 2000S zone has confirmed continuity of both oxide and sulphide mineralization. The drill has now moved to the much larger Zones 13 and 12 areas that have an aggregate strike length of 1500 meters. The definition drilling has potential for a substantial addition to mineral resources.

2000S Zone

Zone 2000S is immediately south of the proposed open pit area. All eight drill holes intersected the mineralized structure. The new and historic drill holes define a wedge shaped zone with a strike length of 300 meters and up to 150 meters vertically: a tonnage potential of approximately 1,100,000 tonnes is indicated of which about 300,000 tonnes is oxide mineralization.

The drill hole density and trench sampling are sufficient for determination of mineral resources for the 2000S zone; Copper North is awaiting assays. Details of drill hole location and historic assay results are available on Copper North's web site www.coppernorthmining/com.

Zones 13 and 12

Copper North is now drilling in the much larger Zones 13 and 12 which are located on the south side of Williams Creek, approximately 150 meters to the south of Zone 2000S.The target in Zone 13 has a strike length of 650 metres and Zone 12 is the southern extension of Zone 13. Drilling is in progress, with fans of drill holes between the previous 120 meter spaced drill cross sections (4400 and 4800 feet historic drill sections) in Zone 13.

Previous drilling has identified up to 70 metres vertical depth of oxide mineralization overlying sulphide mineralization that has been intercepted to depths of 200 meters and remains open to depth. Current drilling is focused on near surface mineralization to a depth of 150 meters and includes both oxide and sulphide mineralization. Recent trenching and detailed ground magnetic surveys have defined the mineralized structure and identified new zones of oxide mineralization.

Cross-sections of historic drill hole intercepts and location of new and planned drill holes are available on Copper North's web site. Historic drilling in this 150 to 200 meter section of the mineralization indicates potential of 2.8 million tonnes of oxide and approximately 6.8M tonnes of sulphide mineralization. Extension of the mineralization now being drilled has the potential for substantial additional increase of oxide and sulphide mineralization.

Gap North

Copper North previously stated that it would explore for the continuation of Zone 1 to the north of the proposed open pit (July 20, 2015 news release). The Gap North area has extensive overburden and valley fill materials. Drilling in the North Gap area is now being deferred as the Zone 2000S and Zone 13 and 12 have more near surface potential.

Mineral Resources and Expansion Opportunity

The Measured and Indicated mineral resource estimate totals 11,980,000 tonnes grading 1.07% total copper, of which 0.86% is soluble copper (see Preliminary Economic Assessment filed on SEDAR on May 30, 2014, the "PEA"). The mineral resource estimate also contains substantial gold and silver. The resource in the oxide classification forms the basis for the potentially mineable mineralization by open pit methods as described in the PEA.

The current drill plan has established an initial target of expanding oxide mineral resources by approximately 4M tonnes and a greater amount of sulphide mineralization. A mineral resource inventory for Zones 2000S, 13 and 12 will be undertaken when all drill and trench results are received.

Carmacks Mineral Resources (at a 0.25% Total Copper Cut-Off)

Zone Class Tonnage t (000) TCu
(%)
Acid Sol Cu (%) Sulphide
Cu (%)
Au
(g/t)
Ag
(g/t)
Oxide Measured (ME)
Indicated (IN)
ME+IN
Inferred
4,031
7,949
11,980
90
1.10
1.04
1.07
0.73
0.90
0.83
0.86
0.53
0.20
0.20
0.21
0.20
0.588
0.391
0.456
0.128
5.666
4.039
4.578
1.809
Sulphide Measured (ME)
Indicated (IN)
ME+IN
Inferred
695
3,645
4,340
4,031
0.80
0.74
0.75
0.71
0.02
0.03
0.03
0.01
0.77
0.71
0.73
0.70
0.261
0.205
0.221
0.179
2.542
2.296
2.369
1.900

Dr. Harlan Meade, P.Geo. is the Qualified Person responsible for the preparation of this news release.

On behalf of the Board of Directors:

Dr. Harlan Meade, President, CEO and Director

About Copper North

Copper North is a Canadian mineral exploration and development company. Copper North's assets include the Carmacks Project located in the Yukon, the Redstone Property located in the Northwest Territories, and the Thor Property in British Columbia. Copper North trades on the TSX Venture Exchange under the symbol COL.

This news release includes certain forward-looking information or forward-looking statements for the purposes of applicable securities laws. These statements include, among others, statements with respect to results from previous exploration on the Carmacks Project; proposed exploration plans, their timing, and results achieved from such activity; the potential for expanding the known mineral resources; development, engineering and permitting activities, and their timing; and future economic operating results. These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties and other factors, which may cause the actual results, performance or achievements to differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from the Company's expectations include, among others, the timing and success of future exploration and development activities, exploration and development risks, market prices, exploitation and exploration results, availability of capital and financing, general economic, market or business conditions, uninsured risks, regulatory changes, defects in title, availability of personnel, materials and equipment, unanticipated environmental impacts on operations and other exploration risks detailed herein and from time to time in the filings made by the Company with securities regulators. In making the forward-looking statements, the Company has applied several material assumptions including, but not limited to, the proposed exploration and development of the Carmacks Project will proceed as planned; early exploration success will increase mineral resources; market fundamentals will result in sustained metals and mineral prices, and any additional financing needed will be available on reasonable terms. The Company expressly disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise except as otherwise required by applicable securities legislation.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Lire la suite de l'article sur finance.yahoo.com

VanEck Vectors Global Alternative Energy ETF

PRODUCTEUR
CODE : COL.V
ISIN : CA62946X1042
CUSIP : 197801103
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

MWN Mining est une société développant des projet miniers d'or basée au Canada.

MWN Mining détient divers projets d'exploration au Mexique.

Son principal projet en production est LLUVIA DE ORO au Mexique et ses principaux projets en exploration sont NORTH SONORA, CAMPAMENTO MEXICO et LLUVIA JOJOBA au Mexique.

MWN Mining est cotée au Canada et aux Etats-Unis D'Amerique. Sa capitalisation boursière aujourd'hui est 2,4 millions (1,8 millions US$, 1,5 millions €).

La valeur de son action a atteint son plus haut niveau récent le 07 juillet 2006 à 0,41 , et son plus bas niveau récent le 01 avril 2020 à 0,01 .

MWN Mining possède 47 442 200 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de VanEck Vectors Global Alternative Energy ETF
Annual Report 2007
Financements de VanEck Vectors Global Alternative Energy ETF
19/03/2015Copper North Completes Private Placement
04/11/2013Copper North Extends Expiry Date of Warrants
30/10/2009NWM Mining Corporation Announces Closing of the Previously A...
01/10/2009Initial Closing and an Increase and Extension in Size of Pri...
04/09/2009Finalizes Terms for Non-Brokered Private Placement
28/07/2009NWM Press Release - NWM Mining Announces Non-Brokered Privat...
28/01/2009Announces Non-Brokered Private Placement
11/12/2008NWM Mining Press Release - NWM Announces First Draw on New C...
09/04/2008Announces Non-Brokered Private Placement
Attributions d'options de VanEck Vectors Global Alternative Energy ETF
02/10/2009NWM Mining Corporation Grants Stock Options
Nominations de VanEck Vectors Global Alternative Energy ETF
22/05/2013NWM Appoints Darren Koningen, P.Eng as President & COO
29/06/2012Mark Selby Joins NWM Board of Directors
13/05/2011NWM announces John Van De Beuken as COO
Projets de VanEck Vectors Global Alternative Energy ETF
31/01/2013NWM Reports 2012 Production Highlights
27/09/2012NWM Drills 1.03 g/t Au over 23.0 Metres from surface at Gold...
06/06/2012NWM Reports High Grade Results on Drilling at Gold Ridge
03/08/2011NWM Provides Lluvia-Jojoba Mine Update For July
07/07/2011NWM Provides Lluvia-Jojoba Mine Update & Announces New CFO
01/06/2011(Lluvia De Oro)NWM Provides Update on Gold Ridge Zone Exploration
26/05/2011(Lluvia Jojoba)Bi-weekly Update for Lluvia-Jojoba Project May 25, 2011
13/05/2011(La Jojoba)Lluvia de Oro / La Jojoba Project Up-date
28/04/2011(Lluvia De Oro)NWM provides Gold production and Lluvia de Oro mine update
27/04/2011(Lluvia De Oro)NWM provides update on new Gold Ridge discovery zone at Lluv...
08/04/2011(Lluvia Jojoba)NWM identifies another exploration target with high gold-cop...
31/03/2011(La Jojoba)NWM reports high-grade gold intercepts (3m of 11.15 g/t Au) ...
29/03/2011(La Jojoba)Bi-weekly Update for Lluvia-Jojoba Mine : 29, March, 2011
09/02/2011(Campamento Mexico)NWM Commences Exploration at Campamento
01/12/2010(Lluvia De Oro)NWM Drills 15 Meters of 1.082 g/t Au, 18.88 g/t Ag and 0.401...
21/07/2010(La Jojoba) Files Pre-Feasibility with Increase in Reserves
20/07/2010(Lluvia De Oro)Drills 2.155 g/t Au over 25.9 Meters at Lluvia de Oro (R10-0...
19/05/2010(La Jojoba)Lluvia de Oro & La Jojoba Mineral Resources and Reserves
17/09/2009(Lluvia De Oro)Lluvia de Oro Mine Update
08/08/2009(Lluvia De Oro)Lluvia de Oro Mine Update
24/07/2009(Lluvia De Oro)Lluvia de Oro Mine Update
05/03/2009(Lluvia De Oro)Assumes Financial and Operational Obligations at Lluvia-Jojo...
19/02/2009NI 43-101 Compliant Report for Sierra Pinta Gold Mine
14/11/2008(Lluvia De Oro)Lluvia de Oro Mine Update
04/06/2008(Lluvia De Oro)Lluvia de Oro Mine Update
07/05/2008(Lluvia De Oro)Lluvia de Oro Mine Update
26/02/2008(Lluvia De Oro)Lluvia-Jojoba Gold and Copper Mine Project Update
21/12/2007(Pii (pescarado Ii )) Files NI 43-101 Technical Report For PII, 2005-2007
02/10/2007(Lluvia De Oro)Columbia Metals Report - Lluvia de Oro Site - Bi-Weekly Upd...
Communiqués de Presse de VanEck Vectors Global Alternative Energy ETF
11/01/2016Copper North Announces Results of Phase 2 Drilling at Carmac...
26/10/2015Copper North Resumes Drilling of Carmacks Copper Mineralizat...
22/10/2015Copper North Clarifies Technical Disclosure
23/09/2015Copper North Expands Copper-Gold Mineralization at Carmacks ...
08/09/2015Copper North Announces Results From Drilling at Carmacks Pro...
04/08/2015Copper North Drilling Expands Copper Mineralization at Carma...
20/07/2015Copper North Commences Drilling at Carmacks Project, Yukon
02/07/2015Copper North Updates Improved Processing Plan for Carmacks P...
26/01/2015Expectations on Stimulus Fuel Hope for Copper Demand
21/01/2015Copper North Mining Corp.: Agitated Leach Process Provides O...
08/01/2015Copper North Grants Stock Options
05/01/2015Copper North Mining Corp.: Carmacks 2014 Exploration Project...
08/12/2014Copper North Clarifies Disclosure
25/11/2014Copper North Completes Warrant Incentive Program
17/11/2014Copper North Appoints Joseph Ringwald as Project Manager for...
14/10/2014Copper North Announces Joint Canada-China Feasibility Study ...
01/10/2014Copper North Commences Geophysical Survey on Thor Property i...
02/09/2014Copper North Progress at Carmacks Project, Yukon
27/08/2014Copper North Grants Stock Options
21/08/2014Copper North Exploration Success on Carmacks Project, Yukon
14/07/2014Copper North Files Carmacks Preliminary Economic Assessment
11/07/2014Copper North Completes Acquisition of Thor Property
02/07/2014Copper North Announces Agreement to Acquire Thor Property in...
23/06/2014Copper North Issues Shares to Repay Debt
17/06/2014Copper North Announces Loan Conversion
30/05/2014Copper North Announces Results of Preliminary Economic Asses...
25/04/2014Copper North Announces Closing of Private Placement
30/09/2013Copper North Executes Share Exchange Agreement
29/08/2013TORONTO =E2?? NWM Announces Start of Mining
28/06/2013NWM Announces Issuance of Bonus Shares
15/06/2013NWM Announces Debt Extension and Embarks on New Direction un...
08/05/2013Copper North Announces Loan Agreement and Deferred Salary Ag...
01/05/2013NWM reports a net income of $3,393,813 for 2012
04/04/2013(Lluvia De Oro)NWM Announces Drill Program to Increase Resources/Reserves a...
19/02/2013NWM Engages U.S. Business Development and Investor Relations...
19/02/2013Copper North Announces Results of 2012 Exploration Program, ...
17/01/2013Corporate Update January 17, 2013
16/10/2012Corporate Update October 17, 2012
21/09/2012NWM Successfully Negotiates Extension of Debt Facility to Ju...
31/08/2012NWM Loan Facility Update
23/08/2012NWM reports a profit of $1.8 million for Q2 2012
26/06/2012NWM and BioteQ Settle Lawsuit
19/06/2012NWM Signs Agreement to Purchase SART Plant Equipment
31/05/2012NWM reports a profit of $2.1 million for Q1 2012
26/04/2012NWM and BioteQ Settle Lawsuit
11/04/2012NWM produces 4,761 oz. Au in Q1.2012
07/02/2012NWM January Operational Update and Private Placement
17/01/2012NWM Provides Q4 2011 Update
30/11/2011Corporate Update November 18, 2011
30/09/2011Corporate Update September 23, 2011
12/09/2011Corporate Update September 9, 2011
29/08/2011NWM Q2 2011 Results and Lluvia-Jojoba Project Update
26/08/2011Corporate Update August 26, 2011
28/06/2011Greg McCoach Provides NWM Update
20/08/2010NWM Begins Mining at Lluvia de Oro & Draws on Standby Facili...
23/04/2010Receives Permits for Mining
05/01/2010NWM Mining Corporation Announces Share Issuance
15/12/2009First Phase Drill Program to Commence at Lluvia de Oro / La ...
08/12/2009NWM Settles Outstanding Tara Gold Resources Interest in Lluv...
10/08/2009New NWM Mining Corporation Presentation
24/06/2009Announces New Trading Symbol
10/03/2009Announces Share Issue
10/02/2009New Mining and Oil & Gas Research Website - StockResearchPor...
27/01/2009NWM Announces Convertible Debenture Restructuring
01/10/2008Lluvia de Oro Mine Update
17/09/2008Lluvia de Oro Mine Update
04/09/2008Lluvia de Oro Mine Update
20/08/2008Lluvia de Oro Mine Update
01/08/2008Press Release - NWM Pours First Gold at Lluvia-Jojoba Projec...
31/07/2008Lluvia de Oro Mine Update
25/07/2008Acorns to Mighty Oaks Initial Review - Published on Stockhou...
16/07/2008Lluvia de Oro Mine Update
02/07/2008Lluvia de Oro Mine Update
27/06/2008Columbia Announces Name Change
18/06/2008Lluvia de Oro Mine Update
05/06/2008 Profiled in The Market Traders' Commodity Supercycle Report
09/05/2008Hinde Gold Fund April 2008 Investor Letter
08/04/2008 Reports Option Payment at Lluvia de Oro
07/04/2008 Announces CDN $3M Financing Facility for Lluvia-Jojoba Gold
03/04/2008 Lluvia de Oro Mine Update
26/03/2008 Announces Addition To The Board of Directors
24/02/2008Lluvia de Oro Mine Update
16/01/2008Lluvia de Oro Mine Update
14/12/2007Lluvia de Oro Site - Bi-Weekly Update
12/12/2007Reports Option Payment at Lluvia de Oro
31/10/2007Lluvia de Oro Site - Bi-Weekly
30/10/2007Purchases Heavy Equipment for Lluvia de Oro Gold Mine
04/10/2007 Announces Transfer of Environmental & Mining Permits
18/09/2007Lluvia de Oro Site - Bi-Weekly Update - RESEND
01/09/2007(angl) Announces Investor Relations Engagement
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (COL.V)OTHER OTC (NWMMF)
0,050+0.00%0,003+0.00%
TSX-V
CA$ 0,050
30/11 10:46 -
0%
Cours préc. Ouverture
0,050 0,055
Bas haut
0,050 0,055
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,050 -%
Volume var. 1 mois
14 000 -%
24hGold TrendPower© : -28
Produit Gold
Développe
Recherche
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2020100,00%0,070,01
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
6,92 AU$-0,65%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 +100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,92 US$+7,80%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,59 GBX-1,50%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,25 +4,17%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 +0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
14,47 +2,26%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,30 +3,45%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,22 +0,93%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
2,47 +2,49%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
40,66 US$+0,20%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,06 AU$+10,00%Trend Power :
Sun Res.(Oil)SUR.AX
Released ASX Announcement: Quarterly Activities Report
0,00 AU$+0,00%Trend Power :
Profil de VanEck Vectors Global Alternative Energy ETF | Articles sur VanEck Vectors Global Alternative Energy ETF | Indicateurs de marché de VanEck Vectors Global Alternative Energy ETF | Projets et ressources de VanEck Vectors Global Alternative Energy ETF | Valorisation de VanEck Vectors Global Alternative Energy ETF | Voir les mines de VanEck Vectors Global Alternative Energy ETF | Présentation de l'entreprise VanEck Vectors Global Alternative Energy ETF | Rapport annuel de VanEck Vectors Global Alternative Energy ETF | Management de VanEck Vectors Global Alternative Energy ETF | Graphique interactif de VanEck Vectors Global Alternative Energy ETF | Graphiques gratuits de VanEck Vectors Global Alternative Energy ETF | VanEck Vectors Global Alternative Energy ETF TSX-V | VanEck Vectors Global Alternative Energy ETF OTHER OTC
Profitez de la hausse des actions aurifères
  • Inscrivez-vous à notre market briefing minier
    hebdomadaire
  • Recevez nos rapports sur les sociétés qui nous semblent
    présenter les meilleurs potentiels
  • Abonnement GRATUIT, aucune sollicitation
  • Offre limitée, inscrivez-vous maintenant !
Accédez directement au site.